MicroBooNE status Pawel Guzowski The University of Manchester DAQ - - PowerPoint PPT Presentation
MicroBooNE status Pawel Guzowski The University of Manchester DAQ - - PowerPoint PPT Presentation
MicroBooNE status Pawel Guzowski The University of Manchester DAQ uptime POT-weighted DAQ uptime Delivered POT 1 2 Uptime fraction 18 Delivered POT x10 1.8 0.95 1.6 1.4 0.9 1.2 1 0.85 0.8 0.6 0.8 0.4 0.2 0.75 0 Sep 22 Sep
DAQ uptime
4 October 2018 Pawel Guzowski 2
POT delivered since 9/17: 1.745 e19 POT on tape: 1.603 e19 Fraction on tape: 91.8% We have been taking BNB data since September 17th
Sep 22 Sep 29 Date 0.75 0.8 0.85 0.9 0.95 1 Uptime fraction
POT-weighted DAQ uptime
Sep 22 Sep 29 Date 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2
18
Delivered POT x10
Delivered POT
Computing resource use
4 October 2018 Pawel Guzowski 3
Also over summer: As part of tape shortage mitigation, MicroBooNE deleted 500TB of obsolete data
Summer shutdown activities
- 15 new DAQ servers installed
– Replacing old ones out of warranty – Old ones are being loaned to SBND for development work
- 5 power outages
– 3 initially planned – 1 postponed at the last minute, after already ramping down in preparation – 1 unplanned outage due to Feeder 45 glitch
- Calibration runs
– Laser maintenance work followed by calibration runs over multiple weeks – Unbiased trigger runs at lower drift voltage and purity
- More off-beam cosmic data taken than in previous summers
– Thanks to our DAQ team for upgrading capability to take a high cosmic trigger rate, following request from physics analysis groups
- David Caratelli (FNAL) has retired as Run Coordinator; Mark Ross-
Lonergan (Columbia) joins team as Deputy Run Coordinator
4 October 2018 Pawel Guzowski 4
Recent reduction of argon purity
- On September 4th, bad argon delivery was made into external
top-up dewar, with ~100ppm O2 contamination
– Levels were recorded but not alarmed on – First time this has happened in >3 years operation
- 20 gallons entered our cryostat on September 24th
– Caught quickly by shifters and runco team – ND cryo team immediately responded and stopped flow into vessel
- Top-off is needed to maintain liquid level in vessel. We need
argon dewar drained and refilled before liquid level drops to a point where detector cannot operate. Working with procurement
– Yesterday external vendor came and performed this task
- MicroBooNE has been running 24/7 and staffing shifts
throughout
– Valuable calibration & systematic evaluation data at lower purity
- We continue to see tracks throughout this period
- We currently have ~3ms lifetime
– Estimate ~1 week to return to >15ms lifetime from before the purity degradation
4 October 2018 Pawel Guzowski 5
event display from Sep 27
drift direction
Fiducial width of detector
9/24
20%
10/3
Recent & upcoming publications
- Two publications submitted to journals over summer:
- “Comparison of νµ-Ar multiplicity distributions observed by
MicroBooNE to GENIE model predictions”
– Submitted to Europhysics Journal C; arXiv:1805.06887
- “A Deep Neural Network for Pixel-Level Electromagnetic Particle
Identification in the MicroBooNE Liquid Argon Time Projection Chamber”
– Submitted to Physical Review D; arXiv:1808.07269
- In collaboration-wide review:
– “First Measurement of Muon Neutrino Charged Current Neutral Pion Production on Argon with the MicroBooNE LArTPC” – “Rejecting cosmic background for exclusive neutrino interactions studies with LArTPC” – “Design and Construction of the MicroBooNE Cosmic Ray Tagger System”
- We also released 10 public notes over summer
4 October 2018 Pawel Guzowski 6