Reconstruction
Ma May 20, 2020 y 20, 2020
M Reconstruction Ma May 20, 2020 y 20, 2020 Project Need 16,000 - - PowerPoint PPT Presentation
M Reconstruction Ma May 20, 2020 y 20, 2020 Project Need 16,000 vehicles per day AM & PM Congestion Project Need From the Brown County Planning Commission 2017 Congestion Management Process Update Project Goals The Brown County
Ma May 20, 2020 y 20, 2020
From the Brown County Planning Commission 2017 Congestion Management Process Update
pedestrians, and bicyclists.
including access management strategies for the corridor.
development growth.
needs without overbuilding.
to traffic, businesses, schools, etc.
etc.) the municipalities may want to incorporate into the project.
2020 – 2022: Field surveys, community input, & design. 2023 – 2024: R/W acquisition & utility work. 2024 – 2025: Road construction. Details
12’ Paved Trail
5’ Concrete Sidewalk
12’ Asphalt Lane 12’ Asphalt Lane 16’ Two Way Left Turn Lane 12’ Asphalt Lane 12’ Asphalt Lane
Belmont Rd. – CTH HS
High School traffic can utilize the Rockwell Lane roundabout. CTH M traffic can be detoured through the Belmont roundabout during this stage. Detour route will be Belmont Road to Belle Plane Road to Cardinal Lane for this stage.
Belmont Rd. – Rockwell Ln.
WB right lane becomes right turn only onto NB Carolina Cherry Dr.
Carolina Cherry Dr. Belmont Rd.
EB additional lane and TWLTL starts after house east of Belmont Rd.
Belmont Rd. – Rockwell Ln.
Perform the work during summer break to avoid school traffic. Any school traffic can use Carolina Cherry Drive. Detour route will be Belmont Road to Belle Plane Road to Cardinal Lane to CTH EB (Woodale Ave.) to CTH HS (Velp Ave.) for this stage.
Rockwell Ln. – Cardinal Ln.
Detour route will be Cardinal Lane to CTH EB (Woodale Ave.) to CTH HS (Velp Ave.) for this stage.
Cardinal Ln. – CTH HS
12’ Paved Trail
Raised Grass Median Driveways Right‐In, Right‐Out
CTH HS – US 41
12’ Asphalt Lane 12’ Asphalt Lane 12’ Asphalt Lane 12’ Asphalt Lane
Detour route will be Cardinal Lane to CTH EB (Woodale Ave.) to Cornell Road for this stage. Traffic from the east (US 41) will be able to utilize the Urban Edge (Festival Food) roundabout.
CTH HS – Urban Edge
Detour route will be W. Deerfield Ave. to CTH EB (Lakeview Dr. & Woodale Ave.) to CTH HS (Velp Ave.) for this stage. Roundabout at Cornell Road is likely. Dedicated WB left turn lane likely for Brookfield Ave.
Urban Edge – US 41
Municipality 2024 Projects 2025 Projects Project Totals Suamico $ 1,652,467 $ 2,717,500 $ 4,369,967 Howard $ 2,763,533 $ 2,717,500 $ 5,481,033 County $ 4,224,000 $ 5,435,000 $ 9,659,000 Totals: $ 8,640,000 $ 10,870,000 $ 19,510,000