Not Your Typical Turbo Blower New Holstein Utilities Blower - - PowerPoint PPT Presentation

not your typical
SMART_READER_LITE
LIVE PREVIEW

Not Your Typical Turbo Blower New Holstein Utilities Blower - - PowerPoint PPT Presentation

Not Your Typical Turbo Blower New Holstein Utilities Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue) Background New Holstein Utilities Population (~3200) Design Flow (1.33 mgd) Load (1600 ppd BOD) Current


slide-1
SLIDE 1

Not Your Typical Turbo Blower

New Holstein Utilities’ Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue)

slide-2
SLIDE 2

Background

 New Holstein Utilities

 Population (~3200)  Design

 Flow (1.33 mgd)  Load (1600 ppd BOD)

 Current

 Flow (0.5 mgd)  Load (680 ppd BOD)

slide-3
SLIDE 3

Background

 Permit Requirements

 BOD (20/30 mg/L)  TSS (20/30 mg/L)  TP (1.0 mg/L)  No disinfection

 Operational Practices

 Extended Air (Nitrification)  Septage Receiving (Slugs)

slide-4
SLIDE 4

Background

 Aeration Blowers

 Type – Rotary Lobe  Function – Aeration and Digester  Condition – End of Useful Life  Reliability Concerns  Inefficient

slide-5
SLIDE 5

Background

 Aeration Blowers

 Operational Limitations

 Constant Speed  40HP / 30HP

 Age

 2 Failed  2 Used Units

40 HP 40 HP 30 HP 30 HP 30 HP DIGESTER AERATION Typically run 70 / 100 HP for 1600 scfm / 2300 scfm (mixing limited)

slide-6
SLIDE 6

Facilities Plan

 Blower Replacement  Ancillary Systems

 Building  Decant Tanks  WAS Control  Sludge Pumps  Standby Generator  DO Control  Lab Temperature  Workshop/Garage Bay

slide-7
SLIDE 7

Facilities Plan

 Blower Replacement Alternatives

 Replace In-Kind – Rotary Lobe Blowers  Single Stage Centrifugal (Turbo) Blowers

 Efficiency

 Life Cycle Cost Evaluation

 Upgrade Electrical Service

 230V vs. 480V Power

 Recommended Further Consideration

slide-8
SLIDE 8

Facilities Plan / Preliminary Design

Single Stage Centrifugal Blowers

High Speed Turbo (Sulzer/APG-Neuros)

 Specialized Electronics  Cost

Integrally Geared with Sliding Vane (Turblex)

 High Capacity / Cost

Integrally Geared with VFD (Inovair)

 New

D.O. Control Modulating Valve to Aerobic Digester

slide-9
SLIDE 9

Design Concepts

 Design:

  • A. Evaluated Blower Bid
  • B. D.O. Control
  • C. Modulating Valve
  • D. 3-D Model
slide-10
SLIDE 10

A) Blower Evaluation

 Evaluated Bid:

 Rotary Lobe Blowers  Inovair

 Early Adopter=Attractive Pricing

(and random issues…)

100,000 200,000 300,000 400,000 500,000 600,000 700,000 800,000 900,000 1,000,000 5 10 15 20 PW Cumulative Cost (2015$) Years after Installation HST - Inovair PD - Aerzen

Assumed $0.10/kwh for two blowers operated 24 hours per day, total of 2000 scfm.

slide-11
SLIDE 11

B) Dissolved Oxygen Control

slide-12
SLIDE 12

C) Modulating Digester Valve

 Concept

 Throttle digester header when liquid

levels are lower to balance airflows

 Less overall horsepower

(Note: can’t pinch both ends)

 Allow flexibility to run a dedicated

blower(s) to each side

50 HP 50 HP 50 HP DIGESTER AERATION 5-6 psi 1-6 psi 50 HP M M

slide-13
SLIDE 13

D) 3-D Models

 Design:

 3-D Model  Pump Gallery – Operator Input allowed

ability to pull/push flow every direction

slide-14
SLIDE 14

Funding

BIDS

Low Bidder:

$2,149,000

GRANTS

Aeration Blower:

Projected Energy Savings ($16,500) Building Heat:

Electric Heat  Gas Heat Savings ($7,500) Grant Value

$ 33,976 WPPI

$ 68,165 Focus on Energy

$364,382 CWF Principal Forgiveness $466,523 Total (22%)

$1,682,477 (net cost)

slide-15
SLIDE 15

Construction and Startup Photos

slide-16
SLIDE 16

Construction and Startup Photos

slide-17
SLIDE 17

Construction and Startup Photos

slide-18
SLIDE 18

Construction and Startup Photos

slide-19
SLIDE 19

Construction and Startup Photos

slide-20
SLIDE 20

Construction and Startup Photos

slide-21
SLIDE 21

Construction and Startup Photos

(No trees were harmed on this portion of the project)

slide-22
SLIDE 22

Construction and Startup Photos

slide-23
SLIDE 23
slide-24
SLIDE 24

Valved Flexibility

 Design:

 Eliminated 1 pump  Some flowpaths can flow

by gravity or pump

 Rotary lobe pumps allow

multi-use

 All three can really move

some sludge

 Sacrificed Automation

slide-25
SLIDE 25
slide-26
SLIDE 26

Operation

 Startup Plan

 How to sequence blower demo/startup to

prove new units are fully functional? (...Very Carefully)

slide-27
SLIDE 27

Operation

 The Blowers Work!*

 Designed to typically need 2 blowers

 Now to Optimize

 Reduce DO  Reduce Mixing Limited  Reduce Digester Airflow

 Limitations:

 Blower Turndown (Range 70-100%)  Inovair now offers wider-range units,

consider varying sizes (or rpms?)

slide-28
SLIDE 28

Operation

 Blower PLC Programming

 Surge Protection Feature

 Manual reset  Head rise to surge worse at VFDmin  Ramps up VFD, fights valve PID

slide-29
SLIDE 29

 Blower PLC Programming

 Mass Airflow - Winter Operation  Adjusted PLC Temp Setting

Operation

slide-30
SLIDE 30

Operation

 Current

 Operating smooth now  Maintenance Items:

 Expensive Oil  Belt Tensioning  Air Filter

 Observed Energy Savings

 Average  Peak

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 J F M A M J J A S O N D $ / lb BOD Removed

Electric Utility

3-YRS BEFORE AFTER

slide-31
SLIDE 31

Operation

 Benchmarking

See Focus at Booth #136 Download Guide @ www.focusonenergy.com/guidebooks

slide-32
SLIDE 32

Operation

 Benchmark – Activated Sludge

5.4 MWh/MGD (average) 3.3 MWh/MGD (Top 25%) 3.0 MWh/MGD (Best Practice)

0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 J F M A M J J A S O N D MWh / MGD

Electric Utility

3-YRS BEFORE AFTER

 Benchmarking

 How does it compare?  Data Crunch  Keep Updated

slide-33
SLIDE 33

0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 J F M A M J J A S O N D kWh / lb BOD

Electric Utility

Operation

3-YRS BEFORE AFTER

 Benchmark – Extended Air

2.9 MWh/MGD

 Normalized for Loading  Heating Impact

 Summer

vs

 Winter

slide-34
SLIDE 34

200 400 600 800 1000 1200 1400 1600 1800 2000 $0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00 Heating Degree Days (deg F)

Electric and Natural Gas

Operation

3-YRS BEFORE AFTER

 Heating Improvements

 Cost:

 $40,000

 Benefit:

 Reduced OPEX  Lab temp control

 2-10 year payback without grants  Demand charge reductions

slide-35
SLIDE 35

0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 500 1000 1500 2000 $ / lb BOD Heating Degree Days (deg F)

Electric and Natural Gas

Operation

 Normalize for BOD

and Heating Blower System Efficiency 34.6 % Reduction

slide-36
SLIDE 36

50 100 150 200 250 Aug-12 Oct-12 Dec-12 Feb-13 Apr-13 Jun-13 Aug-13 Oct-13 Dec-13 Feb-14 Apr-14 Jun-14 Aug-14 Oct-14 Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 Feb-16 Apr-16 Jun-16 Aug-16 Peak 15 min kW

Demand Charge

Operation

3-YRS BEFORE AFTER

 Minimized Electric Heat

(some areas still have electric heat)

slide-37
SLIDE 37

Summary

 Blower Replacement

 Blowers

 Optimization 2.0

 Control System  Heating System

  • Come Visit!

INSERT Photo

slide-38
SLIDE 38

Summary

 More than Just a Blower

Replacement Project

 Blowers

 Continued Optimization

 Control System  Heating System

  • Come Visit!