MP-ECBC CELL
presentation by
- Mr. Rajeev Ralhan
Director, PwC India
Let’s build ‘Tomorrow’
MP-ECBC CELL Lets build Tomorrow presentation by Mr. Rajeev - - PowerPoint PPT Presentation
MP-ECBC CELL Lets build Tomorrow presentation by Mr. Rajeev Ralhan Director, PwC India MP-ECBC CELL HISTORY ENERGY CONSERVATION BUILDING CODE (ECBC) MP-ECBC CELL HISTORY OF INDIA 233 450 1993 2000 values are of PRIMARY
presentation by
Director, PwC India
Let’s build ‘Tomorrow’
source: world energy outlook reports
source: world energy outlook reports
source: world energy outlook reports
source: world energy outlook reports
MPUVN State Designated Agency Provide legal framework and institutional arrangement to embark energy efficiency drive Exert leadership and develop policies and provide direction to National Energy Conservation and Efficiency efforts and programs Section 15 of the Act empowers State Designated Agency to coordinate, regulate and enforce efficient use
for the first time by BEE
was established
Document was prepared
Workshops, Conferences were
established
(Arch. & Engg.)
Progress From
was performed
were made as per
were made as per
were organised
with existing approval system
for drafting MP- ECBC documents MP-ECBC docs prepared in both
with PWD & MPUVN (under process)
NOTIFICATION
(under process)
We should follow ECBC 2017
MP-ECBC 2017 ?
https://www.google.co.in/imgres?imgurl=https%3A%2F%2Fimage.slidesharecdn.com%2F01introduction-140504232059-phpapp02%2F95%2Fecbc01introduction-27- 638.jpg%3Fcb%3D1399245941&imgrefurl=https%3A%2F%2Fwww.slideshare.net%2Fmathangi_advit%2F01-introduction- 34276080&docid=ZRdAxMowv5FRcM&tbnid=xGePbqsqjL9tnM%3A&vet=10ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg..i&w=638&h=480&safe=active&bih=631&biw=1366&q=ECBC%20CLimatic%20zones &ved=0ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg&iact=mrc&uact=8
INDIA STATES & UT’s DIVISIONS 29 STATES and 7 UT’s HOT-DRY WARM-HUMID COMPOSITE TEMPERATE COLD
Bhopal Ujjain Indore Chambal Shahdol Rewa Sagar Jabalpur Narmadapuram Gwalior Chambal division Gwalior division Bhopal division Ujjain division Indore division Narmadapuram division Jabalpur division Shahdol division Rewa division Sagar division
http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
STATE OF MADHYA PRADESH ADMINISTRATIVE DIVISION 51 DISTRICTS
Bhopal
Indore Barwani West Nimar East Nimar Burhanpur Betul Chhindwara Seoni Balaghat
Dewas Sehore Raisen Shajapur Ujjain Neemuch
Harda Mandla Dindori Annupur Umaria Sidhi Rewa Satna Shahdol Jabalpur Narsimhapur Katni Damoh Panna Chhatarpur Tikamgarh Sagar Vidisha Rajgarh Ashoknagar
Guna
Shivpuri Gwalior Bhind Morena Sheopur Datia Dhar Jhabua
Ratlam Mandsaur
Composite climatic regions
http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG
Hoshangabad
OR
(Addition / Alteration)
OR
(Addition / Alteration)
BUILDING ELEMENTS COMFORT SYSTEMS & CONTROLS ELECTRICAL & RENEWABLE ENERGY SYSTEMS LIGHTING & CONTROLS BUILDING ENVELOPE
= Built-up Area (in sq. m.) Annual Energy Consumption
100
REGULATION
RESPONSIBILITIES CODE MONITORING & VERIFICATION CHECKLISTS TRANSPERANCY
circulate UBID
DESIGNING POST-CONSTRUCTION CONSTRUCTION
Owner Owner
SDA SDA DISCOM COM
AHJ AHJ EEA EEA (Building) (Building) Check for minimum criteria Will assist in compliance with MP-ECBC 2018 and submit relevant FORMS Generate UBID
submittals
Owner Owner
AHJ AHJ
EEA EEA (Building) (Building) To construct building as per submittals will verify construction process and submit relevant compliance FORMS Grant new- permanent Electrical Connection
SDA SDA DISCOM COM
DESIGNING POST-CONSTRUCTION CONSTRUCTION
Owner ner EEA EEA (Building uilding)
Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID
SDA SDA DISCOM COM
MP-ECBC Implementation Committee
will resolve appeal raised by Owner
DESIGNING POST-CONSTRUCTION CONSTRUCTION
Owner ner EEA EEA (Building uilding)
Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID
SDA SDA DISCOM COM
NEC or SEC will resolve appeal raised by Owner For multiple-use of single buildings, UBID need to be followed by syntax from Owner: UBID_T(n) When building is occupied or used by various tenant(s) and having provision of sub-metering for energy consumption is provided by Owner DISCOM: UBID_M(n) When building is having multiple owner(s) and sub-metering for energy consumption is provided by DISCOM Under such cases, especially when sub-meter is under Owner scope, will be liable to provide necessary annual energy consumption whenever asked by SDA
DESIGNING POST-CONSTRUCTION CONSTRUCTION
Hospital Hospital Offices Offices Retails
BUILDING (with UBID as ‘xxxx/ECBC’ ) having MULTIPLE OWNERS DISCOM shall need to be add UBID with syntax as ‘xxxx/ECBC-Mn’
Where, Mn = M1, M2, M3, M4 … Mn (n=no.
Relevant energy details need to be shared with SDA
If Owner sales spaces of building to different consumers after construction then,
Hospital Hospital Offices Offices Retails
BUILDING (with UBID as ‘xxxx/ECBC’ ) having MULTIPLE OWNERS OWNER shall be liable to monitor energy consumption via sub-metering While DISCOM need to share energy details for whole building as per UBID shared by AHJ with SDA If Owner make a lease agreement (rent) for the spaces of building with different tenants then,
Annual Energy Consumption (in kWh)
10,000 20,000 20,000 10,000 40,000
Built-up Area (in sq.m.)
100 200 300 50 350
EPI (P) (Annual kWh/ sq.m.)
100 100 67 200 114
/ = EPI Ratio (EPI (P)/ EPI (S))
1.00 1.00 0.67 2.00 1.14
EPI (S)
(Assume to be
100kWh) (1) (2) (3) (4) (5)
/ = / = / = / = / =
Circulate UBID
Owner Owner
SDA SDA DISCOM COM
AHJ AHJ EEA EEA (Building) (Building) Check for minimum criteria Will assist in compliance with MP-ECBC 2018 and submit relevant documents Generate UBID
submittals
Owner ner EEA EEA (Building uilding)
Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID Owner Owner
SDA SDA AHJ AHJ
EEA EEA (Building) (Building) To construct building as per submittals will verify construction process and submit relevant compliance FORMS Grant new- permanent Electrical Connection
SDA SDA DISCOM COM DISCOM COM
NEC or SEC will resolve appeal raised by Owner
DESIGNING POST-CONSTRUCTION CONSTRUCTION