SLIDE 1 North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 2 Agenda
- Introductions
- Trail Overview
- Project Timeline
- Parking Lot Alternatives
- Emory Lane Bikeway
Extension Update
- Next Steps/Feedback
- Questions
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 3 Upper Rock Creek Trail Corridor Plan
Approved 2008
North Branch Trail Future Trail (by Parks) Preserve at Rock Creek Trail ICC Bikeway North Branch Trail (Proposed) Muncaster Mill Bikeway Emory Lane Bikeway Emory Lane Bikeway Extension (Future) North Branch Trail (Proposed) Lakeside Trail Lake Frank Trail Connector Rock Creek Trail
Lake Needwood Lake Frank ROCK CREEK REGIONAL PARK NORTH BRANCH STREAM VALLEY PARK OBGC Community Park HINES ROAD Magruder HS
SLIDE 4 Trail Plan
ROCK CREEK REGIONAL PARK Meadowside Nature Center Lake Frank NORTH BRANCH STREAM VALLEY PARK
Magruder High School Preserve at Rock Creek Trail ICC Bikeway North Branch Trail, Northern Extension (Proposed) Muncaster Mill Bikeway Emory Lane Bikeway Emory Lane Bikeway Extension (Future) North Branch Trail, Meadowside Lane Connector (Proposed) North Branch Trail (Proposed) Lakeside Trail Lake Frank Trail Connector Rock Creek Trail
Smith Env.
SLIDE 5 Project Timeline
Lake Frank Trail Connector complete
Facility Planning & public outreach
Planning Board approval
Detailed design begins
Received $2 Million FHWA TAP funding
Norbeck Manor HOA meeting
TAP Executive Committee scope review
Community Outreach
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 6 Neighborhood Concerns
Trailhead/Parking Lot
- Proposed parking lot and trail pose security risks to adjacent homes:
- Burglary
- Drug Dealing
- Illegal Dumping
- Proposed parking lot will cause traffic congestion at Sweetbirch Drive.
Emory Lane Bikeway Extension
- At-grade crosswalk at Emory Lane is dangerous for cyclists,
pedestrians and drivers.
- Pedestrian crossing at Emory Lane will cause traffic congestion at
Sweetbirch Drive.
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 7
Parking Lot Option A – Muncaster Mill Road
A
SLIDE 8
Parking Lot Option A – Muncaster Mill Road
SLIDE 9
Parking Lot Option A – Muncaster Mill Road
SLIDE 10
Parking Lot Option A – Muncaster Mill Road
MUNCASTER MILL ROAD DRIVEWAY PARKING TRAIL BIKE LANE
SLIDE 11
Parking Lot Option A – Muncaster Mill Road
SLIDE 12
Parking Lot Option B – Meadowside Lane
B
SLIDE 13
Parking Lot Option B – Meadowside Lane
LATHROP E. SMITH ENVIRONMENTAL EDUCATION CENTER
SLIDE 14
Parking Lot Option B – Meadowside Lane
SLIDE 15
Parking Lot Option B – Meadowside Lane
MEADOW- SIDE LANE PARKING TRAIL FOREST FOREST
SLIDE 16
Parking Lot Option B – Meadowside Lane
MEADOWSIDE NATURE CENTER
SLIDE 17 Alternative Comparison
Site/Context Muncaster Mill Road Meadowside Lane Existing Condition Former home site (previously disturbed) Forest edge Connecting Roadway Muncaster Mill Road (State Route 115) Meadowside Lane (park road) Connecting Trail(s) Emory Lane Bikeway (future extension) to ICC Bikeway Muncaster Mill Bikeway (existing) to ICC Bikeway Adjacent Properties Norbeck Manor HOA (adjoining) Residences (west); Smith Center, Meadowside Nature Center (shared access)
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 18 Alternative Comparison
Site Design Muncaster Mill Road Meadowside Lane Parking Space Access Dedicated driveway Direct pull-off from roadway Grading Impacts Significant (retaining walls necessary) Minimal fill Visibility Spaces visible from Muncaster Mill roadway Impacts to character and setting of Meadowside Lane Tree Impacts Minimal removals (previously disturbed site) Disturbance to edges
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 19 Alternative Comparison
Scope/Schedule Muncaster Mill Road Meadowside Lane Approvals Required SHA Utility Access Permit Planning Board approval Cost Implication None (included in Facility Plan) Change order to design consultant Schedule Impact Spring 2018 construction start (estimated) Winter 2019 construction start (estimated) Precedent Matthew Henson Trail – Layhill Road Lot Meadowside Nature Center Parking Lot
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 20 Project Schedule
Task Muncaster Mill Road Meadowside Lane Public Comment September, 2017 September, 2017 Planning Board TBD (Informational Only) November, 2017 Permit Submissions December, 2017 April, 2018 Construction RFP May, 2018 September, 2018 Construction Begins Spring, 2018 Winter, 2019 Construction Complete Fall, 2019 Summer, 2020
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017
SLIDE 21
We want to hear from you!
Visit www.montgomeryparks.org/projects/public-input/ and select the North Branch Hiker Biker Trail topic to comment.
A B
SLIDE 22
Emory Lane Bikeway Extension
SLIDE 23 Emory Lane Bikeway Extension
Possible Improvements along Muncaster Mill Road
- Traffic Signal at Emory Lane
- Enlarged median/refuge
- Existing drive lanes to remain
- 6-foot wide shoulder
- 9-foot wide vegetative buffer
- Stormwater management
- 10-foot wide shared use path
- South shoulder of Muncaster Mill
Road is currently 25 feet wide.
SLIDE 24 Contact Information
Aaron Feldman Project Manager (M-NCPPC) aaron.feldman@montgomeryparks.org 301-650-2887 Patricia Shepherd Capital Projects Manager (MCDOT) patricia.shepherd@montgomerycountymd.gov 240-777-7231 Mike Jones Park Manager mike.jones@montgomeryparks.org 301-563-7523
North Branch Hiker-Biker Trail
Community Meeting | 13 September, 2017