naval architect over half
play

Naval Architect Over Half Century By: George Kwan P.Eng. 2019 - PowerPoint PPT Presentation

Naval Architect Over Half Century By: George Kwan P.Eng. 2019 My Education Technical Staff of Peter Cheng Naval Architect & Marine Consultant Limited in Hong Kong Supervision at Koyo Dockyard at Mihara Japan 1974 Outfitting Crude Oil


  1. Naval Architect Over Half Century By: George Kwan P.Eng. 2019

  2. My Education

  3. Technical Staff of Peter Cheng Naval Architect & Marine Consultant Limited in Hong Kong

  4. Supervision at Koyo Dockyard at Mihara Japan 1974

  5. Outfitting Crude Oil Tanker Hull No:1084 at Oppama Shipyard, Japan

  6. Launching Ceremony

  7. Launching of MT SULTAN KUDARAT own by PNOC in 1974

  8. Keel Laid Ceremony in Japan in 1977 Monk saying prayer

  9. Launching of Cargoship MV SUN CASTOR of P.S. Lee at Imabari Shipyard 1976

  10. ABS 80,000 L.T. Crude Oil Tanker built at Sumitomo 1980

  11. Map of Japan

  12. MV ASANO 16,355 DWT Self-unloading bulk cement carrier

  13. Chain Conveyors for loading and Suction Pipes for unloading bulk cement

  14. Sloped cement tank with aeration slides

  15. Aeration pads being aerated

  16. Loading cement at Nihon Cement, Oita Works, Kiushu, Japan (1000t/hr)

  17. Unloading cement to a shuttle tanker

  18. First oversea project after joining Dome Petroleum The Conversion of SSDC (single steel drilling caisson)

  19. Preparation to cut bilge

  20. Afloat after P&S bilge been cut off

  21. Cut top part of the bow off

  22. Erecting a second layer about 1.2 m from the side shell and then fill with light weight concrete in between for reinforcement

  23. . The

  24. SSDC fully outfitted in McKinley Bay

  25. SSDC supported by ice at 2 drilling locations 1982-1983, 1983-1984

  26. Winter 1982 at Cammel Laird, Birkenhead U.K.

  27. Semi-submersible built for Dome Petroleum at Cammel Laird in 1982

  28. Supervised the conversion into FSO Hudbay Riau at Robin Shipyard in Singapore

  29. SSDC with MAT

  30. As a Naval Architect there is hardly any chance to witness how the steel plates used on the project being rolled out from red hot ingot in a steel mill. It is also very rare to witness construction of a new drydock specifically for the project. Fortunately I’d seen both in the MAT project during 85 to 86 in Japan

  31. Construction of Drydock for MAT

  32. The Longest Drydock Gate in the World

  33. Two blocks joining together in the newly completed drydock

  34. Float Out and installing hard foam blocks can see the moon pool

  35. Installing the Generator Container made by Caterpillar in Sagami

  36. Sea Trial in Osaka Bay

  37. Just before fully submerged

  38. A Great Moment! May 1986

  39. Naming Ceremony at Hitachi Zosen’s Osaka Works, Sakai, Osaka Prefecture

  40. Reception for Naming Ceremony

  41. CANMAR Fleet in acti on for Mating

  42. SSDC being towed towards the submerged MAT

  43. Presentation of “ Corrosion Protection for Ballast Tanks in Arctic Offshore Structures”

  44. ASMAR in Tachauano, Chile

  45. Diving Vessel Canada’s Tomorrow

  46. Inside diving compartment

  47. SNAME Meting

  48. SNAME Meeting

  49. MAT Construction 1986 John Fitzgerald et al

  50. Dartmouth, Nova Scotia Alone for 60 th birthday

  51. Survival Training

  52. Chairman of Chinese Society of Nova Scotia

  53. At Governor General’s Residence in Halifax

  54. SNAME Meeting in Halifax Frank Smith on Left, Dusty Miller on Right 1993-May-31

  55. SNAME Meeting in Halifax Professor Hsiung, Dalhousie University May 31, 1993

  56. Onboard Nordic Apollo

  57. FSO Nordic Apollo for LASMO’s Cohasset Panuke Field, offshore NS Project

  58. Seen from the stern

  59. Off Loading Hose

  60. Crane Addition Nordic Apollo

  61. MCDV

  62. Last of 12 MCDVs

  63. Aluminum Catamaran at AFT

  64. PV Murray

  65. The Project Team of Murray

  66. Construction Acceptance at A.F. Theriaul Shipyard Meteghan River, Nova Scotia

  67. C & A Science Vessel

  68. CCGS Viola M. Davidson, Apr. 3 2010

  69. Sea Trial CCGS VIOLA M. DAVIDSON Scallop Drag

  70. Lunenberg, NS End of Half Century Career 2013

  71. Thank You for Viewing

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend