Sabin Point Park, East Providence Sabin Point stormwater - - PowerPoint PPT Presentation
Sabin Point Park, East Providence Sabin Point stormwater - - PowerPoint PPT Presentation
Sabin Point Park, East Providence Sabin Point stormwater infiltration and buffer conceptual plan by Save The Bay (2014) Infiltrate stormwater in Locust St. ROW Daylight stormwater and infiltrate in Middle St. ROW Infiltrate stormwater from
Daylight stormwater and infiltrate in Middle St. ROW Goal to remove pipes at beach Infiltrate stormwater from Shore Rd and parking lot in park
Sabin Point stormwater infiltration and buffer conceptual plan by Save The Bay (2014)
Infiltrate stormwater in Locust St. ROW Area in park to create wetland End of road retrofit at Knowlton Ave Install buffer of native grasses to reduce use of park by geese
Sabin Point Watershed
Impervious surfaces: 59% roads/41% roofs or driveways
Sabin Point stormwater infiltration plan
Water quality volume: 29,342 cubic feet Total Water quality volume of watershed 67,517 cubic feet
- 1. Shore Rd stormwater filtration
area prior to installation
1 3
- 3. Pipe from Shore Road storm
drain
2
2: Former storm drain that discharged directly to beach
Shore Road/Sabin Point Park sand filter
Direction of runoff
Sabin Point grass sand filter
- installed by East Providence DPW fall of 2017, online summer of 2018
Stormwater filtration area inlet structure and forebay Stormwater overflow flows through existing pipe
Inspection and Maintenance
1
- 2. Locust right of way; install grass sand filter
and direct surface runoff to right of way
2
- 1. Hydrodynamic separators installed with sumps
and underground infiltration trenches in 2018
Subsurface infiltration in city ROW
~ area of proposed gravel wetland ~ area of proposed grass conveyance swale for
- verflow
Proposed sand filter area in knotweed; proposed gravel wetland area in foreground