not your typical
play

Not Your Typical Turbo Blower New Holstein Utilities Blower - PowerPoint PPT Presentation

Not Your Typical Turbo Blower New Holstein Utilities Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue) Background New Holstein Utilities Population (~3200) Design Flow (1.33 mgd) Load (1600 ppd BOD) Current


  1. Not Your Typical Turbo Blower New Holstein Utilities’ Blower Improvements Don Lintner (NHU) Eric Lynne (Donohue)

  2. Background  New Holstein Utilities  Population (~3200)  Design  Flow (1.33 mgd)  Load (1600 ppd BOD)  Current  Flow (0.5 mgd)  Load (680 ppd BOD)

  3. Background  Permit Requirements  BOD (20/30 mg/L)  TSS (20/30 mg/L)  TP (1.0 mg/L)  No disinfection  Operational Practices  Extended Air (Nitrification)  Septage Receiving (Slugs)

  4. Background  Aeration Blowers  Type – Rotary Lobe  Function – Aeration and Digester  Condition – End of Useful Life  Reliability Concerns  Inefficient

  5. Background 30 HP 30 HP  Aeration Blowers  Operational Limitations 30 HP  Constant Speed  40HP / 30HP DIGESTER AERATION  Age  2 Failed 40 HP  2 Used Units 40 HP Typically run 70 / 100 HP for 1600 scfm / 2300 scfm (mixing limited)

  6. Facilities Plan  Blower Replacement  Ancillary Systems  Building  Decant Tanks  WAS Control  Sludge Pumps  Standby Generator  DO Control  Lab Temperature  Workshop/Garage Bay

  7. Facilities Plan  Blower Replacement Alternatives  Replace In-Kind – Rotary Lobe Blowers  Single Stage Centrifugal (Turbo) Blowers  Efficiency  Life Cycle Cost Evaluation  Upgrade Electrical Service  230V vs. 480V Power  Recommended Further Consideration

  8. Facilities Plan / Preliminary Design Single Stage Centrifugal Blowers  High Speed Turbo (Sulzer/APG-Neuros)   Specialized Electronics  Cost Integrally Geared with Sliding Vane (Turblex)   High Capacity / Cost Integrally Geared with VFD (Inovair)   New D.O. Control Modulating Valve to Aerobic Digester

  9. Design Concepts  Design: A. Evaluated Blower Bid B. D.O. Control C. Modulating Valve D. 3-D Model

  10. A) Blower Evaluation 1,000,000 HST - Inovair 900,000 PD - Aerzen  Evaluated Bid: 800,000  Rotary Lobe Blowers 700,000  Inovair 600,000 PW Cumulative 500,000 Cost (2015$) 400,000 300,000  Early Adopter=Attractive Pricing (and random issues…) 200,000 100,000 Assumed $0.10/kwh for two blowers operated 24 hours per day, total of 2000 scfm. 0 0 5 10 15 20 Years after Installation

  11. B) Dissolved Oxygen Control

  12. C) Modulating Digester Valve 50 HP  Concept 50 HP  Throttle digester header when liquid levels are lower to balance airflows 50 HP  Less overall horsepower (Note: can’t pinch both ends) 50 HP AERATION DIGESTER 5-6 psi 1-6 psi M M  Allow flexibility to run a dedicated blower(s) to each side

  13. D) 3-D Models  Design:  3-D Model  Pump Gallery – Operator Input allowed ability to pull/push flow every direction

  14. Funding BIDS Low Bidder: $2,149,000  GRANTS Aeration Blower: Projected Energy Savings ($16,500)  Building Heat: Electric Heat  Gas Heat Savings ($7,500)  Grant Value $ 33,976 WPPI  $ 68,165 Focus on Energy  $364,382 CWF Principal Forgiveness  $466,523 Total (22%) $1,682,477 (net cost) 

  15. Construction and Startup Photos

  16. Construction and Startup Photos

  17. Construction and Startup Photos

  18. Construction and Startup Photos

  19. Construction and Startup Photos

  20. Construction and Startup Photos

  21. Construction and Startup Photos (No trees were harmed on this portion of the project)

  22. Construction and Startup Photos

  23. Valved Flexibility  Design:  Eliminated 1 pump  Some flowpaths can flow by gravity or pump  Rotary lobe pumps allow multi-use  All three can really move some sludge  Sacrificed Automation

  24. Operation  Startup Plan  How to sequence blower demo/startup to prove new units are fully functional? (...Very Carefully)

  25. Operation  The Blowers Work!*  Designed to typically need 2 blowers  Now to Optimize  Reduce DO  Reduce Mixing Limited  Reduce Digester Airflow  Limitations:  Blower Turndown (Range 70-100%)  Inovair now offers wider-range units, consider varying sizes (or rpms?)

  26. Operation  Blower PLC Programming  Surge Protection Feature  Manual reset  Head rise to surge worse at VFDmin  Ramps up VFD, fights valve PID

  27. Operation  Blower PLC Programming  Mass Airflow - Winter Operation  Adjusted PLC Temp Setting

  28. Operation  Current Electric Utility 0.70  Operating smooth now  Maintenance Items: 0.60  Expensive Oil $ / lb BOD Removed 0.50  Belt Tensioning  Air Filter 0.40 3-YRS BEFORE  Observed Energy Savings 0.30  Average  Peak 0.20 AFTER 0.10 0.00 J F M A M J J A S O N D

  29. Operation  Benchmarking See Focus at Booth #136 Download Guide @ www.focusonenergy.com/guidebooks

  30. Operation  Benchmarking  How does it compare? Electric Utility 14.00  Data Crunch  Keep Updated 12.00 10.00 MWh / MGD 8.00 3-YRS BEFORE 6.00  Benchmark – Activated Sludge 4.00 5.4 MWh/MGD (average) 3.3 MWh/MGD (Top 25%) 2.00 AFTER 3.0 MWh/MGD (Best Practice) 0.00 J F M A M J J A S O N D

  31. Operation  Normalized for Loading Electric Utility 8.00  Heating Impact  Summer 7.00 vs 6.00  Winter kWh / lb BOD 5.00 4.00  Benchmark – Extended Air 3-YRS BEFORE 3.00 2.9 MWh/MGD 2.00 AFTER 1.00 0.00 J F M A M J J A S O N D

  32. Operation  Heating Improvements Electric and Natural Gas 2000  Cost: 1800  $40,000 Heating Degree Days (deg F) 1600  Benefit: 1400  Reduced OPEX 1200  Lab temp control  2-10 year payback without grants 1000 800  Demand charge reductions 600 3-YRS BEFORE AFTER 400 200 0 $0.00 $2,000.00 $4,000.00 $6,000.00 $8,000.00 $10,000.00 $12,000.00

  33. Operation  Normalize for BOD Electric and Natural Gas and Heating 0.70 0.60 0.50 $ / lb BOD 0.40 Blower System Efficiency 0.30 34.6 % Reduction 0.20 0.10 0.00 0 500 1000 1500 2000 Heating Degree Days (deg F)

  34. (some areas still have electric heat)  Minimized Electric Heat Operation Peak 15 min kW 100 150 200 250 50 0 Aug-12 Oct-12 Dec-12 Feb-13 Apr-13 Jun-13 Aug-13 Oct-13 Demand Charge Dec-13 Feb-14 Apr-14 3-YRS BEFORE Jun-14 Aug-14 Oct-14 Dec-14 Feb-15 Apr-15 Jun-15 Aug-15 Oct-15 Dec-15 AFTER Feb-16 Apr-16 Jun-16 Aug-16

  35. Summary  Blower Replacement INSERT Photo  Blowers  Optimization 2.0  Control System  Heating System - Come Visit!

  36. Summary  More than Just a Blower Replacement Project - Come Visit!  Blowers  Continued Optimization  Control System  Heating System

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend