The Bridge & Cutting N RECAP: O I T A R E Two workshops 27 Oct & 7 Nov D I S Team of experts and facilitator N O BR options review, development and feedback C G RMS to further develop and test


  1. The Bridge & Cutting N RECAP: O I T A R E • Two workshops – 27 Oct & 7 Nov D I S • Team of experts and facilitator N O • BR options review, development and feedback C G • RMS to further develop and test feasibility of a set of objectives R C • Independent report of process and outcomes to be published 2 Dec R O F

  2. The Bridge & Cutting N O What we considered: I T A R • 1600m length of road and bridge examined (CH14800 to CH16400) E D • BR 3 as benchmark to develop road geometry I S N • Adopt shallowest climbing grade possible from the west (approx 3%) O C • Horizontal main line alignment adjustments to north and/or south to avoid G or minimise property impacts R C • Avoid or minimise use of additional concrete structures (bridges or walls) R O • Optimise vertical grades to on and off ramps F • Optimise ramps to utilise existing topography

  3. The Bridge & Cutting N O What we considered: I T A R • Eliminate obtrusive noise barriers E D • Maintain natural barriers where possible to minimise noise I S N • Reduce number of bridge expansion joints (avoid Minamurra bridge O scenario) C G • Bridge piers to stand on hidden (buried) piled foundations R C • Target the vertical profile of the bridge to be as near to 4.6m vehicle R O clearance above Woodhill Mountain Road as possible F • Adjusting the vertical and/or horizontal alignment of Woodhill Mountain Road • Explore both twin (side by side) and single bridge options • Explore bridge type concepts using different types of span beams

  4. The Bridge & Cutting N O What we considered: I T A R • Using the existing Princes Highway as the southbound off ramp E D • Moving the northbound on ramp as far north as possible I S N • Adjusting the mainline further north at the sculptures to avoid the existing O south facing cutting C G • Making the cutting slopes as steep as possible R C • Minimising very low gradients to avoid aquaplaning on the bridge R O • Safe drainage and disposal of surface water runnoff F • Safe sight line distances for drivers

  5. The Bridge & Cutting N Current Status: HORIZONTAL ALIGNMENT BR4 O I T • Vertical alignment re- A R graded to 3% E D •East abutment to I S western limit N •Excess cut over fill O C 12,000m3 G • Mohawk area between R SB off ramp and mainline C • Fill batters or retaining R O structures or combination F of both at some locations

  6. The Bridge & Cutting N Current Status: VERTICAL ALIGNMENT O I T A R E D I S N O C G R C R O F

  7. Berry Bridge Status: Moved north up to 95m; lowered up to 6.4m N O I T A R E D I S N O C G R C R O F

  8. N O I T A Berry Bridge Section – Plank Construction R E D I S N O C G R C R O F

  9. Berry Bridge Section – Plank Construction N O I T A R E D I S N O C G R C R O F

  10. N O I T A R E D Berry Bridge Section – Super Tee I S N O C G R C Construction R O F

  11. Berry Bridge Section – Super Tee Construction N O I T A R E D I S N O C G R C R O F

  12. RMS acquired properties N O I T A R E D I S N O C G R C R O F

  13. N O I T A R E D I S N O C G R The way forward C R O F

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.