MEAFORD LIBRARY FEASIBILITY STUDY September 26, 2016 STUDY PURPOSE AND METHODOLOGY Phase 1: Phase 2: 1. Facility condition assessment 1. Stakeholder consultation 2. Structural analysis existing buildings 2. Preliminary design 3. Draft


  1. MEAFORD LIBRARY FEASIBILITY STUDY September 26, 2016

  2. STUDY PURPOSE AND METHODOLOGY Phase 1: Phase 2: 1. Facility condition assessment 1. Stakeholder consultation 2. Structural analysis existing buildings 2. Preliminary design 3. Draft report and presentation to staff 3. Opinion of construction cost

  3. PHASE 1 FACILITY CONDITION ASSESSMENT AND STRUCTURAL ANALYSIS

  4. CONDITION ASSESSMENT - 15 TROWBRIDGE STREET W. Facility condition assessment • Over the next 25 years the library will require $429,110 in capital repairs to remain in operation with its current use. FCI Rating = Sum capital repairs next 5 years Estimated replacement value = $230,450 / $2.249 Million = 10.2% Poor Major capital repairs next 5 years: • Stair/handrail upgrades - $5,000 • Exterior wall repairs - $25,000 • Structural reinforcement - $65,000 • Roof replacement - $65,000 • Asphalt parking repair - $30,000 • Electrical upgrades - $5,000

  5. CONDITION ASSESSMENT - 15 TROWBRIDGE STREET W. Structural upgrades: • Retrofjts to ground fmoor joists and beams to accommodate stack loads. • If library stacks are located on a second fmoor, retrofjts to the second fmoor joists and beams, and existing foundations are likely required. • Shear crack in the masonry wall will require further investigation and observation/ inspections to determine if the movement continues. The crack must be repaired once the root cause is addressed. Accessibility upgrades: • The library does not have an elevator. Other components – ex. Door widths, aisle widths and the main entrance – do not meet current standards. Any change of use or signifjcant renovation will require that these defjciencies are addressed and comply with current OBC standards. • Costs in Phase 1 do not include accessibility upgrades.

  6. CONDITION ASSESSMENT - 21 TROWBRIDGE STREET W. Facility Condition Assessment • Over the next 25 years the building will require $333,410 in capital repairs to remain in operation with its current use. The FCI rating = Sum Capital Repairs next 5 years Estimated Replacement Value = $110,000 / $1.094 Million = 10.0% Fair Major Capital Repairs Next 5 Years: • Chimney removal/repairs - $15,000 • Roof replacement - $85,000

  7. CONDITION ASSESSMENT - 21 TROWBRIDGE STREET W. Structural Upgrades: • Areas with a suspended concrete fmoor slab (a small amount of area) will likely require retrofjts to the existing fmoor joists and beams to support library stack loads. • Future HVAC equipment placed on the existing rooftops should be supported on a separate frame to simplify any retrofjts to the existing roof. Accessibility Upgrades: • Any change of use or signifjcant renovation to the existing library will require defjciencies are addressed and comply with current OBC standards. • Costs in Phase 1 do not include accessibility upgrades

  8. CONCLUSIONS - PHASE 1 • The Meaford Public Library and Administration Buildings are not at the end of their service life. • To remain in working condition, the library and admin buildings will require a total of $762,520 in capital repairs over the next 25 years . Of that total, $449,900 is required in the next 10 years. • Any change of use or signifjcant renovation to either of the existing buildings will require that code and accessibility defjciencies are addressed and comply with current OBC standards. • LGA believes both buildings are candidates for renovation. The study should proceed to Phase 2 to investigate preliminary designs and costs for an expanded library.

  9. PHASE 2 PRELIMINARY DESIGN AND COST ESTIMATE

  10. Meaford฀Public฀Library Meaford฀Public฀Library Space฀Needs฀Analysis Space฀Needs฀Analysis Space฀Needs฀Analysis Meaford฀Public฀Library the main floor, the children’s rooms and the teen room on the lower level. Two meeting rooms on LIBRARY STAKEHOLDER CONSULTATION AND SPACE NEEDS ANALYSIS of the circulation office on the main floor and a suite of offices on the upper floor. The summary by space group breakdown is as follows: Existing Library Area: SPACE GROUP SUB-GROUP EXISTING The existing library has an assignable or net SPACE NAME sf sm area of 4,718 sf - less than half the ARUPLO A Adult Library 1,695 157.5 (Administrators of Rural and Urban Public B Children’s Suite 1,106 102.7 424 C Teen Room 39.4 Libraries of Ontario) guideline of one square D Public Amenities 114 10.6 foot per capita. E Community Facilities 647 60.1 732 F Library Staff & Volunteers 68.0 TOTAL ALL FUNCTIONS 4,718 438.3 All area figures express : true net space devoted to each function measured to inside face of defining partitions or boundaries. Internal circulation within exhibition spaces and aisles / manoeuvering space in Target for 11,000 Population: SPACE GROUP collection storage spaces are counted as part of the functional area. Otherwise no circulation, building structure, or SUB-GROUP REQUIRED LGA built on a previous study to develop building service space is counted as functional area. is also called . SPACE NAME sm sf sm targets for a library serving 11,000 people. LGA SUMMARY BY SPACE GROUP: The existing floor plans are illustrated on the following pages. A Adult Library 157.5 2,902 269.6 reviewed these targets with the library board, B Children’s Suite 102.7 2,347 218.1 staff and stakeholders during a consultation 838 C Teen Room 39.4 77.9 D Public Amenities 10.6 1,159 107.7 meeting. Additional space for the Friends E Community Facilities 60.1 2,675 248.5 F Library Staff & Volunteers 68.0 1,735 161.2 of Meaford Library was requested, as was additional private study area. TOTAL ALL FUNCTIONS 438.3 11,657 1,082.9 All area figures express All area figures express : true net space devoted to each function measured to inside face : true net space devoted to each function measured to inside face of defining partitions or boundaries. Internal circulation within exhibition spaces and aisles / manoeuvering space in of defining partitions or boundaries. Internal circulation within exhibition spaces and aisles / manoeuvering space in collection storage spaces are counted as part of the functional area. Otherwise no circulation, building structure, or collection storage spaces are counted as part of the functional area. Otherwise no circulation, building structure, or building service space is counted as functional area. building service space is counted as functional area. is also called . is also called .

  11. Space฀Needs฀Analysis Meaford฀Public฀Library Space฀Needs฀Analysis Meaford฀Public฀Library LIBRARY STAKEHOLDER CONSULTATION AND SPACE NEEDS ANALYSIS Targets for 7,500 Population: SPACE GROUP SUB-GROUP REQUIRED LGA developed an alternate area target for a sf SPACE NAME sm sm population of 7,500 people. This area target SUMMARY BY SPACE GROUP: 1,973 183.3 A Adult Library 157.5 2,902 269.6 assumes Meaford Public Library will continue to 2,347 149.2 B Children’s Suite 102.7 1,606 218.1 570 53.0 partner with Owen Sound to serve 3,500 people C Teen Room 39.4 838 77.9 846 78.6 1,159 D Public Amenities 10.6 107.7 on the west side of the municipality. 1,819 169.0 E Community Facilities 60.1 2,675 248.5 92.1 F Library Staff & Volunteers 68.0 1,735 991 161.2 7,805 725.1 TOTAL ALL FUNCTIONS 11,657 438.3 1,082.9 All area figures express All area figures express : true net space devoted to each function measured to inside face : true net space devoted to each function measured to inside face of defining partitions or boundaries. Internal circulation within exhibition spaces and aisles / manoeuvering space in of defining partitions or boundaries. Internal circulation within exhibition spaces and aisles / manoeuvering space in collection storage spaces are counted as part of the functional area. Otherwise no circulation, building structure, or collection storage spaces are counted as part of the functional area. Otherwise no circulation, building structure, or building service space is counted as functional area. building service space is counted as functional area. is also called . is also called .

  12. PRELIMINARY DESIGN - SCHEME 1

  13. SCHEME 1 - SITE PLAN TROWBRIDGE STREET EXISTING LIBRARY EXISTING ADMIN BUILDING PARKING 9 SPACES N BERRY STREET

  14. SCHEME 1 - SECTION MEAFORD PUBLIC LIBRARY EXISTING MUNICIPAL ADMINISTRATION BUILDING 15 TROWBRIDGE STREET 21 TROWBRIDGE STREET NEW ELEVATOR BEYOND NEW EXIT STAIR ADDITION BEYOND MULTI-PURPOSE LOBBY ROOM NEW CLERESTOREY CURTAIN WALL WINDOWS EXISTING ROOF BEYOND NEW CLERESTOREY CURTAIN WALL WINDOWS NEW STAIR SMALL LOUNGE MTG. ATRIUM ADULT COLLECTION HELP DESK PROG. RM. ENTRY TEEN LIBRARY STAIR MECH. EAST/WEST SECTION 1 1 : 75 SECTION DIAGRAM

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.