MEASURE L BOND UPDATE May 21, 2019 Measure L Overview Project - PDF document

MEASURE L BOND UPDATE May 21, 2019 Measure L Overview Project Updates Program Schedule Review Measure L Project Updates Cherrywood Elementary School - FIS Complete: Demolition Rough framing Plumbing


  1. MEASURE L BOND UPDATE May 21, 2019

  2. Measure L – Overview • Project Updates • Program Schedule Review

  3. Measure L – Project Updates Cherrywood Elementary School - FIS • Complete: • Demolition • Rough framing • Plumbing rough-in • Framing at roof platform • Elevator shaft steel framing • Elevator shaft framing • HVAC roof platform • In progress: • Elevator shaft sheetrock • Rough-in HVAC • Rough-in electrical • Flooring repair

  4. Measure L – Project Updates Cherrywood FIS – Kitchen/Elevator Area - April

  5. Measure L – Project Updates Cherrywood FIS – Kitchen/Elevator Area - May

  6. Measure L – Project Updates Cherrywood FIS – FIS Space Looking West- April

  7. Measure L – Project Updates Cherrywood FIS – FIS Space Looking West- April

  8. Measure L – Project Updates Cherrywood FIS – Front FIS Space Looking East- April

  9. Measure L – Project Updates Cherrywood FIS – Front FIS Space Looking East- April

  10. Measure L – Project Updates Toyon Elementary School - FIS • Mural installation • Grass installation • Library shelving • AV equipment Brooktree Elementary School - FIS • Printed ceiling tiles replacement

  11. Measure L – Project Updates Toyon FIS – Looking East - May

  12. Measure L – Project Updates Toyon FIS – Looking East - May

  13. Measure L – Project Updates Toyon FIS – Looking West - May

  14. Measure L – Project Updates Toyon FIS – Maker Space

  15. Measure L – Project Updates Toyon FIS – Exterior Court

  16. Measure L – Project Updates Toyon FIS – Library

  17. Project Updates Northwood Elementary School – Portable Relocation • In progress: • Driveway and fencing at southwest corner of site along Lakewood Drive – waiting for the City of San Jose to approve driveway permit

  18. Measure L – Program Schedule Construction Legend Furniture Legend Preconstruction Furniture Design Furniture Ordered Construction Quote Pricing Lead Tim e Start of School PO Generated Furniture Received and Placed Punch List Construction Projects 2 0 1 9 May June July August September October November Week Week Week Week Week Week Week 1 2 3 4 5 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 5 1 2 3 4 Pie dm ont Parking I m provem ents Br ook tr e e FI S Che r r y wood FI S/ Modernization Toy on FI S Furniture Projects FI S Furniture - BT/ RK/ VP/ MM/ PM FI S Furniture - Toyon FI S Furniture - Cherrywood

  19. Thank You

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.