management
play

Management 32 staff with a current operating budget of $11.8M - PowerPoint PPT Presentation

Horizons River Management 32 staff with a current operating budget of $11.8M 34 River and drainage schemes Providing protection/benefit to 10 urban areas and 75,000 hectares of rural land 1,270km of river channel Horizons


  1. Horizons River Management – 32 staff with a current operating budget of $11.8M – 34 River and drainage schemes – Providing protection/benefit to 10 urban areas and 75,000 hectares of rural land

  2. • 1,270km of river channel Horizons River • 1,100km of drain Management • 23 pump stations with a total discharge capacity of 43m 3 /s • 53 detention dams that store 4.3 million cubic metres of floodwater • 500km of stopbanks

  3. Significant river management issues for the Region • Operational reliability • Sediment build-up reducing flood protection standards • Urban growth • Climate change

  4. Te Kawau Drainage Scheme Scheme Facts • Scheme Assets. • 46 floodgated culverts • 179 km of drainage channels • 2 Pump station • 29 km Stopbanks • Total Asset Value: $8,270,486. • Scheme Area 14,240ha. • Predominantly servicing dairy, horticultural land and an increasing number of lifestyle blocks.

  5. TE KAWAU DRAINAGE SCHEME Strategic Direction Review the current configuration of the scheme to ensure that the scheme is providing a consistent level of service to all of the scheme ratepayers. Aim Maintain the existing network of drainage channels and flood protection and review the remaining life of the scheme major assets. Scheme Design Criteria • Drainage Channels: • Design is based on a 3-5 year rainfall event. • Drain full drainage coefficient of 25mm/day. • Culverts: • Designed based on drain full plus 30%. • Designed for a 50mm head loss over the culvert.

  6. TE KAWAU DRAINAGE SCHEME Scheme Design Criteria Continued • Stopbanks: • Main Drain stopbanks are designed for a 3-4 year event before over topping of spillway is likely to occur. • Pumping • Pumping Co-efficient: • Raupo Road = 12.4mm/ha/day • Dixons (Local Flows) = 52mm/ha/day • Dixons (spill over from No.6) = 4.2mm/ha/day

  7. Scheme Funding 17% 1% 7% 0% 0% Funding Policy 1% 0% 1% 1% 2% The Schemes funding comes from three revenue sources: • Targeted Rates – differential targeted rates levied on properties directly benefiting from 17% or causing the need for the work. 80% of scheme cost. • General Rates – uniformed rate levied over all 1% properties in the Horizons Region. 20% of the 1% scheme cost. 38% • Other income – Revenue from lease land, forestry blocks, scheme reserves, etc. held by 11% the scheme. This is used to reduce the level Drainage UTR Drainage - Sluggish Drainage - Oroua of the targeted rate Drainage - Awahuri Drainage - Railway and Rangiotu Flood Control - Main Drain Flood Control - Kopane Pumping Raupo Rd - direct benefit Pumping Dixons high benefit Pumping Dixons moderate-low benefit Contribution Pumping Raupo Road Contribution Pumping Dixons - drainage Contribution Pumping Dixons - flood Contribution Flood Control and Pumping Rongotea Contribution

  8. Key Activities and Issues: 2019-2020 • Scheme Expenditure • Expenditure is on track to be within the original budget. • Works Activity • Drain maintenance program is currently being prepared and work will hopefully be underway by mid March. • A review performance of the Sluggish Main Drain between Main Drain Road and Leen Road is currently underway.

  9. Works Budget vs Actual: 2019-20 Capex Renewals Maintenance Operating $0 $20,000 $40,000 $60,000 $80,000 $100,000 $120,000 $140,000 Actual Budget

  10. Income and Expenditure: 2019-2020 Operating Expenditure Income Reserve (Net Movement), - Other Income, $12,511 $10,047. Administration, $53,147 General Rates, $51,797. Works, $172,375 Capex, $36,993 Scheme Rates, $207,187.

  11. Key Activities and Issues: 2020-21 • Scheme Budget • $8,841 increase in works expenditure • Scheme Rate increase of 4%. ($7,184) • Draw down on Emergency $10k. • On Track with LTP budget expectations • Works Activity • On going maintenance of scheme assets. • Review/Audit • Review of floodgates and Pump stations and development of O&M Manuals starting 2022-23.

  12. Works Budget 2019-2020 vs 2020-21 Capex Renewals Maintenance Operating $0 $20,000 $40,000 $60,000 $80,000 $100,000 Budget 2019-20 Budget 2020-21

  13. Income and Expenditure 2020-21 Income Operating Expenditure Other Income, Reserves (net $19,235. movement), -$21,880 General Rates, Administration, $51,797. $55,783 Capex/Renewals, Scheme Rates, $43,900 Works , $181,216 $207,187.

  14. Te Kawau Drainage Scheme 450,000 Opex/R&M Expenditure Adminstration Cost Scheme Review/Audit Cost Loan Funding Cost Capex Expenditure Scheme Rates 400,000 Note: Periods 12/13 – 18/19 show actual expenditure. While 19/20 – 27/28 are forecasted expenditure 350,000 300,000 250,000 200,000 150,000 100,000 50,000 - 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28

  15. Emergency Reserve Balance $250,000 Note: Periods 12/13 – 18/19 show actual expenditure. While 19/20 – Net Movement Balance Target 27/28 are forecasted expenditure $200,000 $150,000 $100,000 $50,000 $0 -$50,000 -$100,000

  16. Renewal Reserve Balance $150,000 Note: Periods 12/13 – 17/18 show actual expenditure. While 18/19 – 27/28 are forecasted expenditure $100,000 $50,000 $0 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28 -$50,000 -$100,000 Net Movement Balance

  17. Issues Arising from 2019 Catchment Community Meetings Issues Action Required Who Comment Drain Access The need to inform landowners regarding the access to scheme john Hope to have newsletter out before the end of drains for maintenance the financial year HRC powers in regards to drain maintenance Investigate what powers HRC have to undertake the work on a Ramon/ David council lawyers investigated individuals property cotton • Drain Maintenance Gum trees along main drain at Tiakorea bridge need to come out Emily Completed • Johnson drain at Leen road needs to be machine cleaned

  18. The End

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend