ML&P Government Hill utility work 2013-16 Marty Smith, P.E. - PowerPoint PPT Presentation

ML&P Government Hill utility work 2013-16 Marty Smith, P.E. Senior Engineer Order of work Voltage upgrades: 4 kV to 12.47 kV Area west of East Loop Road 10/2013 to 4/2014 Substation 13 relocation 5/2014 to 10/2014


  1. ML&P Government Hill utility work 2013-16 Marty Smith, P.E. Senior Engineer

  2. Order of work • Voltage upgrades: 4 kV to 12.47 kV – Area west of East Loop Road – 10/2013 to 4/2014 • Substation 13 relocation – 5/2014 to 10/2014 • Port of Anchorage feeder – Summer of 2014 or 2015 • Title 21 undergrounding – Area west of Anderson Street – Design 2015, construction 2016 2

  3. Voltage upgrade: 4kV to 12.47kV 3 Beginning 4 th quarter 2013

  4. Substation 13 demolition 4

  5. Old Sub 13 vs. new unit sub 5 Old Substation 13

  6. New unit substation All underground connections 6

  7. New substation profile Artist’s rendition using Google Earth at 226 E Bluff Drive 7

  8. Port of Anchorage feeder • Purpose – to provide the port with a loop-fed distribution system • Critical asset to the municipality • Increases reliability to port 8

  9. POA feeder route 9

  10. Title 21 underground project 10 Overhead line to be underground Overhead line to remain Underground line Project location on vicinity map Power pole

  11. Title 21 project review criteria 11

  12. ML&P Title 21 project contacts • Jake Moe, P.E. – 263-5407 • Marty Smith, P.E. – 263-5236 • www.mlandp.com/underground 12

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.