US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Dam and Lake New Melones Dam and Lake

slide-2
SLIDE 2

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Flood Control New Melones Flood Control Requirements Requirements

Water Control Manual, Jan 1980 Water Control Manual, Jan 1980 Chapter 5, Flood Control Requirements Chapter 5, Flood Control Requirements Chapter 6, General Project Operation Chapter 6, General Project Operation Chapter 7, Operational Controls Chapter 7, Operational Controls Appendix Part 1, Standing Instructions to Appendix Part 1, Standing Instructions to Damtenders Damtenders Water Control Diagram Water Control Diagram Code of Federal Regulations (CFR) Title 33, Chapter II, Part Code of Federal Regulations (CFR) Title 33, Chapter II, Part 208.11 208.11

slide-3
SLIDE 3

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Flood Control New Melones Flood Control Requirements Requirements

Water Control Manual, Jan 1980 Water Control Manual, Jan 1980 Freedom of Information Act (FOIA) request Freedom of Information Act (FOIA) request District FOIA Officer, 916 District FOIA Officer, 916-

  • 557

557-

  • 7236

7236 Code of Federal Regulations (CFR) Title 33, Chapter II, Part Code of Federal Regulations (CFR) Title 33, Chapter II, Part 208.11 208.11 http://www.access.gpo.gov/nara/cfr/cfr http://www.access.gpo.gov/nara/cfr/cfr-

  • table

table-

  • search.html

search.html

slide-4
SLIDE 4

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Flood Control New Melones Flood Control Requirements Requirements

General Objectives General Objectives 1.

  • 1. To restrict flows in the Stanislaus River

To restrict flows in the Stanislaus River d/s d/s from New Melones dam to a controlling from New Melones dam to a controlling rate of 8,000 cfs at Orange Blossom Bridge rate of 8,000 cfs at Orange Blossom Bridge

  • 2. Provide the maximum conservation
  • 2. Provide the maximum conservation

storage practicable without impairing the storage practicable without impairing the flood control function of the reservoir. flood control function of the reservoir.

slide-5
SLIDE 5

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

General Objectives General Objectives

  • 3. Provide the maximum amount of power
  • 3. Provide the maximum amount of power

practicable without impairing the flood practicable without impairing the flood control and conservation functions of the control and conservation functions of the reservoir. reservoir.

  • 4. Provide releases to enhance an
  • 4. Provide releases to enhance an

anadromous anadromous fishery on the lower fishery on the lower Stanislaus River.

New Melones Flood Control New Melones Flood Control Requirements Requirements

Stanislaus River.

slide-6
SLIDE 6

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

General Objectives General Objectives

  • 5. Provide release to meet established water
  • 5. Provide release to meet established water

quality objectives for the Stanislaus River quality objectives for the Stanislaus River and the San Joaquin River at and the San Joaquin River at Vernalis Vernalis. .

  • 6. Maintain a minimum pool of 300,000 ac
  • 6. Maintain a minimum pool of 300,000 ac-
  • ft

ft for power and recreation.

New Melones Flood Control New Melones Flood Control Requirements Requirements

for power and recreation.

slide-7
SLIDE 7

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Water Control New Melones Water Control Diagram Diagram

slide-8
SLIDE 8

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Water Control New Melones Water Control Diagram Diagram

slide-9
SLIDE 9

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Water Control New Melones Water Control Diagram Diagram

slide-10
SLIDE 10

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Water Control New Melones Water Control Diagram Diagram

Temporary Departures from the Water Control Requirements: Temporary Departures from the Water Control Requirements:

  • Deviations from Approved Water Control Plans covered under Sout

Deviations from Approved Water Control Plans covered under South h Pacific Division Guidance Regulation CESPD Pacific Division Guidance Regulation CESPD-

  • R 1110

R 1110-

  • 2

2-

  • 8.

8.

  • Agency requesting the deviation pays all study costs.

Agency requesting the deviation pays all study costs.

  • Environmental Review will be required.

Environmental Review will be required.

  • More than one deviation is likely to require a formal change to

More than one deviation is likely to require a formal change to the the Water Control Diagram/Plan. Water Control Diagram/Plan.

slide-11
SLIDE 11

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Water Control New Melones Water Control Diagram Diagram

Formal Changes Formal Changes to the Water Control to the Water Control Plan/Diagram: Plan/Diagram:

  • Studies would be required

Studies would be required

  • Scope of Study would be

Scope of Study would be

  • negotiated. Funding would
  • negotiated. Funding would

have to be arranged have to be arranged

  • Environmental Review would

Environmental Review would be required. be required.

  • Hydrology would be updated.

Hydrology would be updated.

  • Possibility of required increase

Possibility of required increase in flood control space as a result in flood control space as a result

  • f Hydrology update.
  • f Hydrology update.
slide-12
SLIDE 12

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http:// http:// www.usbr.gov/mp/ccao/nmrpo www.usbr.gov/mp/ccao/nmrpo/ /

slide-13
SLIDE 13

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http:// http:// www.usbr.gov/dataweb/index.html www.usbr.gov/dataweb/index.html

slide-14
SLIDE 14

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http:// http:// www.usbr.gov/dataweb/html/newmelones.html www.usbr.gov/dataweb/html/newmelones.html

slide-15
SLIDE 15

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http:// http:// cdec.water.ca.gov cdec.water.ca.gov/ /

slide-16
SLIDE 16

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http:// http:// cdec.water.ca.gov/river/stanStages.html cdec.water.ca.gov/river/stanStages.html

slide-17
SLIDE 17

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

New Melones Information New Melones Information

http://www.spk http://www.spk-

  • wc.usace.army.mil

wc.usace.army.mil/ /

slide-18
SLIDE 18

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

slide-19
SLIDE 19

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

slide-20
SLIDE 20

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

slide-21
SLIDE 21

US Army Corps

  • f Engineers

Sacramento District Water Management

Water Management Water Management

Kevin Richardson Kevin Richardson Water Management Section Water Management Section Sacramento District Sacramento District U.S. Army Corps of Engineers U.S. Army Corps of Engineers 1325 J Street 1325 J Street Sacramento, CA 95816 Sacramento, CA 95816 Phone 916.557.7108 Phone 916.557.7108 Fax 916.557.7863 Fax 916.557.7863 [ [ mailto:Kevin.a.richardson@usace.army.mil mailto:Kevin.a.richardson@usace.army.mil] ]