Making the Most with Stormwater From each home and down to the - - PowerPoint PPT Presentation
Making the Most with Stormwater From each home and down to the San Pedro River Catlow Shipek Policy and Technical Director Kieran Sikdar, CFM Engineer and Program Manager Watershed Management Group develops and implements community
Policy and Technical Director
Engineer and Program Manager
Demand Reduction – Low Impact Development Practices Enhanced Recharge – Geomorphic Restoration Treatments Enhanced Urban Recharge – Direct Recharge Facility
Demand Reduction – Low Impact Development Practices
Fry Blvd Main Gate Entrance
Scenario: 10% LID adoption
distributed features included retrofits of:
landscapes
landscapes
way 4” ponding basin depth (assume no infiltration during rain event) 2 year, 6 hour rain
Scenario: 10% LID adoption
distributed features included retrofits of:
landscapes
landscapes
way 4” ponding basin depth (assume no infiltration during rain event) 2 year, 6 hour rain
Scenario: 10% LID adoption
distributed features included retrofits of:
landscapes
landscapes
way 4” ponding basin depth (assume no infiltration during rain event) 2 year, 6 hour rain
Costs
Installation and maintenance
Benefits
Based on the volume of water harvested and the number of trees planted.
Demand Reduction – Low Impact Development Practices Enhanced Recharge – Geomorphic Restoration Treatments
Image credit: Stream Dynamics Image credit: Stream Dynamics
Location: San Vicente Creek, Silver City, NM Built for a 100yr (8600cfs) event with a 1.5‐2 design safety factor
vegetation for long‐term natural stability
Image credit: Stream Dynamics
Demand Reduction – Low Impact Development Practices Enhanced Recharge – Geomorphic Restoration Treatments Enhanced Urban Recharge – Direct Recharge Facility
Assumption - Three Scenario Timeframes (fixed, not variables in this model) Percentage
relative to current use (assumed) Population Growth Rate per year (assumed) Adoption by SV home of RWH and efficiency Change per year (Assumed) Sierra Vista GPCD Rate
per year (assumed) Other Demand Change per year (assumed) Channel Portion Treated to Enhance Urban Stream Recharge for Sierra Vista (assumed) Phase 1: Early adopters 2015-2020 100% 0.0% 5.0%
10.0% Phase 2: Moderate adopters 2021-2025 100% 2.0% 10.0%
10.0% Phase 3: Majority adopted 2026-2030 100% 2.0% 10.0%
0.0% Fixed Parameters Demand Impacts on Deficit Sierra Vista Subwatershed MODEL PARAMETERS