MEASURE L BOND UPDATE May 21, 2019 Measure L Overview Project - - PDF document

MEASURE L BOND UPDATE May 21, 2019 Measure L Overview Project Updates Program Schedule Review Measure L Project Updates Cherrywood Elementary School - FIS Complete: Demolition Rough framing Plumbing


slide-1
SLIDE 1

MEASURE L BOND UPDATE

May 21, 2019

slide-2
SLIDE 2

Measure L – Overview

  • Project Updates
  • Program Schedule Review
slide-3
SLIDE 3

Measure L – Project Updates

Cherrywood Elementary School - FIS

  • Complete:
  • Demolition
  • Rough framing
  • Plumbing rough-in
  • Framing at roof platform
  • Elevator shaft steel framing
  • Elevator shaft framing
  • HVAC roof platform
  • In progress:
  • Elevator shaft sheetrock
  • Rough-in HVAC
  • Rough-in electrical
  • Flooring repair
slide-4
SLIDE 4

Measure L – Project Updates

Cherrywood FIS – Kitchen/Elevator Area - April

slide-5
SLIDE 5

Measure L – Project Updates

Cherrywood FIS – Kitchen/Elevator Area - May

slide-6
SLIDE 6

Measure L – Project Updates

Cherrywood FIS – FIS Space Looking West- April

slide-7
SLIDE 7

Measure L – Project Updates

Cherrywood FIS – FIS Space Looking West- April

slide-8
SLIDE 8

Measure L – Project Updates

Cherrywood FIS – Front FIS Space Looking East- April

slide-9
SLIDE 9

Measure L – Project Updates

Cherrywood FIS – Front FIS Space Looking East- April

slide-10
SLIDE 10

Measure L – Project Updates

Toyon Elementary School - FIS

  • Mural installation
  • Grass installation
  • Library shelving
  • AV equipment

Brooktree Elementary School - FIS

  • Printed ceiling tiles replacement
slide-11
SLIDE 11

Measure L – Project Updates

Toyon FIS – Looking East - May

slide-12
SLIDE 12

Measure L – Project Updates

Toyon FIS – Looking East - May

slide-13
SLIDE 13

Measure L – Project Updates

Toyon FIS – Looking West - May

slide-14
SLIDE 14

Measure L – Project Updates

Toyon FIS – Maker Space

slide-15
SLIDE 15

Measure L – Project Updates

Toyon FIS – Exterior Court

slide-16
SLIDE 16

Measure L – Project Updates

Toyon FIS – Library

slide-17
SLIDE 17

Project Updates

Northwood Elementary School – Portable Relocation

  • In progress:
  • Driveway and fencing at southwest corner of site along Lakewood

Drive – waiting for the City of San Jose to approve driveway permit

slide-18
SLIDE 18

Measure L – Program Schedule

Preconstruction Furniture Design Furniture Ordered Construction Quote Pricing Lead Tim e Start of School PO Generated Furniture Received and Placed Punch List

Construction Projects

1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4

Pie dm ont Parking I m provem ents Br ook tr e e FI S Che r r y wood FI S/ Modernization Toy on FI S

Furniture Projects

FI S Furniture - BT/ RK/ VP/ MM/ PM FI S Furniture - Toyon FI S Furniture - Cherrywood

Week Week October November September Week Week Week Week August

Construction Legend Furniture Legend

2 0 1 9

May June July Week