Maximising Energy Efficiency in Data Centre Design Maximising Energy Efficiency in Data Centre Design 8 th May 2019 David McAuley SEAI EXEED 8 th May 2019 David McAuley https://www.google.ie/imgres?imgurl =https%3A%2F%2Fechelon-


slide-1
SLIDE 1

Maximising Energy Efficiency

in

Data Centre Design

8th May 2019

David McAuley

Maximising Energy Efficiency

in

Data Centre Design

SEAI EXEED

8th May 2019

David McAuley

slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7
slide-8
SLIDE 8

https://www.google.ie/imgres?imgurl =https%3A%2F%2Fechelon- dc.com%2Fwp- content%2Fthemes%2Fechelon%2Fim g%2Ffooter%2Flogo- colour.svg&imgrefurl=https%3A%2F%2 Fechelon- dc.com%2F&docid=kUDLHJD6dQy- qM&tbnid=Sl7fmsVArrz_OM%3A&vet =10ahUKEwjm3KjnsIriAhW4TxUIHUD4 CdUQMwhAKAAwAA..i&w=800&h=17 6&client=safari&bih=812&biw=1440& q=echelon%20data%20centres&ved=0 ahUKEwjm3KjnsIriAhW4TxUIHUD4CdU QMwhAKAAwAA&iact=mrc&uact=8

slide-9
SLIDE 9

http://mattturck.com/wp-content/uploads/2018/02/2018_Matt_Turck_IoT_Landscape_Final.png

slide-10
SLIDE 10

4% 5% 7% 9% 13% 24% 25% 0% 5% 10% 15% 20% 25% 30% Food Miscellaneous manufactured articles* Machinery & Transport Equipment Financial Services & Insurance Business Services Pharma & Chemicals Computer Services

Co Compo position n of Total Expo ports 2017 2017

slide-11
SLIDE 11

Industry Reports

www.bitpower.ie

slide-12
SLIDE 12
slide-13
SLIDE 13
slide-14
SLIDE 14

https://infrastructure.aws

slide-15
SLIDE 15

https://infrastructure.aws

slide-16
SLIDE 16

Sustainability & CSR

slide-17
SLIDE 17

Scale of Data Hosting facilities

slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21
slide-22
SLIDE 22

Efficiency Gains

slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30

Renewables 29% Gas 51%

Other 1%

Coal 12% Peat 7%

slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34
slide-35
SLIDE 35
slide-36
SLIDE 36
slide-37
SLIDE 37
slide-38
SLIDE 38
slide-39
SLIDE 39

The EXEED process explained

DELIVERABLES

  • EED Project Execution Plan
  • Project organisation structure
  • EED Expert and EED Owner

KEY REQUIREMENTS

  • Defj

ne new roles, responsibilities and authorities

  • Understand the project risks and
  • pportunities
  • Understand the organisation

context, stakeholders and interested parties

  • Develop procurement strategies

and requirements, including specialist suppliers

DELIVERABLES

  • Energy Balance Study of baseline

design

  • Energy Saving Register, master

document recording all ideas and opportunities

  • Measurement and Verifj

cation Plans

KEY REQUIREMENTS

  • Determine annual energy

consumption and profj le of baseline design

  • Consider alternative energy

sources if relevant

  • Challenge baseline design using

a required methodology

  • Assess co-energy benefj

ts

  • Ensure ongoing communication

and integration into construction and commissioning plans for implementation

  • Continually assess for

energy performance during implementation

DELIVERABLES

  • Energy Measurement Plan
  • Updated Energy Saving Register

KEY REQUIREMENTS

  • Conduct energy variables review
  • Conduct energy performance

deterioration review

  • Integrate other metering

requirements

  • Integrate new fj

ndings including: design changes, measurement and verifj cation, performance deterioration measurement, mitigants, new opportunities, commissioning actions,

  • perational control

Planning Design for Energy Performance Design for Energy Management

DELIVERABLES

  • Project Summary Report

KEY REQUIREMENTS

  • Conclude all fj

nancial, energy, co-energy and other benefj ts for the asset in operation

  • Capture all outcomes and

information developed by the process

  • Include the current revision
  • f the Energy Saving Register
  • Include lessons learnt
  • Handover of the Energy

Saving Register, technical documentation and other knowledge to the operator

DELIVERABLES

  • Measurement and Verifj

cation reports

  • Updated Energy Saving Register

KEY REQUIREMENTS

  • Implement Measurement

and Verifj cation plans

  • Adhere to competency

requirements for measurement and verifj cation

  • Verify design assumptions and
  • perational energy performance
  • Management and approval by

EED Expert and EED Owner

DELIVERABLES

  • Asset within scope and

boundary of an ISO 50001 Energy Management System

KEY REQUIREMENTS

  • Conduct Energy Review

using the Energy Balance Study, Energy Saving Register and Measurement and Verifj cation data

  • Continual improvement
  • f energy performance

Project Summary Measure and Verify Energy Management

REPORTING COMMUNICATION LINES EED OWNER EED EXPERT O R G A N I S A T I O N TOP MANAGEMENT PROJECT TEAM SPECIALIST SUPPLIERS DESIGN TEAM

S U P P L I E R S

NEW PROJECT ORGANISATION EED Owner

Accountable to Top management for implementing the EXEED requirements within the design project application

EED Expert

Responsible for the day-to-day execution, coordination and management of the EED activities during the project lifecycle

Designed Verified Managed

slide-40
SLIDE 40

Maximising Energy Efficiency

in

Data Centre Design

8th May 2019

David McAuley

Maximising Energy Efficiency

in

Data Centre Design

SEAI EXEED

8th May 2019

David McAuley

slide-41
SLIDE 41