Northern Branch Corridor Northern Branch Corridor Public Scoping - - PowerPoint PPT Presentation
Northern Branch Corridor Northern Branch Corridor Public Scoping - - PowerPoint PPT Presentation
Northern Branch Corridor Northern Branch Corridor Public Scoping Meeting Public Scoping Meeting Wednesday, October 24, 2007 Wednesday, October 24, 2007 Agenda Agenda Introductions Introductions Project History Project History
SLIDE 1
SLIDE 2
Agenda Agenda
- Introductions
Introductions
- Project History
Project History
- Project Status
Project Status
- EIS Process
EIS Process
- Other Issues
Other Issues
SLIDE 3
I ntroductions I ntroductions
SLIDE 4
Project History Project History
SLIDE 5
Project History Project History
- West Shore Study
West Shore Study
– – Proposed Regional Transit Proposed Regional Transit Network Serving Bergen & Network Serving Bergen & Rockland Counties Through Rockland Counties Through 3 Corridors 3 Corridors
- West Shore: Commuter Rail
West Shore: Commuter Rail Sports Complex Sports Complex
- Northern Branch: Light Rail
Northern Branch: Light Rail
- Passaic Bergen: Light Rail
Passaic Bergen: Light Rail
PASSAIC BERGEN LIGHT RAIL LINE (proposed)
SLIDE 6
Project History Project History
- Northern Branch HBLR Extension Alternative
Northern Branch HBLR Extension Alternative
– – Recommended through Alternatives Analysis Recommended through Alternatives Analysis – – Assumed HBLR extended to Vince Lombardi P&R Assumed HBLR extended to Vince Lombardi P&R – – Operate from Tenafly to 83 Operate from Tenafly to 83rd
rd Street, North Bergen
Street, North Bergen – – Physical separation Physical separation between freight & LRT between freight & LRT – – Electrically Propelled Electrically Propelled – – Overhead Overhead Catenary Catenary
SLIDE 7
Project History Project History
- Changes that led to a fresh look of the
Changes that led to a fresh look of the project project
– – THE Tunnel THE Tunnel – – TriCounty TriCounty Rail Plan Rail Plan – – New Rail Passenger Technology (DMU) New Rail Passenger Technology (DMU)
SLIDE 8
Project History Project History
- Northern Branch DMU Alternative
Northern Branch DMU Alternative
– – THE Tunnel THE Tunnel – – TriCounty TriCounty Rail Plan Rail Plan – – Operate from Tenafly to North Bergen Operate from Tenafly to North Bergen – – Connections to HBLR Via New Transfer Station in Connections to HBLR Via New Transfer Station in North Bergen North Bergen – – FRA FRA-
- Compliant Diesel Multiple Unit (DMU) Railcar
Compliant Diesel Multiple Unit (DMU) Railcar
- Can Be Run on Same Tracks, at the
Can Be Run on Same Tracks, at the Same Time with Freight Service Same Time with Freight Service
SLIDE 9
Project Status Project Status
SLIDE 10
Project Status Project Status
- New NOI and Scoping
New NOI and Scoping
– – Reflect the analysis of two alternative Reflect the analysis of two alternative modes of transit modes of transit
SLIDE 11
Project Status Project Status
- Proposed Alternatives
Proposed Alternatives
– – No Action No Action – – HBLR Extension Alternatives HBLR Extension Alternatives Temporal Separation Temporal Separation
- Tenafly North terminus
Tenafly North terminus
- Englewood Route 4 terminus
Englewood Route 4 terminus
– – DMU Alternatives DMU Alternatives
- Tenafly North terminus
Tenafly North terminus
- Englewood Route 4 terminus
Englewood Route 4 terminus
SLIDE 12
Project Status Project Status
- North Bergen Junction
North Bergen Junction
- 91
91st
st Street
Street
- Ridgefield
Ridgefield
- Palisades Park
Palisades Park
- Leonia
Leonia
- Englewood Route 4
Englewood Route 4
- Englewood Town Center
Englewood Town Center
- Englewood Hospital
Englewood Hospital
- Tenafly Town Center
Tenafly Town Center
- Tenafly North
Tenafly North
Stations to be Studied Stations to be Studied
SLIDE 13
- THE Tunnel Connection
THE Tunnel Connection
- Hudson
Hudson-
- Bergen Light Rail connection
Bergen Light Rail connection to the Meadowlands (69 to the Meadowlands (69th
th Street
Street Station) Station)
Other Planning Considerations Other Planning Considerations
SLIDE 14
EI S Process EI S Process
SLIDE 15
EI S Process EI S Process
- NOI & Scoping Procedures
NOI & Scoping Procedures
– – Scoping Meeting Scoping Meeting – – Draft and Final Scoping Document Draft and Final Scoping Document
- Draft EIS
Draft EIS
- Agency/Public Review & Comment
Agency/Public Review & Comment
– – DEIS Public Hearing DEIS Public Hearing
- Final EIS
Final EIS
– – Address comments on DEIS Address comments on DEIS – – Agency/Public Review & Comment Agency/Public Review & Comment
- Record of Decision
Record of Decision
- Agency Action
Agency Action
SLIDE 16
- Transportation
Transportation
– – Air Quality Air Quality – – Noise & Vibration Noise & Vibration – – Traffic, Parking, Transit, Traffic, Parking, Transit, Pedestrians & Freight Rail Pedestrians & Freight Rail – – Energy & Potential for Energy & Potential for Conservation Conservation – – Electric & Magnetic Fields Electric & Magnetic Fields – – Safety & Security Safety & Security
Environmental Analysis Environmental Analysis
SLIDE 17
- Natural Environment
Natural Environment
– – Water Quality Water Quality – – Wetlands Wetlands – – Flooding Flooding – – Navigable Waterways & Coastal Navigable Waterways & Coastal Zones Zones – – Ecologically Sensitive Areas Ecologically Sensitive Areas – – Endangered Species Endangered Species – – Hazardous Waste Hazardous Waste
Environmental Analysis Environmental Analysis
SLIDE 18
- Built Environment
Built Environment
– – Land Acquisition & Displacement Land Acquisition & Displacement – – Land Use, Zoning & Economic Land Use, Zoning & Economic Development Development – – Consistency with Local Plans Consistency with Local Plans – – Historic Properties & Resources Historic Properties & Resources – – Parkland Parkland – – Archaeology Archaeology – – Aesthetics Aesthetics – – Community Disruption Community Disruption
Environmental Analysis Environmental Analysis
SLIDE 19
- Environmental Justice
Environmental Justice
– – Avoid disproportionately high and adverse Avoid disproportionately high and adverse effects on minority & low effects on minority & low-
- income populations.
income populations.
- Construction Impacts
Construction Impacts
– – Identify and minimize temporary impacts Identify and minimize temporary impacts associated with construction activities. associated with construction activities.
- Cumulative Effects and Indirect Impacts
Cumulative Effects and Indirect Impacts
– – Determine cumulative effects of this action Determine cumulative effects of this action with other past, present, and reasonably with other past, present, and reasonably foreseeable major actions. foreseeable major actions.
Environmental Analysis Environmental Analysis
SLIDE 20
Other I ssues Other I ssues
SLIDE 21
Other I ssues Other I ssues
- Hours of passenger service
Hours of passenger service
- Nighttime freight operations
Nighttime freight operations
- Freight customers
Freight customers
- Passenger rail storage facilities
Passenger rail storage facilities
- Future conversion to commuter rail
Future conversion to commuter rail
SLIDE 22
For More I nformation For More I nformation
Visit the project website at: Visit the project website at: http://northernbranchcorridor.com http://northernbranchcorridor.com Contact Us: Contact Us:
Linda A. Mosch, P.E. Linda A. Mosch, P.E. Project Director Project Director NJ TRANSIT NJ TRANSIT One Penn Plaza East One Penn Plaza East Newark, NJ 07105 Newark, NJ 07105-
- 2246
2246 info@northernbranchcorridor.com
SLIDE 23
Public Comment Public Comment Session Session
SLIDE 24