Meeting 4 Commando Park, Cochrane Final Schematic Design October - - PowerPoint PPT Presentation

meeting 4
SMART_READER_LITE
LIVE PREVIEW

Meeting 4 Commando Park, Cochrane Final Schematic Design October - - PowerPoint PPT Presentation

Meeting 4 Commando Park, Cochrane Final Schematic Design October 23, 2013 Agenda 1. Review of Schematic Design 2. Sections 3. Order of Magnitude Budget 4. Discussion A Cultural Landscape of the Cree, Ojibway and Algonquin First Nations


slide-1
SLIDE 1

Meeting 4

Commando Park, Cochrane Final Schematic Design

October 23, 2013

slide-2
SLIDE 2

Agenda

  • 1. Review of Schematic Design
  • 2. Sections
  • 3. Order of Magnitude Budget
  • 4. Discussion
slide-3
SLIDE 3

A Cultural Landscape of the Cree, Ojibway and Algonquin First Nations

  • peoples. A gentle touch (our carbon footprint) is the impact on the
  • environment. Environmental stewardship is the trust.
slide-4
SLIDE 4
slide-5
SLIDE 5

Cultural Significance

slide-6
SLIDE 6

Colonial Land Subdivision and the Train

slide-7
SLIDE 7

Existing Urban Fabric

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12

Path surface material and Location

slide-13
SLIDE 13

Grid of Roads Terminate at the Lake

slide-14
SLIDE 14

Potential Places

slide-15
SLIDE 15

Other “views” to be Preserved

slide-16
SLIDE 16

Suggestions from the Landscape. Where the Town ends & the Lake begins

slide-17
SLIDE 17
  • Location. Number. Details.
slide-18
SLIDE 18

Fifth Street Park Entrance

slide-19
SLIDE 19

Fronts onto 5th Street. Opens onto Commando Lake.

slide-20
SLIDE 20

Schematic Design

slide-21
SLIDE 21
slide-22
SLIDE 22
slide-23
SLIDE 23
slide-24
SLIDE 24

Look Out

slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39
slide-40
SLIDE 40
slide-41
SLIDE 41
slide-42
SLIDE 42
slide-43
SLIDE 43
slide-44
SLIDE 44
slide-45
SLIDE 45
slide-46
SLIDE 46
slide-47
SLIDE 47
slide-48
SLIDE 48
slide-49
SLIDE 49
slide-50
SLIDE 50
slide-51
SLIDE 51
slide-52
SLIDE 52
slide-53
SLIDE 53
slide-54
SLIDE 54
slide-55
SLIDE 55
slide-56
SLIDE 56
slide-57
SLIDE 57
slide-58
SLIDE 58
slide-59
SLIDE 59

22-Oct-13

Page 1 of 3

Item No Description Element Low High 1 Pavilion - Total ROM cost to construct Pavillion at north end of park: 3,500 sf @ $225 psf Tent Structure Hard Landscaping $1,500,000 $2,000,000 2 Mirador @ Railway Station and 11th * Foundations *Retaining Walls * Floor * Site Accoutrements

  • Guards & Handrail
  • Pedestrian Lighting
  • Stairs -

Landscaping - Benches $100,000 $200,000 3 Mirador @ 4th and 7th * Foundations *Retaining Walls * Floor * Site Accoutrements

  • Guards & Handrail
  • Pedestrian Lighting
  • Stairs -

Landscaping - Benches $150,000 $250,000 4 Waters Edge Feature @ Beach * Foundations *Retaining Walls * Floor * Site Accoutrements

  • Guards & Handrail
  • Pedestrian Lighting
  • Stairs -

Landscaping - Benches * Dock $200,000 $300,000 5 Waters Edge Feature @ 4th Street * Foundations *Retaining Walls * Floor * Site Accoutrements

  • Guards & Handrail
  • Pedestrian Lighting
  • Stairs -

Landscaping - Benches * Dock $175,000 $275,000 22-Oct-13

Page 2 of 3 12/3/9081

Cochrane Commando Park

12/3/9081

Cochrane Commando Park

slide-60
SLIDE 60

6 Waters Edge Feature @ East * Foundations *Retaining Walls * Floor * Site Accoutrements

  • Guards & Handrail
  • Pedestrian Lighting
  • Stairs -

Landscaping - Benches * Dock $200,000 $300,000 7 Suspension Bridge - Cost to construct suspensions bridge located at south end of Lake by 'Yellow Bars' * Lake remediation * Foundations * Bridge $750,000 $1,000,000 8 Bandshell Revitalization - Cost includes all elements to update bandshell area * Seating * Lighting * Hard Landscaping * Landscaping $100,000 $200,000 9 Fountain on north west corner * Plumbing and Controls * Foundation *Hard Landscaping $150,000 $250,000 10 Boat Launch * Revitalize Existing Boat Launch * Concrete Ramp and Foundation 75000 $135,000.00 11 Splash Pad at existing beach house * Plumbing and Controls * Foundation *Hard Landscaping $150,000 $500,000 12 Revitalization of the Beach Building * Revitalize Existing Beach Building - match theme of Miradors and Pavilion $100,000 $150,000 13 Zip Lines * Landscaping * Removable Structure * Foundations $185,000 $250,000 14 Top soil and Sodding - Allowance * Restoration along entire length of pathway $160,000 $200,000 15 Planting and Landscaping * Provisions for basic landscaping and ground coverings * Create Landscape Elements indicated on plan $200,000 $300,000 22-Oct-13

Page 3 of 3

16 Gravel Walkways * 3m wide and 3km long crushed stone walkways around park perimeter and through penninsula. $120,000 $200,000 Cochrane Commando Park

12/3/9081

slide-61
SLIDE 61

17 Asphalt Walkways * Fee for asphalt walkways, in addition to requirements of item 16 for gravel walkways. Provides a hard multi use trail surface. $150,000 $225,000 18 Site Drainage * Steel Culverts installed along pathway to divert surface runoff towards lake and prevent ponding in landscaped areas * Drainage swales and ditching $50,000 $100,000 19 Electrical Panel's * located around site to control lighting circuits and

  • utlets for various events; the

bandshell, summer festival, winter festival, etc. $75,000 $100,000 20 Electrical Conduits in Duct Bank * Cost of electrical duct bank as well as conduit provided for lighting and underground to pole mounted hydro services. $750,000 $1,000,000 21 Electrical Light Fixtures * Pole mounted and post lighting along the pathway $350,000 $500,000 22 Sound System * Sound system around the park complete with speakers, PA system and amplification and Base station in new pavilion. $40,000 $60,000 $8,578,138.00 23 Contractor's General Conditions & Fees 15% 1,286,720.70 $ $9,864,858.70 24 Construction Contigency Allowance 7% $690,540.11 $10,555,398.81 25 HST 13% $1,372,201.85 CONSTRUCTION BUDGET $11,927,600.65 26 Permit and Fees @ 15% * $1,789,140.10

TOTAL CAPITAL PROJECT BUDGET $13,716,740.75

slide-62
SLIDE 62

What type of park do we consider Commando Park to be? Is it a passive park? Is it a recreational park? Is it an activity park, perhaps a novelty park?

slide-63
SLIDE 63

Can Commando Park be all the things that we want it to be while preserving its cultural significance/cultural landscape? Is it a transformative park transforming with the seasons? Is it transformative due to the multiple and varied existing places that are meaningful, quaint and in need of some help – sometimes?