MP-ECBC CELL Lets build Tomorrow presentation by Mr. Rajeev Ralhan Director, PwC India MP-ECBC CELL HISTORY ENERGY CONSERVATION BUILDING CODE (ECBC) MP-ECBC CELL HISTORY OF INDIA 233 450 1993 2000 values are of PRIMARY


slide-1
SLIDE 1

MP-ECBC CELL

presentation by

  • Mr. Rajeev Ralhan

Director, PwC India

Let’s build ‘Tomorrow’

slide-2
SLIDE 2

HISTORY

MP-ECBC CELL

ENERGY CONSERVATION BUILDING CODE (ECBC)

slide-3
SLIDE 3

MP-ECBC CELL

source: world energy outlook reports

HISTORY OF INDIA

233 1993 450 2000

values are of PRIMARY ENERGY DEMAND (in MTOE)

slide-4
SLIDE 4

MP-ECBC CELL

source: world energy outlook reports

HISTORY OF INDIA

233 1993 450 2000 716 2020 1250 - 1500 2030

values are of PRIMARY ENERGY DEMAND (in MTOE)

slide-5
SLIDE 5

MP-ECBC CELL

source: world energy outlook reports

233 1993 450 2000

770 MTOE 2012

716 2020

1250 - 1500 2030

HISTORY OF INDIA

(values are of PRIMARY ENERGY DEMAND in MTOE)

slide-6
SLIDE 6

MP-ECBC CELL

source: world energy outlook reports

233 1993 450 2000 In 2001

Nations’

Energy Conservation Act

slide-7
SLIDE 7

Energy Conservation Act, 2001

MP-ECBC CELL

DESIGNATED CONSUMERS ENERGY CONSERVATION FUND STAR AND LABELLING OF APPLIANCES ENERGY CONSERVATION BUILDING CODE INSTITUTIONAL SETUP

5

slide-8
SLIDE 8

Energy Conservation Act, 2001

MP-ECBC CELL

DESIGNATED CONSUMERS ENERGY CONSERVATION FUND STAR AND LABELLING OF APPLIANCES ENERGY CONSERVATION BUILDING CODE INSTITUTIONAL SETUP

5

slide-9
SLIDE 9

Energy Conservation Act, 2001

MP-ECBC CELL

DESIGNATED CONSUMERS ENERGY CONSERVATION FUND STAR AND LABELLING OF APPLIANCES ENERGY CONSERVATION BUILDING CODE INSTITUTIONAL SETUP

5

slide-10
SLIDE 10

Energy Conservation Act, 2001

MP-ECBC CELL

MPUVN State Designated Agency Provide legal framework and institutional arrangement to embark energy efficiency drive Exert leadership and develop policies and provide direction to National Energy Conservation and Efficiency efforts and programs Section 15 of the Act empowers State Designated Agency to coordinate, regulate and enforce efficient use

  • f energy and its conservation
slide-11
SLIDE 11

JOURNEY OF MP-ECBC

MP-ECBC CELL

slide-12
SLIDE 12

JOURNEY OF ECBC IN MADHYA PRADESH

MP-ECBC CELL

2007 2007

Introduced ECBC

for the first time by BEE

2007 2009

State Level Steering Committee

was established

2007 2010

  • 2014

ECBC 2007 Amendment

Document was prepared

2007 2014

  • 2016

Sensitization

Workshops, Conferences were

  • rganized

2007 2016

established

ECBC CELL

(Arch. & Engg.)

2007

Progress from

2016

Lets Discuss!

slide-13
SLIDE 13

MP-ECBC CELL

Progress From

2016

Situation Analysis

was performed

Amendments

were made as per

ECBC -2017 Amendments

were made as per

ECBC Rules- 2018 Steering Committee Meetings

were organised

Integrated Enforcement Mechanism

with existing approval system

Stakeholder Consultation

for drafting MP- ECBC documents MP-ECBC docs prepared in both

English and Hindi Demo- Projects

with PWD & MPUVN (under process)

NOTIFICATION

(under process)

JOURNEY OF ECBC IN MADHYA PRADESH

slide-14
SLIDE 14

MP-ECBC COMPLIANCE MECHANISM

MP-ECBC CELL

Difference between ECBC and MP-ECBC?

slide-15
SLIDE 15

MP-ECBC CELL

We should follow ECBC 2017

  • r

MP-ECBC 2017 ?

slide-16
SLIDE 16

MP-ECBC CELL

https://www.google.co.in/imgres?imgurl=https%3A%2F%2Fimage.slidesharecdn.com%2F01introduction-140504232059-phpapp02%2F95%2Fecbc01introduction-27- 638.jpg%3Fcb%3D1399245941&imgrefurl=https%3A%2F%2Fwww.slideshare.net%2Fmathangi_advit%2F01-introduction- 34276080&docid=ZRdAxMowv5FRcM&tbnid=xGePbqsqjL9tnM%3A&vet=10ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg..i&w=638&h=480&safe=active&bih=631&biw=1366&q=ECBC%20CLimatic%20zones &ved=0ahUKEwjE5a6bkqbdAhUZA4gKHfelAd4QMwhAKAIwAg&iact=mrc&uact=8

INDIA STATES & UT’s DIVISIONS 29 STATES and 7 UT’s HOT-DRY WARM-HUMID COMPOSITE TEMPERATE COLD

slide-17
SLIDE 17

MP-ECBC CELL

Bhopal Ujjain Indore Chambal Shahdol Rewa Sagar Jabalpur Narmadapuram Gwalior Chambal division Gwalior division Bhopal division Ujjain division Indore division Narmadapuram division Jabalpur division Shahdol division Rewa division Sagar division

http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG

STATE OF MADHYA PRADESH ADMINISTRATIVE DIVISION 51 DISTRICTS

slide-18
SLIDE 18

MP-ECBC CELL

Climatic Division of Madhya Pradesh

Bhopal

Indore Barwani West Nimar East Nimar Burhanpur Betul Chhindwara Seoni Balaghat

Dewas Sehore Raisen Shajapur Ujjain Neemuch

Harda Mandla Dindori Annupur Umaria Sidhi Rewa Satna Shahdol Jabalpur Narsimhapur Katni Damoh Panna Chhatarpur Tikamgarh Sagar Vidisha Rajgarh Ashoknagar

Guna

Shivpuri Gwalior Bhind Morena Sheopur Datia Dhar Jhabua

Ratlam Mandsaur

Hot-Dry Climatic regions

Composite climatic regions

http://stcr.gov.in/farmer/HTML/Fertility_Maps_Macro/Maps/MadhyaPradesh/Madhya%20Pradesh%20P.JPG

Hoshangabad

slide-19
SLIDE 19

MP-ECBC COMPLIANCE MECHANISM

MP-ECBC CELL

MP-ECBC IN BRIEF

slide-20
SLIDE 20

New Construction

OR

Existing Buildings

(Addition / Alteration)

MP-ECBC CELL New Construction having Connected Load

  • f 100kW or above

Existing Buildings need to renew its connected load because

  • f addition/alteration

due to which its connected load will be 100kW or above

slide-21
SLIDE 21

New Construction

OR

Existing Buildings

(Addition / Alteration)

MP-ECBC CELL

BUILDING ELEMENTS COMFORT SYSTEMS & CONTROLS ELECTRICAL & RENEWABLE ENERGY SYSTEMS LIGHTING & CONTROLS BUILDING ENVELOPE

slide-22
SLIDE 22

Exemptions

  • Buildings that do not use electricity or fossil fuels
  • Equipment and portion of the building systems that use

energy primarily for manufacturing processes

  • When this Code is in conflict to Safety, Health and

Environment codes shall prevail

MP-ECBC CELL

slide-23
SLIDE 23

MP-ECBC CELL COMPLIANCE MECHANISM

COMPLIANCE SUBMITTALS

Energy Efficiency Performance Level

COMPLIANCE PROCESS

 Mandatory  Prescriptive

slide-24
SLIDE 24

MP-ECBC CELL

EPI RATIO

= EPI of Standard Building EPI of Proposed Building

ENERGY PERFORMANCE INDEX (EPI)

= Built-up Area (in sq. m.) Annual Energy Consumption

COMPLIANCE SUBMITTALS

slide-25
SLIDE 25

MP-ECBC CELL EPI RATIO ENERGY PERFORMANCE INDEX (EPI)

Prescriptive Method Whole Building Performance Method COMPLIANCE PROCEDURE

slide-26
SLIDE 26

MP-ECBC ENFORCEMENT MECHANISM

MP-ECBC CELL

WHATS ARE RULES? ECBC OR MP-ECBC

slide-27
SLIDE 27

MP-ECBC CELL

100

REGULATION

?

RESPONSIBILITIES CODE MONITORING & VERIFICATION CHECKLISTS TRANSPERANCY

slide-28
SLIDE 28

MP-ECBC ENFORCEMENT MECHANISM

MP-ECBC CELL

DEPARTMENTS HAVING THEIR ROLE AND RESPONSIBILITIES

slide-29
SLIDE 29

ADMINISTRATIVE ROLES

MP-ECBC CELL

VIDYUT VITRAN CO. /DISCOM

MP-ECBC

Implementation

Committee Madhya Pradesh Urja Vikas Nigam Authority Having Jurisdiction MP-ECBC Technical

Grievances Redressal

Committee

slide-30
SLIDE 30

PROCEDURE OF ENFORCEMENT

MP-ECBC CELL

slide-31
SLIDE 31

circulate UBID

MP-ECBC CELL

DESIGNING POST-CONSTRUCTION CONSTRUCTION

Owner Owner

SDA SDA DISCOM COM

AHJ AHJ EEA EEA (Building) (Building) Check for minimum criteria Will assist in compliance with MP-ECBC 2018 and submit relevant FORMS Generate UBID

  • n approval of

submittals

slide-32
SLIDE 32

MP-ECBC CELL

Owner Owner

AHJ AHJ

EEA EEA (Building) (Building) To construct building as per submittals will verify construction process and submit relevant compliance FORMS Grant new- permanent Electrical Connection

SDA SDA DISCOM COM

DESIGNING POST-CONSTRUCTION CONSTRUCTION

slide-33
SLIDE 33

MP-ECBC CELL

Owner ner EEA EEA (Building uilding)

Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID

SDA SDA DISCOM COM

MP-ECBC Implementation Committee

will resolve appeal raised by Owner

DESIGNING POST-CONSTRUCTION CONSTRUCTION

slide-34
SLIDE 34

MP-ECBC CELL

Owner ner EEA EEA (Building uilding)

Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID

SDA SDA DISCOM COM

NEC or SEC will resolve appeal raised by Owner For multiple-use of single buildings, UBID need to be followed by syntax from Owner: UBID_T(n) When building is occupied or used by various tenant(s) and having provision of sub-metering for energy consumption is provided by Owner DISCOM: UBID_M(n) When building is having multiple owner(s) and sub-metering for energy consumption is provided by DISCOM Under such cases, especially when sub-meter is under Owner scope, will be liable to provide necessary annual energy consumption whenever asked by SDA

DESIGNING POST-CONSTRUCTION CONSTRUCTION

slide-35
SLIDE 35

MP-ECBC CELL

Mixed-use Buildings (Sold by Owner)

Hospital Hospital Offices Offices Retails

BUILDING (with UBID as ‘xxxx/ECBC’ ) having MULTIPLE OWNERS DISCOM shall need to be add UBID with syntax as ‘xxxx/ECBC-Mn’

Where, Mn = M1, M2, M3, M4 … Mn (n=no.

  • f multiple of owners)

Relevant energy details need to be shared with SDA

If Owner sales spaces of building to different consumers after construction then,

slide-36
SLIDE 36

MP-ECBC CELL

Mixed-use Buildings (Leased by Owner)

Hospital Hospital Offices Offices Retails

BUILDING (with UBID as ‘xxxx/ECBC’ ) having MULTIPLE OWNERS OWNER shall be liable to monitor energy consumption via sub-metering While DISCOM need to share energy details for whole building as per UBID shared by AHJ with SDA If Owner make a lease agreement (rent) for the spaces of building with different tenants then,

slide-37
SLIDE 37

MP-ECBC CELL

EPI Calculation

Annual Energy Consumption (in kWh)

1,00,000

10,000 20,000 20,000 10,000 40,000

Built-up Area (in sq.m.)

1000

100 200 300 50 350

EPI (P) (Annual kWh/ sq.m.)

100

100 100 67 200 114

/ = EPI Ratio (EPI (P)/ EPI (S))

1.00

1.00 1.00 0.67 2.00 1.14

EPI (S)

(Assume to be

100kWh) (1) (2) (3) (4) (5)

/ = / = / = / = / =

slide-38
SLIDE 38

Circulate UBID

MP-ECBC CELL

Owner Owner

SDA SDA DISCOM COM

AHJ AHJ EEA EEA (Building) (Building) Check for minimum criteria Will assist in compliance with MP-ECBC 2018 and submit relevant documents Generate UBID

  • n approval of

submittals

Owner ner EEA EEA (Building uilding)

Will take necessary action if not in compliance will provide annual energy consumption details of the UBID’s and share with SDA Will monitor EPI of UBID Owner Owner

SDA SDA AHJ AHJ

EEA EEA (Building) (Building) To construct building as per submittals will verify construction process and submit relevant compliance FORMS Grant new- permanent Electrical Connection

SDA SDA DISCOM COM DISCOM COM

NEC or SEC will resolve appeal raised by Owner

DESIGNING POST-CONSTRUCTION CONSTRUCTION

slide-39
SLIDE 39

MP-ECBC COMPLIANCE

MP-ECBC CELL

Importance of MP-ECBC Compliance?

slide-40
SLIDE 40

MP-ECBC CELL

Importance of MP-ECBC Compliance

 Building performance enhancement through out its life  Reduction in energy demand and peak loads  Providing health and comfort for occupants  Reduction in energy bills and embodied energy  Ease for Government to built-up future policies  Improving building life

slide-41
SLIDE 41

THANK YOU