Horizons River Management 32 staff with a current operating budget of $11.8M 34 River and drainage schemes Providing protection/benefit to 10 urban areas and 75,000 hectares of rural land 1,270km of river channel Horizons


slide-1
SLIDE 1
slide-2
SLIDE 2

Horizons River Management

– 32 staff with a current operating budget of $11.8M – 34 River and drainage schemes – Providing protection/benefit to 10 urban areas and 75,000 hectares of rural land

slide-3
SLIDE 3

Horizons River Management

  • 1,270km of river

channel

  • 1,100km of drain
  • 23 pump stations with

a total discharge capacity of 43m3/s

  • 53 detention dams

that store 4.3 million cubic metres of floodwater

  • 500km of stopbanks
slide-4
SLIDE 4

Significant river management issues for the Region

  • Operational

reliability

  • Sediment build-up

reducing flood protection standards

  • Urban growth
  • Climate change
slide-5
SLIDE 5

Te Kawau Drainage Scheme

Scheme Facts

  • Scheme Assets.
  • 46 floodgated culverts
  • 179 km of drainage

channels

  • 2 Pump station
  • 29 km Stopbanks
  • Total Asset Value: $8,270,486.
  • Scheme Area 14,240ha.
  • Predominantly servicing dairy,

horticultural land and an increasing number of lifestyle blocks.

slide-6
SLIDE 6

TE KAWAU DRAINAGE SCHEME

Strategic Direction Review the current configuration of the scheme to ensure that the scheme is providing a consistent level of service to all of the scheme ratepayers. Aim Maintain the existing network of drainage channels and flood protection and review the remaining life of the scheme major assets. Scheme Design Criteria

  • Drainage Channels:
  • Design is based on a 3-5 year rainfall event.
  • Drain full drainage coefficient of 25mm/day.
  • Culverts:
  • Designed based on drain full plus 30%.
  • Designed for a 50mm head loss over the culvert.
slide-7
SLIDE 7

TE KAWAU DRAINAGE SCHEME

Scheme Design Criteria Continued

  • Stopbanks:
  • Main Drain stopbanks are designed for a 3-4 year event before over topping of spillway is likely to
  • ccur.
  • Pumping
  • Pumping Co-efficient:
  • Raupo Road = 12.4mm/ha/day
  • Dixons (Local Flows) = 52mm/ha/day
  • Dixons (spill over from No.6) = 4.2mm/ha/day
slide-8
SLIDE 8

Scheme Funding

Funding Policy

The Schemes funding comes from three revenue sources:

  • Targeted Rates – differential targeted rates

levied on properties directly benefiting from

  • r causing the need for the work. 80% of

scheme cost.

  • General Rates – uniformed rate levied over all

properties in the Horizons Region. 20% of the scheme cost.

  • Other income – Revenue from lease land,

forestry blocks, scheme reserves, etc. held by the scheme. This is used to reduce the level

  • f the targeted rate

17% 38% 11% 1% 1% 17% 1% 2% 1% 0% 1% 0% 0% 7% 1% Drainage UTR Drainage - Sluggish Drainage - Oroua Drainage - Awahuri Drainage - Railway and Rangiotu Flood Control - Main Drain Flood Control - Kopane Pumping Raupo Rd - direct benefit Pumping Dixons high benefit Pumping Dixons moderate-low benefit Contribution Pumping Raupo Road Contribution Pumping Dixons - drainage Contribution Pumping Dixons - flood Contribution Flood Control and Pumping Rongotea Contribution

slide-9
SLIDE 9
slide-10
SLIDE 10

Key Activities and Issues: 2019-2020

  • Scheme Expenditure
  • Expenditure is on track to be within the original budget.
  • Works Activity
  • Drain maintenance program is currently being prepared and work will hopefully be

underway by mid March.

  • A review performance of the Sluggish Main Drain between Main Drain Road and Leen

Road is currently underway.

slide-11
SLIDE 11

Works Budget vs Actual: 2019-20

$0 $20,000 $40,000 $60,000 $80,000 $100,000 $120,000 $140,000 Operating Maintenance Renewals Capex

Actual Budget

slide-12
SLIDE 12

Income and Expenditure: 2019-2020

Scheme Rates, $207,187. General Rates, $51,797. Other Income, $10,047.

Income

Works, $172,375 Capex, $36,993 Administration, $53,147 Reserve (Net Movement), - $12,511

Operating Expenditure

slide-13
SLIDE 13

Key Activities and Issues: 2020-21

  • Scheme Budget
  • $8,841 increase in works expenditure
  • Scheme Rate increase of 4%. ($7,184)
  • Draw down on Emergency $10k.
  • On Track with LTP budget expectations
  • Works Activity
  • On going maintenance of scheme assets.
  • Review/Audit
  • Review of floodgates and Pump stations and development of O&M Manuals starting

2022-23.

slide-14
SLIDE 14

Works Budget 2019-2020 vs 2020-21

$0 $20,000 $40,000 $60,000 $80,000 $100,000 Operating Maintenance Renewals Capex

Budget 2019-20 Budget 2020-21

slide-15
SLIDE 15

Income and Expenditure 2020-21

Scheme Rates, $207,187. General Rates, $51,797. Other Income, $19,235.

Income

Works , $181,216 Capex/Renewals, $43,900 Administration, $55,783 Reserves (net movement), -$21,880

Operating Expenditure

slide-16
SLIDE 16
  • 50,000

100,000 150,000 200,000 250,000 300,000 350,000 400,000 450,000 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28

Te Kawau Drainage Scheme

Opex/R&M Expenditure Adminstration Cost Scheme Review/Audit Cost Loan Funding Cost Capex Expenditure Scheme Rates Note: Periods 12/13 – 18/19 show actual expenditure. While 19/20 – 27/28 are forecasted expenditure

slide-17
SLIDE 17

Emergency Reserve Balance

  • $100,000
  • $50,000

$0 $50,000 $100,000 $150,000 $200,000 $250,000

Net Movement Balance Target Note: Periods 12/13 – 18/19 show actual expenditure. While 19/20 – 27/28 are forecasted expenditure

slide-18
SLIDE 18

Renewal Reserve Balance

  • $100,000
  • $50,000

$0 $50,000 $100,000 $150,000 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22 2022-23 2023-24 2024-25 2025-26 2026-27 2027-28

Net Movement Balance

Note: Periods 12/13 – 17/18 show actual expenditure. While 18/19 – 27/28 are forecasted expenditure

slide-19
SLIDE 19

Issues Arising from 2019 Catchment Community Meetings

Issues Action Required Who Comment Drain Access The need to inform landowners regarding the access to scheme drains for maintenance john Hope to have newsletter out before the end of the financial year HRC powers in regards to drain maintenance Investigate what powers HRC have to undertake the work on a individuals property Ramon/ David cotton council lawyers investigated Drain Maintenance

  • Gum trees along main drain at Tiakorea bridge need to come out
  • Johnson drain at Leen road needs to be machine cleaned

Emily Completed