MEASURE B PROGRAM UPDAT E CITIZENS BOND OVERSIGHT COMMITTEE: AUGUST 22, 2017 MEASURE B PROGRAM OVERVIEW Facilities Master Plans EXECUTIVE LEVEL SUMMARY Project Recap K03-35718: Performing Arts Project Summary: Small capital repairs.


slide-1
SLIDE 1

MEASURE B

PROGRAM UPDAT E

CITIZENS’ BOND OVERSIGHT COMMITTEE: AUGUST 22, 2017

slide-2
SLIDE 2

MEASURE B PROGRAM OVERVIEW Facilities Master Plans

slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5

EXECUTIVE LEVEL SUMMARY Project Recap

slide-6
SLIDE 6

K03-35718: Performing Arts

Project Summary: Small capital repairs. Status:

  • Floor replacement design complete.
  • Procurement will begin in the new year in order for

construction to begin after Memorial Day 2018.

slide-7
SLIDE 7

K07-35721: Maintenance & Operations Building and District Warehouse

Project Summary: New facility for M&O to replace existing structures, from both campuses, that are in disrepair; Storage facility/metal structure for District storage for surplus property, program storage, etc.; The following programs are also included: Police, Reprographics, Graphic Design, Shipping & Receiving. Status:

  • 100% SD under review
  • Review project budget soft costs and construction costs,

design/constructability review to begin

slide-8
SLIDE 8

K11-35715: Athletic Synthetic Turf Fields and Restroom/Storage Facilities

Project Summary: Replace existing natural grass field with synthetic turf fields with associated markings for various sports, restroom facility, addition to existing gym complex for storage or equipment, score boards, tennis courts, multi-purpose turf in PE complex, small capital repairs, perimeter fencing, laundry facilities, and FF&E. Status:

  • Bids open August 24
  • Baseball and ancillary buildings - Geohazard investigation

draft report due August 10, design footing and foundations per geohazard report, DSA submittal late August

slide-9
SLIDE 9

K18-35725: Demolition of Kent Avenue Maintenance Facilities

Project Summary: Demolition of Maintenance Facilities along Kent Avenue, Gardening Shed in Lot 10, and Batting Cages. Status:

  • Field demolition is complete with the exception of the

announcer’s booth due to migratory birds nesting on the structure.

slide-10
SLIDE 10

I21-35617: Organic Farm/Garden Enhancements

Project Summary: New prefabricated, DSA pre-approved building for classroom and demonstrations for organic farm & associated programs. Status:

  • Parking lot/site improvement package bids came in high.

This project will be rebid in the late fall/winter.

  • Geohazard report is currently in development
  • Construction Documents under development, DSA submittal

scheduled for week of 9/18/17

slide-11
SLIDE 11

I26-35610: Jonas Center and Building 18

Project Summary: Multi-purpose facility to seat at least 275-300 for seated dinner, commercial kitchen, stage, and Jonas Center staging, etc. Status:

  • Construction Documents under development
  • Anticipated Bidding January 2018
slide-12
SLIDE 12

I49-35618: Pomo Cluster

Project Summary: Buildings 1-7, Envelope improvements, windows replacement, mechanical repairs, flooring, painting, small capital repairs. Status:

  • Anticipate artist’s renderings September 2017
  • Anticipate Construction Documents November 2017
slide-13
SLIDE 13

I50-35613: Admin Cluster

Project Summary: Buildings 8-12, Envelope improvements, roofing replacement, windows replacement, mechanical repairs, flooring, painting, small capital repairs. Status:

  • Bid Documents for Bldg 8, 9, 10, 12 and 18 roofs due

August 18, 2017

slide-14
SLIDE 14

I51-35620: New Miwok Center

Project Summary: Buildings 13-16, All-new center for wellness, recreation, aquatics, athletics and kinesiology, designed for students and community access; The new Miwok Center will include a new gymnasium, Olympic size pool, warmup lap pool, and wellness center. Status:

  • Design/Build awarded to Blach/ELS on July 18, 2017
  • Design documents are being developed
slide-15
SLIDE 15

I55-35616: Outdoor Amphitheater

Project Summary: To build outdoor amphitheater to seat 250 guests with outdoor stage, sound system, accessibility to existing sidewalks and pathway to existing parking lots. Status:

  • DSA submittal scheduled for September 20, 2017
  • Submitted CGS (California Geological Survey) and DSA

Outdoor Water Use Applications July 17, 2017

slide-16
SLIDE 16

I57-35623: Demolition Project

Project Summary: Demolition of existing Corp Yard Facility and Buildings 11, 18, 19, 20, 22, 23, and other facilities as needed. Status:

  • Abatement is completed in Buildings #11, #18 and #19
  • Building #22 & #23 is scheduled to be completed with

abatement 8/25/17

slide-17
SLIDE 17

POMO CLUSTER Programming Review

slide-18
SLIDE 18

I49-35618 Pomo Cluster

Highlights:

  • Adding 10 classrooms
  • Replace antiquated fire alarm system
  • Replace and upgrade HVAC systems
  • Upgrading sidewalks for better ADA access
  • Replacement of 200+ windows
  • Replacement of 22k+ sq ft of siding

Phase 1: Exterior Modernization Update exterior with materials that are energy efficient and require less maintenance. Complete Fall 2019 Phase 2: Interior Modernization Update finishes and building systems to current standards and relocate walls to create more classrooms. Complete Fall 2019

slide-19
SLIDE 19

MAINTENANCE & OPERATIONS BUILDING and DISTRICT WAREHOUSE Schematic Design Review

slide-20
SLIDE 20

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

www.brick-inc.com SITE - AERIAL VIEW 08/01/2017

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-21
SLIDE 21

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

M+O WEST PERSPECTIVE /01/2017 0808/01/17 www.brick-inc.com

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-22
SLIDE 22

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

M+O FRONT ENTRY 08/01/2017 www.brick-inc.com

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-23
SLIDE 23

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

835 College Ave. Kentfield, CA 94904

CAMPUS POLICE ADMIN. BLDG. 08/01/2017 www.brick-inc.com

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-24
SLIDE 24

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

M+O LOADING DOCK AND SHOPS 08/01/2017 www.brick-inc.com

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-25
SLIDE 25

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

GROUNDS SHOP AND POLE BARN 08/01/2017 www.brick-inc.com

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-26
SLIDE 26

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

Floor Plan - M&O

slide-27
SLIDE 27

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

Floor Plan - CAMPUS POLICE/ADMIN. BLDG.

slide-28
SLIDE 28

COLLEGE OF MARIN - KENTFIELD M&O FACILITY

www.brick-inc.com SITE - AERIAL VIEW 08/01/2017

This image is a conceptual rendering and is not intended to be a final product of design. Final design shall be approved by the Board of Trustees.

slide-29
SLIDE 29

LEARNING RESOURCES CENTER and STUDENT SERVICES Project Initiation

slide-30
SLIDE 30

K15-35712 Learning Resources Center

Budget: $32,313,553 Budget Source: Measure B Scope: Study/assessment

  • f existing facilities and

space to warrant renovation, demolition, or new construction based on needs, programs, and current code conditions

slide-31
SLIDE 31

K13-35710 Student Services

Budget: $51,395,750 Budget Source: Measure B Scope: Study/assessment

  • f existing facilities and

space to warrant renovation, demolition, or new construction based on needs, programs, and current code conditions

slide-32
SLIDE 32

K15-35712 Learning Resources Center and K13-35710 Student Services

Combined Budget: $83,709,303 Initial Programming Thoughts:

Library Bookstore Student Accessibility Services (DSPS) Assessment Outreach Enrollment Services Office of Instructional Management (OIM) Internship Registration Cafeteria Foundation Counseling Student Activities and Advocacy Transfer Center EOPS/CARE & CalWORKs Tutoring and Learning Center Cashiering Veteran Resource Center Learning Communities (Puente, Umoja) Community Education William Keith Room Humiston Room Classrooms Computer Labs Health Services Mail Room Writing Lab Office Space CIS Lab Testing & Assessment Rooms for Student Groups Associated Student Groups Replacement of Village Square 6K Sq.ft.

Board Goals: What does the Board identify as its major goals and expectations for this project? Delivery Method: TBD Major Value Engineering Items: TBD

slide-33
SLIDE 33

K15-35712 Learning Resources Center and K13-35710 Student Services

□ Programming

□ Value Engineering

□ Schematic Design

□ Value Engineering

□ Design Development

□ Value Engineering

□ Construction Documents

□ Value Engineering

Board Reviews Completed

 Project Initiation

Board Reviews To Be Done

slide-34