maximising energy efficiency
play

Maximising Energy Efficiency in Data Centre Design Maximising - PowerPoint PPT Presentation

Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley https://www.google.ie/imgres?imgurl =https%3A%2F%2Fechelon-


  1. Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley

  2. https://www.google.ie/imgres?imgurl =https%3A%2F%2Fechelon- dc.com%2Fwp- content%2Fthemes%2Fechelon%2Fim g%2Ffooter%2Flogo- colour.svg&imgrefurl=https%3A%2F%2 Fechelon- dc.com%2F&docid=kUDLHJD6dQy- qM&tbnid=Sl7fmsVArrz_OM%3A&vet =10ahUKEwjm3KjnsIriAhW4TxUIHUD4 CdUQMwhAKAAwAA..i&w=800&h=17 6&client=safari&bih=812&biw=1440& q=echelon%20data%20centres&ved=0 ahUKEwjm3KjnsIriAhW4TxUIHUD4CdU QMwhAKAAwAA&iact=mrc&uact=8

  3. http://mattturck.com/wp-content/uploads/2018/02/2018_Matt_Turck_IoT_Landscape_Final.png

  4. Compo Co position n of Total Expo ports 2017 2017 Computer Services 25% Pharma & Chemicals 24% Business Services 13% Financial Services & Insurance 9% Machinery & Transport Equipment 7% Miscellaneous manufactured 5% articles* Food 4% 0% 5% 10% 15% 20% 25% 30%

  5. Industry Reports www.bitpower.ie

  6. https://infrastructure.aws

  7. https://infrastructure.aws

  8. Sustainability & CSR

  9. Scale of Data Hosting facilities

  10. Efficiency Gains

  11. Other 1% Peat 7% Coal Renewables 12% 29% Gas 51%

  12. The EXEED process explained Designed Verified Managed Planning Design for Design for Project Summary Measure and Verify Energy Management Energy Performance Energy Management DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES DELIVERABLES • EED Project Execution Plan • Energy Balance Study of baseline • Energy Measurement Plan • Project Summary Report • Measurement and Veri fj cation • Asset within scope and design reports boundary of an ISO 50001 • Project organisation structure • Updated Energy Saving Register Energy Management System KEY REQUIREMENTS • Energy Saving Register, master • Updated Energy Saving Register • EED Expert and EED Owner document recording all ideas KEY REQUIREMENTS • Conclude all fj nancial, energy, KEY REQUIREMENTS and opportunities KEY REQUIREMENTS KEY REQUIREMENTS co-energy and other bene fj ts • Conduct energy variables review • Measurement and Veri fj cation for the asset in operation • Conduct Energy Review • Implement Measurement • De fj ne new roles, responsibilities • Conduct energy performance Plans using the Energy Balance • Capture all outcomes and and Veri fj cation plans and authorities deterioration review Study, Energy Saving Register information developed by • Adhere to competency • Understand the project risks and • Integrate other metering KEY REQUIREMENTS and Measurement and the process requirements for measurement opportunities requirements Veri fj cation data • Determine annual energy • Include the current revision and veri fj cation • Understand the organisation • Integrate new fj ndings including: • Continual improvement co nsumption and pro fj le of of the Energy Saving Register • Verify design assumptions and context, stakeholders and design changes, measurement of energy performance baseline design • Include lessons learnt operational energy performance interested parties and veri fj cation, performance • Consider alternative energy deterioration measurement, • Handover of the Energy • Management and approval by • Develop procurement strategies sources if relevant mitigants, new opportunities, Saving Register, technical EED Expert and EED Owner and requirements, including • Challenge baseline design using commissioning actions, documentation and other specialist suppliers a required methodology operational control knowledge to the operator • Assess co-energy bene fj ts • Ensure ongoing communication NEW PROJECT and integration into construction ORGANISATION and commissioning plans for implementation EED Owner • Continually assess for Accountable to Top management energy performance during for implementing the EXEED implementation requirements within the design project application EED Expert Responsible for the day-to-day execution, coordination and management of the EED activities O R G A N I S A T I O during the project lifecycle N S U P P L I E R TOP S MANAGEMENT PROJECT TEAM SPECIALIST SUPPLIERS DESIGN TEAM EED OWNER EED EXPERT REPORTING COMMUNICATION LINES

  13. Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.