Meeting Agenda

  • 5:00 p.m.

Plan Review & Discussion

One-on-one session with Project Team

  • 6:00 p.m. Presentation with Questions/Answers

Presented by: Ms. Jan S. Vaughan VDOT

  • Mr. Robert Morris, PE FHWA
  • 7:00 p.m.

Plan Review & Discussion

Continue one-on-one session with Project Team

  • 8:00 p.m.

Public Hearing Adjourns

slide-2
SLIDE 2

Mulligan Road & Telegraph Road Public Hearing

Mulligan Road – (Phase 2)

0235-029-102, P101, R201, C501; Federal Project: 5401(735)

From: Mount Vernon Memorial Highway/Route 1 To: Pole Road Telegraph Road

0611-029-303, P102, R202, C502; Federal Project: STP-5401

From: Beulah Street To: Leaf Road

slide-3
SLIDE 3

3

Welcome!

  • Ms. Jan S. Vaughan

Assistant Manager Arlington/Fairfax Preliminary Engineering VDOT Northern Virginia District

slide-4
SLIDE 4

4

Tonight’s Objective

  • Review & Discuss Design Plans
  • Answer Your Questions
  • Get Your Ideas/Comments
slide-5
SLIDE 5

5

Project Team

  • Federal Highway Administration

Federal Highway Administration

  • Fairfax County

Fairfax County

  • Virginia Department of Transportation

Virginia Department of Transportation

  • VDOT

VDOT’ ’s s and FHWA and FHWA’ ’s Design Consultants s Design Consultants

  • Public

Public

slide-6
SLIDE 6

6

Project Location Map

Mulligan Road

(Phase 1)

Mulligan Road

(Phase 2)

Telegraph Rd

NOTE: Dotted line is for project reference only and not part of this public hearing

slide-7
SLIDE 7

7

Project History

Woodlawn Road was closed through Fort Belvoir after September 11, 2001. The Fairfax County BOS renamed Old Mill Road from Rte 1 to Pole Road “Mulligan Road” The U. S. Army agreed to replace Woodlawn Road with Mulligan Road from Route 1, extending through the Fort, to Telegraph Road FHWA prepared an Environmental Assessment (EA) for both Mulligan Road and Telegraph Road, resulting in a Finding of No Significant Impact (FONSI) FHWA is managing the design and construction of Mulligan Road. Construction began on Phase 1 of Mulligan Road through Fort Belvoir in January 2009. Completion is scheduled for Summer 2010.

slide-8
SLIDE 8

8

Project History

Once Mulligan Road is opened, through traffic congestion

  • n Telegraph Road is expected to increase substantially

unless Telegraph Road is also improved. In a cooperative alliance, FHWA will also manage the design and construction of this segment of Telegraph

  • Road. VDOT will acquire all right of way.

Fairfax County will provide additional funds to finance the project until VDOT can reimburse the cost. A CIM was held in October 2008 for both this segment of Telegraph Road as well as the segment north to S. Kings Highway

slide-9
SLIDE 9

9

  • Mr. Robert Morris, P.E.

Project Manager Federal Highway Administration Eastern Federal Lands Highway Division

slide-10
SLIDE 10

10

Design Elements

Mulligan Road (formerly Old Mill Road)

  • Realign the existing offset intersection of Mount Vernon

Memorial Highway and Mulligan Road at the Richmond Highway (Route 1) intersection

  • Widen Mulligan Road from Richmond Highway (Route 1) to

Pole Road and connect to the Mulligan Road-Phase 1 segment.

  • Add a second left turn lane on NB Richmond Highway

(Route 1) to Mulligan Road

  • Install a raised median on both NB and SB Richmond

Highway (Route 1) in the area of the Mulligan Road intersection

slide-11
SLIDE 11

11

Mulligan Road Typical Section

  • Raised, curbed medians
  • Five (5) foot sidewalks on both

sides of roadway

  • Wide outside curb lane to

accommodate bicyclists

  • Landscaping
slide-12
SLIDE 12

12

Existing Intersection

Artist rendering of Richmond Highway, Mulligan Road, Mt. Vernon Memorial Highway and Woodlawn Plantation entrance.

Woodlawn Plantation 7-11

  • Mt. Vernon

Memorial Hwy

Route 1

Mulligan Road Roy Rogers Woodlawn Stables

slide-13
SLIDE 13

13

Proposed Improvements

Artistic rendering of the proposed improvements at Richmond Highway, Mt. Vernon Memorial Highway & Mulligan Road

Woodlawn Plantation Mulligan Road

  • Mt. Vernon

Memorial Hwy 7-11 Roy Rogers

Route 1

Woodlawn Stables

slide-14
SLIDE 14

14

Woodlawn Plantation- Fort Belvoir Land Swap

  • As part of the Memorandum of

Agreement (MOA), a land swap was approved by Federal, State, property owners, and other stakeholders.

  • Congress made 2.5 acres of Fort

Belvoir property available (shown here in orange) in exchange for 2.5 acres of ROW along the existing Old Mill Road needed to widen the roadway.

  • This land swap is part of several

strategies to mitigate impacts to Woodlawn Plantation.

slide-15
SLIDE 15

15

Design Elements

Telegraph Road

  • Continue the widening of Telegraph Road (Route 611) from

a two (2) lane to a four (4) lane divided roadway from Beulah Street to Old Telegraph Road

  • Transition from four (4) lanes down to two (2) lanes from

Old Telegraph Road to the northern-most Leaf Road intersection.

  • Ongoing project coordination between the Telegraph Road

project and the new Wegman’s development.

  • Sound walls are being considered for the Alden Hills

community

slide-16
SLIDE 16

16

Telegraph Road Typical Section

  • Raised, curbed grass medians
  • Landscaping
  • Shared-use asphalt path on the

west side

  • Designated on-road bicycle lanes
  • Storm water management facilities
  • Bridge over Piney Run
slide-17
SLIDE 17

17

Estimated Project Costs

  • Design

$2.5 M

  • Land Acquisition/Utilities

$5.4 M

  • Construction

$33.0 M TOTAL COST $40.9 M

slide-18
SLIDE 18

18

Project Schedule

  • Public Hearing

Public Hearing May 26, 2009 May 26, 2009

  • Final Design

Final Design Spring Spring-

  • Fall 2009

Fall 2009

  • Land Acquisition

Land Acquisition Fall 2009 Fall 2009

  • Construction Begins

Construction Begins Summer 2010 Summer 2010

  • Open to Traffic

Open to Traffic Summer 2012 Summer 2012

slide-19
SLIDE 19

19

Mulligan Road & Telegraph Road Public Hearing We look forward to working with you as these projects move forward.

Thank You!!!

slide-20
SLIDE 20

To Submit Your Comments

Submit comments within 10 business days Submit comments within 10 business days (due COB (due COB June 9, 2009 June 9, 2009) )

  • Comment box

Comment box (located in the lobby)

(located in the lobby)

  • In Person

In Person: : A court reporter is here tonight to record your

A court reporter is here tonight to record your verbal comments verbal comments

  • U.S. Mail

U.S. Mail: :

  • Mr. Bud Siegel, P.E.
  • Mr. Bud Siegel, P.E.

VDOT Northern Virginia District Office VDOT Northern Virginia District Office 14685 Avion Parkway, Suite 200 14685 Avion Parkway, Suite 200 Chantilly, VA 20151 Chantilly, VA 20151-

  • 1104

1104

  • Email

Email to to: :

meeting_comments@VDOT.virginia.gov meeting_comments@VDOT.virginia.gov (Put (Put “ “Telegraph Road Widening Telegraph Road Widening” ” in the Subject Line) in the Subject Line)