LREC/ZREC Year 4 RFP
I nfo rma tio na l We b ina r Ma y 15, 2015
1
LREC/ZREC Year 4 RFP I nfo rma tio na l We b ina r Ma y 15, 2015 - - PowerPoint PPT Presentation
LREC/ZREC Year 4 RFP I nfo rma tio na l We b ina r Ma y 15, 2015 1 Program Overview Christie Bra dwa y, E ve rso urc e Ga ry Zie la nski, UI 2 Presentation Questions Sub mit q ue stio ns via e ma il o nly: L RE C.ZRE C@ e ve
I nfo rma tio na l We b ina r Ma y 15, 2015
1
Christie Bra dwa y, E ve rso urc e Ga ry Zie la nski, UI
2
RE C.ZRE C@ e ve rso urc e .c o m
q ue stio ns will b e a ddre sse d.
to a ll we b ina r pa rtic ipa nts.
3
I n the e ve nt o f a ny inc o nsiste nc y b e twe e n the pro visio ns o f the L RE C/ ZRE C RF P o r a ny pa rt o f this pre se nta tio n, the pro visio ns o f the Sta nda rd Co ntra c t a re c o ntro lling . Bidde rs sho uld re vie w the Sta nda rd Co ntra c t a nd a ll a sso c ia te d do c ume nts tho ro ug hly a nd sub mit the ir Bids b a se d upo n the Sta nda rd Co ntra c t, whic h will so le ly g o ve rn the tra nsa c tio ns b e twe e n the se le c te d Bidde r a nd the ir c o unte rpa rty Co mpa ny thro ug h the te rm o f the re sulting c o ntra c t.
4
5
Eversource Energy United Illuminating Category Size Total # Projects Selected (To Date) Avg $/REC Year 1 Avg $/REC Year 2 Avg $/REC Year 3 Total # UI Projects Selected (To Date) Avg $/REC Year 1 Avg $/REC Year 2 Avg $/REC Year 3 LRECs Up to 2 MW 44 $66 $57 (↓14%) $56 (↓2%) 10 $51.08 $49.43 (↓3%) $56.12 (14%) Large ZRECs 250 – 1,000 kW 60 $101 $77 (↓24%) $59 (↓23%) 18 $117.27 $90.43 (↓23%) $65.76 (↓27%) Medium ZRECs +100 – 250 kW 188 $149 $94 (↓37%) $74 (↓21%) 57 $135.36 $102.31 (↓24%) $76.40 (↓25%) Small ZRECs 0 – 100 kW 755 $164.22 $103.01 (↓37%) $80.97 (↓21%) 150 $148.89 $112.54 (↓24%) $84.04 (↓25%) Total 1,047 235
P)
C T a riff
Project Type Size Annual Budget Renewable Energy Credit Price Cap Large ZRECs ≥250 kW to 1,000 kW Approximately $2.7 M Max = $281.52/REC Medium ZRECs >100 kW < 250 kW Approximately $2.7 M Max = $281.52/REC LRECs Up to 2,000 kW $4 M
Project Type Size Annual Budget Renewable Energy Credit Price Cap Small ZRECs Up to 100 kW Approximately $2.7 M Weighted Average of the Medium ZREC price + 10%
6
re ve nue me te r a nd ha ve a de dic a te d RE C me te r
Gre e n Ba nk o r its pre de c e sso rs CE F I A o r the CCE F (o the r tha n lo w c o st fina nc ing )
Re ne wa b le Pro je c t (CT PURA a pplic a tio n a nd a ppro va l pro c e ss)
re q uire d)
7
P c o ve rs L RE C Pro je c ts a nd ZRE C Pro je c ts >100 kW
C Pro je c ts a re no t c o ve re d b y this RF P
C pro g ra m will c o mme nc e a fte r PURA de c isio n a ppro ving Ye a r 4 Me dium ZRE C c o ntra c ts & Ye a r 4 Sma ll ZRE C ra te s
15 ye a r c o ntra c ts to purc ha se the ZRE Cs a nd L RE Cs fro m se le c te d pro je c ts
e y Pro g ra m Do c ume nts:
P, Sta nda rd Co ntra c t, So lic ita tio n Pla n, PURA De c isio n – Do c ke t 11-12-06, Que stio n a nd Answe r Do c ume nt (upda te d pe rio dic a lly)
8
ACTION ITEM DATE
RELEASE OF RFP APRIL 30, 2015 BIDDERS CONFERENCE – WEBINAR ONLY MAY 15, 2015 DEADLINE FOR SUBMISSION OF QUESTIONS MAY 29, 2015 BID FORMS DUE JUNE 18, 2015 BY 1:00 P.M. (EASTERN PREVAILING TIME “EPT”), AT WHICH TIME THE PRICING
SHALL BECOME FIRM, IRREVOCABLE AND BINDING.
SELECTION AND NOTIFICATION OF WINNING BIDDERS ON OR ABOUT JULY 24, 2015 STANDARD CONTRACTS EXECUTION AFTER SELECTION AND NOTIFICATION OF WINNING BIDDERS. BIDDERS WILL HAVE TO
RETURN PARTIALLY EXECUTED CONTRACTS BY THE DATE ESTABLISHED BY THE COMPANIES WHICH IS EXPECTED TO BE APPROXIMATELY 10 BUSINESS DAYS.
STANDARD CONTRACT(S) FILED WITH PURA FOLLOWING SELECTION OF WINNING BIDDER(S)
AND EXECUTION OF STANDARD CONTRACTS DURING EACH ROUND.
COMMENCEMENT OF SERVICE IN ACCORDANCE WITH STANDARD CONTRACTS
9
C pric e c a p = $281.52
a c to rs
ixe d T ilt
ve rso urc e : Yo u ma y no lo ng e r e dit a Bid a fte r sub mitta l
10
RE Cs
g ra in pe r 100 sta nda rd c ub ic fe e t
re so urc e s, a s we ll a s a ll ze ro e missio n Cla ss I re so urc e s
Cs
11
T he c o ntra c t pric e o f RE Cs fro m Ze ro E missio n units is c a ppe d a t $302.71/ RE C
xa mple 1: 200 kW So la r Syste m ~ 311 RE Cs/ ye a r
C x 311 RE Cs/ ye a r ~$46,650
T he c o ntra c t pric e o f RE Cs fro m L
missio n units is c a ppe d a t $200/ RE C
xa mple 2: 400 kW F ue l Ce ll ~ 3,312 RE Cs/ ye a r
C x 3,312 ~ $264,960
E xa mple s sho w sa mple RE C pric e s. T he ma rke t will se t a c tua l RE C pric e s.
12
L a ura Stilwe ll, E ve rso urc e De na e Co rc o ra n, E ve rso urc e
13
14
ve rso urc e : www.e ve rso urc e .c o m, c lic k o n “Co mpe titive So lic ita tio n fo r L RE Cs & L a rg e / Me d ium ZRE Cs”, the n c lic k link to Sub mit L RE C/ ZRE C Bid
P fo r L RE Cs a nd ZRE Cs (April 24, 2014)
RE C/ ZRE C CT L ic e nse d Pro fe ssio na l E ng ine e r (PE ) Ce rtific a tio n (if a pplic a b le )
Gre e n Ba nk Gra nt a nd / o r Re b a te Disc lo sure Sta te me nt
Ma nufa c ture d , Re se a rc he d o r De ve lo pe d Affid a vits
he Co mpa nie s o nline Bidding syste ms will a c kno wle dg e re c e ipt o f Bid a nd pro vide yo u with a n individua l Bid I D.
15
a nd/ o r Disc lo sure s a s a pplic a b le ) will b e re q uire d to b e sub mitte d a s pa rt o f the b id pro c e ss
whic h ma y inva lida te the Bid F
16
e le c tro nic a lly
a nd/ o r Disc lo sure s a s a pplic a b le ) will b e re q uire d to b e sub mitte d via e ma il in a dditio n to the a pplic a tio n
D numb e rs in fo rms
whic h ma y inva lida te the Bid F
17
nstruc tio ns
sub mitting a pro po sa l (“Bid”)
de fine d a s the le g a l e ntity de siring to e nte r into a Sta nda rd Co ntra c t
de fine d a s the le g a l o wne r o f the pro je c t site (No ta rize d a ffida vit)
18
wo a ffida vits re q uire d (if se e king M/ R/ D de sig na tio n):
Ma nufa c ture d, Re se a rc he d
e c hno lo g ie s
Ge ne ra tio n T e c hno lo g y to b e use d b y its’ pro je c t.
e c hno lo g y supplie r’ s a ffida vit tha t it supplie s CT Ma nufa c ture d, Re se a rc he d o r De ve lo pe d Ge ne ra tio n T e c hno lo g ie s
P
19
RE C/ ZRE C CT L ic e nse d Pro fe ssio na l E ng ine e r (PE ) Ce rtific a tio n
Ce rtific a tio n o nly re q uire d if:
de fine d in the I RP
20
Y Co mple te d Bids re c e ive d will b e re vie we d to e nsure e lig ib ility
lig ib le b ids will b e ra nke d b y e va lua te d b id pric e in e a c h o f the thre e c a te g o rie s
e xha uste d in e a c h c a te g o ry
lig ib le b ids no t se le c te d will b e pla c e d o n sta ndb y
21
22
xe c ute d Sta nda rd Co ntra c t & Pro vide Pe rfo rma nc e Assura nc e
Co ntra c t
the E ffe c tive Da te o f Sta nda rd Co ntra c t, o r pro je c t is disq ua lifie d
E ffe c tive Da te o f Sta nda rd Co ntra c t, o r it a uto ma tic a lly te rmina te s
She e t o f the Sta nda rd Co ntra c t (Se c tio n 9.1)
23
L g / L RE C]
xa mple 1: 175 kW so la r PV (Me d ZRE C) pro je c t
Cs x $120.00/ RE C x 10% = $3,276.00
xa mple 2: 600 kW so la r PV (L g ZRE C) pro je c t
Cs x $90.00/ RE C x 20% = $16,794.00
xa mple 3: 1 MW fue l c e ll (L RE C) pro je c t
Cs x $50.00 x 20% = $82,790.00
24
to suc c e ssfully pro vide Pe rfo rma nc e Assura nc e po ste d o n the ir we b site s
tha n Wire T ra nsfe rs. Ple a se pla n a c c o rding ly fo r re c e ipt b y Co mpa ny o n
a c c e pte d)
e tte r o f Cre dit
25
Step 3 Post-Execution Obligations: How to get from a contract to commercial operation
26
(Also refer to Section 4 of the Standard Contract)
RE C De live ry Ac c e pta nc e (inc lude s ite ms liste d b e lo w)
n se rvic e no la te r tha n 1 ye a r a fte r se le c te d De live ry T e rm Sta rt Da te (1/ 1/ 16, 4/ 1/ 16, 7/ 1/ 16, 10/ 1/ 16)
nte rc o nne c tio n a g re e me nt re q uire d (to b e disc usse d la te r)
POOL GI S re g istra tio n
Cla ss I Qua lific a tio n Appro va l fro m PURA
C me te r (to b e disc usse d la te r)
27
&C’ s = it is the Se lle r’ s so le
PURA Cla ss I Qua lific a tio n
PURA rule s re q uire yo u sub mit a se pa ra te a pplic a tion to PURA fo r CT Cla ss I Qua lific a tio n a fte r yo ur pro je c t re c e ive s a fina l a ppro va l to e ne rg ize
Cla ss I Qua lific a tio n Applic a tio n
PURA will re vie w Cla ss I a pplic a tio n, a nd upo n a ppro va l, will g ra nt CT Cla ss I Qua lific a tio n
ina l PURA De c isio n must b e pro vide d b y Se lle r to :
POOL GI S
28
S a c c o unt o r o utso urc e GI S se t up a nd ma inte na nc e
hird Pa rty Me te r Re a de r
ve rso urc e : “CL &P L RE C ZRE C”
RE CZRE C”
nitia te F
ra nsfe r (F CT ) o f RE Cs Qua rte rly in GI S
S rule s a re a va ila b le fro m NE POOL GI S (APX)
POOL GI S we b site – www.ne po o lg is.c o m
29
f se lle r do e s no t c o mple te the se ste ps:
30
Step 4 Contract Administration: The 15 year Delivery Term
31
Cs de live re d
C Me te r Da ta
POOL GI S RE C tra nsfe rs c o nstitute de live ry
ra nsfe r
b e fo re the la st da y o f the mo nth fo llo wing re c e ipt
Cs b y Co mpa ny via NE POOL GI S
32
Utility Me te r Re a ding Utility’ s L RE C/ ZRE C Ac c o unt Se lle r’ s Ac c o unt RE Cs Cre a te d Se lle r Utility Se ttle me nt & Ve rific a tio n
$
RE Cs via F CT
33
ra nsfe r o f RE Cs in GI S
ro m Se lle r’ s a c c o unt to the Utility’ s L RE C/ ZRE C a c c o unt
C pro duc tio n, tra nsfe r a nd pa yme nt
Energy Generation Quarter REC Meter Read Upload Deadline
(Meter Data Uploaded by CL&P as the Third Party Meter Reader)
RECs Created Date Payment Date
(assuming RECs have been transferred to the LREC.ZREC account)
Q1 (Jan/Feb/Mar) July 10 July 15 By August 31st Q2 (Apr/May/Jun) October 10 October 15 By November 30th Q3 (Jul/Aug/Sep) January 10 January 15 By February 28th Q4 (Oct/Nov/Dec) April 10 April 15 By May 31st
34
Ag re e me nt Pro visio ns is pe rmitte d
xc e ss RE C o ptio ns
Cs to me e t ne xt ye a r’ s MAQ
xc e ss RE Cs ma y b e so ld to BUYE R with b o th pa rtie s’ c o nse nt
35
ve rso urc e = L RE C.ZRE C@ e ve rso urc e .c o m
= lre c .zre c @ uine t.c o m
RE C/ ZRE C We b site s a t:
ve rso urc e = www.e ve rso urc e .c o m
= www.uine t.c o m/ po we rpro c ure me nt
36
Jo se ph De b s, E ve rso urc e Ro b e rt Ma nning , UI
37
le sso ns le a rne d
ve rso urc e & UI fo llo w the sa me pro c e ss a nd te c hnic a l g uide line s
Autho rity (PURA)
e de ral E ne rg y Re g ulato ry Co mmissio n (F E RC) Small Ge ne rato r I nte rc o nne c tio n Pro c e ss (SGI P) mo de l
38
Distrib utio n Syste m
inte rc o nne c tio ns
39
a st T ra c k Pro c e ss: < 2 MW
40
Process Rating Time (Business
Days)
Application Fees Witness Test Fee Liability Insurance
Inverter Based 0-10 kw 15 $100 1st Test $300,000
41
COMPLETENESS OF APPLICATION RECEIVED CONTINGENT APPROVAL NOTIFICATION SCHEDULE WITNESS AND TEST AND INSTALL NET METER APPROVAL TO ENERGIZE 10 BUSINESS DAYS 15 BUSINESS DAYS FROM COMPLETE APPLICATION 10 BUSINESS DAYS FROM TOWN INSPECTION APPROVAL
APPROXIMATE 30 BUSINESS DAY APPROVAL PROCESS
APPLICATION RECEIPT NOTIFICATION 3 BUSINESS DAYS Submit Application
Additional Paper Work
42
43
a st T ra c k re q uire me nts ma y re q uire a dditio na l studie s
SO-NE no tific a tio n fo rm fo r pro je c ts >1MW
nte rc o nne c tio n a g re e me nt re q uire d
Process Rating Time (Business Days) Application Fees Witness Test Fee Liability Insurance Fast Track 0-2 MW 15 $500 Cost Based $300,000 to $2,000,000
44
COMPLETENESS OF APPLICATION RECEIVED CONTINGENT APPROVAL INSTALLATION & WITNESS TEST APPROVAL TO ENERGIZE 10 BUSINESS DAYS 15 BUSINESS DAYS FROM COMPLETE APPLICATION 10 BUSINESS DAYS FROM TOWN INSPECTION APPROVAL APPLICATION RECEIPT NOTIFICATION 3 BUSINESS DAYS Interconnection Agreement (IA)
Submit Application - The Application, One Line diagram, Layout Diagram, Proof of Insurance, Inverter Data sheet, $500 Application Fee Additional Deliverables - Interconnection Agreement, Test Plan, Inspector’s Approval, Witness Test, Net Meter Installation
45
SO-NE tra nsmissio n impa c t studie s re q uire d fo r pro je c ts >=5MW
nte rc o nne c tio n a g re e me nt re q uire d
Process Rating Application Fees Witness Test Fee Liability Insurance Study 1) >2 MW and <20 MW 2) ≤ 2 MW and not certified. 3) ≤ 2 MW, certified, failed Fast Track $1000 Cost Based Generator Size Dependent
46
APPLICATION REVIEW FEASIBILITY STUDY IMPACT STUDY FACILITY STUDY CONSTRUCTION & WITNESS TEST JURISDICTION DETERMINATION
Submit Application - The Application, One Line diagram, Layout Diagram, Proof of Insurance, Generator Data Sheet, $1,000 Application Fee
30 BUSINESS DAYS 15 BUSINESS DAYS 30 BUSINESS DAYS 30 BUSINESS DAYS
APPROVAL TO ENERGIZE
Additional Deliverables - Interconnection Agreement, Test Plan, Inspector’s Approval, Witness Test, Net Meter Installation
IA 47
nsura nc e
e c hnic a l Da ta She e ts
hird pa rty o wne rship o f g e ne ra to r
48
e c hnic al
xhib it B o f the Guide line s
le c tric a l One -L ine dia g ra m with sta nda rd symb o ls a nd la b e ls
ime ly c o mmunic a tio n a nd da ta tra nsfe r
49
Guidelines for Generator Interconnection
50
F
nte rc o nne c tio n Que stio ns ple a se c o nta c t: E ve rso urc e : distrib ute d_re so urc e s@ e ve rso urc e .c o m UI : g e ne ra to r.c o nne c tio n@ uine t.c o m
51
Vinc e nt O’ Co nne lll, E ve rso urc e Ga ry Zie la nski, UI
52
a c ilitie s will purc ha se a nd insta ll the ir o wn me te r a s spe c ifie d within the E ve rso urc e RE C Me te r Spe c ific a tio ns a s we ll a s the L ist o f Ac c e pta b le Me te rs. Bo th c a n b e fo und with the L RE C/ ZRE C Suppo rting Do c ume nts a t www.e ve rso urc e .c o m:
pro je c t
f we c a nno t c o mmunic a te with the me te r the c usto me r is re q uire d to re so lve the c o mmunic a tio ns issue s
ve rso urc e Me te r E ng ine e ring g ro up
ve rso urc e will a ssist pro c ure me nt b y pro viding o rde ring a nd ve ndo r c o nta c t info rma tio n
53
54
F ac ility Size Me te r Gr
L e ve l 1
0.0<20.0kW A,B
L e ve l 2
>=20.0 to <50 kW A,B
L e ve l 3
>=50.0 to <100 kW A,B
L e ve l 4a
>=100 kW to <500 kW A,B
L e ve l 4b
>=500 kW to 2,000 kW B
F
Ma nufa c ture r/ Mode l NU Produc t Ke y Cla ss Communic a tions
Gr
Ce ntro n 3 E RT
CxSL ZRE C *20/ 200/ 320 Hig h po we re d E RT
2S,*3S,*4S,12S, 16SL +G with Me trum F
*20/ 200/ 320 Ce ll
*9S, 16S
Itro n/ L +G with Me trum Va rie s *20/ 200/ 320 Ce ll
*5S, *9S, 16S
Itro n Va rie s *20/ 200/ 320 Mo de m
Gr
**Pa ne l mount
Io n/ 7330
Pro vide d during re vie w
10 E the rne t, Mo de m
**9S/ F lush mount
ION8650 A,B,C mo de ls Pro vide during re vie w 20 E the rne t, Mo de m
* Instr ume nt r a te d for m type s (CT ’s a nd/ or VT ’s r e quir e d) ** Othe r for ms ma y be a va ila ble upon r e que st
Me te r type s, ma nufa c ture rs, a nd c o mmunic a tio n type s a re sub je c t to c ha ng e . All Gro up A me te rs a re pro vide d b y the Co mpa ny, Gro up B me te rs will re q uire o rde ring info rma tio n pro vide d b y Me te r E ng ine e ring .
he thre e line dra wing sho uld c le a rly sho w a se lf-c o nta ine d me te r so c ke t wire d in a to p do wn c o nfig ura tio n – the to p o r line side “ja ws” sho uld b e wire d to the g e ne ra to r a nd the b o tto m o r lo a d side ja ws sho uld b e wire d to the c usto me rs lo a d.
nstrume nt T ra nsfo rme r Ra te d Me te ring
po la rity ma rks sho uld b e fa c ing a wa y fro m the g e ne ra to r, po inting to wa rds the c usto me r’ s lo a d a nd the E ve rso urc e re ve nue me te r.
55
C me te r is insta lle d a nd g e ne ra ting , the pro je c t re pre se nta tive must se nd a n e ma il to no tify Me te r E ng ine e ring (Me te rE ng ine e ring @ nu.c o m)
C me te rs utilizing E
RT
(Va n Drive -By) c o mmunic a tio n T e c hno lo g y, the Distrib ute d Re so urc e s pro je c t ma na g e r will pro vide a n “L / Z RE C Me te r Va lida tio n F
se nt to Me te r E ng ine e ring .
C me te rs using Ce llula r, Mode m or E
the rne t
c o mmunic a tio ns, the pro je c t re pre se nta tive o nly ne e ds to no tify Me te r E ng ine e ring tha t the RE C me te r is insta lle d a nd g e ne ra ting .
pro je c t in the sub je c t he a de r.
56
Guide b o o k o f Re q uire me nts fo r E le c tric Se rvic e ”.
I nte rc o nne c tio n”.
nsta lla tio ns sha ll me e t pub lishe d re q uire me nts fo r a c c e ssib ility a nd lo c a tio n.
57
will o wn, insta ll, re a d a nd ma inta in a ll me te rs a nd me te ring tra nsfo rme rs within its se rvic e te rrito ry.
a ppro ve d me te r pro visio ns a nd, if ne e de d, instrume nt tra nsfo rme r c a b ine ts.
L RE C/ ZRE C Me te ring Re q uire me nts do c ume nt lo c a te d o n UI L RE C/ ZRE C we b pa g e .
58
ma de b y UI sta ff during e a rly de sig n me e ting s with insta lle rs.
f the c usto me r pa rtic ipa te s in Ne t E ne rg y Ride r, a dditio na l me te ring ma y b e re q uire d
59
RE C/ ZRE C me te rs will b e lo c a te d a fte r a ny inve rte rs a nd b e fo re a ny lo a d
c ha rg e r) must b e lo c a te d b e twe e n the g e ne ra to r a nd the inve rte r
nsta lla tio ns with po we r sto ra g e e q uipme nt will b e ne t e ne rg y me a sure d
60
c usto me rs, inc luding Ne t E ne rg y, pursua nt to c usto me r’ s ta riff
will pro vide mo nthly L RE C/ ZRE C me te r da ta to NE POOL GI S fo r de te rmina tio n o f RE Cs g e ne ra te d
61
(Net Metering/Virtual Net Metering)
Ma rk Co lc a , UI Jim Mie rze je wski, E ve rso urc e
62
E le c tric distrib utio n c o mpa ny c usto me rs ho sting a distrib ute d g e ne ra tio n (DG) pro je c t re c e ive e le c tric se rvic e unde r a n a pplic a b le g e ne ra l se rvic e ra te a nd ma y b e e lig ib le fo r a numb e r o f ra te o ptio ns:
ne rg y Billing
63
(“Net Metering”)
T wo Ne t E ne rg y Billing Ride rs 1. Cla ss I Re ne wa b le E ne rg y a nd Hydro po we r Re so urc e s 2. Qua lifying F a c ilitie s a nd No n-Cla ss I Re ne wa b le Re so urc e s
1. Custo me rs with Cla ss I re ne wa b le e ne rg y o r hydro po we r re so urc e s
(kilo wa tt-ho urs o r kWh) pe rfo rme d mo nthly
ve rso urc e : “Ride r N – Cla ss I Re ne wa b le o r Hydro e le c tric ”
: “Cla ss I Re ne wa b le E ne rg y Ride r NE C1” (Ride r NE C1)
64
(Continued)
s with Cla ss I r e ne wa ble e ne r g y or hydr
r e sour c e s (c ontinue d)
Additio nal De tails
Ma rc h)
CT Zo ne re a l-time lo c a tio na l ma rg ina l pric e (“L MP”) o f tha t pe rio d
MP (a ll ho urs b e twe e n 10a m a nd 4pm)
MP (a ll ho urs)
65
(Continued)
2. Qualifying F ac ilitie s and Non- Class I Re ne wable Re sour c e s
a c ilitie s
Re ne wa b le Re so urc e s
e xc e ss e ne rg y de live re d to E DC o n a mo nthly b a sis
ve rso urc e : “Ride r N – No n-Cla ss I Re ne wa b le a nd QF ”
: “Distrib ute d Ge ne ra tio n F a c ility Ne t E ne rg y Ride r NE ” (Ride r NE )
66
E le c tr ic DG Ride r
firm se rvic e ra te tha t inc lude s a distrib utio n de ma nd ra tc he t
ve rso urc e : Distrib ute d Ge ne ra tio n Ride r
: Ride r DG
Gas DG De live r y Re bate Ride r
c usto me r’ s DG syste m
67
Implementing Changes from PA 13-298
he Virtua l Ne t Me te ring (VNM) Ride r pro g ra m ha s b e e n e xpa nde d to inc lude Ag ric ultura l, Munic ipa l a nd Sta te c usto me rs (Pub lic Ac t 13-298)
ina l De c isio n unde r Do c ke t No . 13-08-14 issue d July 21, 2014
DC VNM Ride rs sub mitte d a nd Applic a tio ns po ste d o n we b site s
ina l De c isio n unde r Do c ke t No . 13-08-14RE 01 issue d De c e mb e r 17, 2014
fa c ilitie s
sta b lishe d c a lc ula tio n o f VNM c re dits fo r a ll Custo me r Ho st fa c ilitie s
68
a c ilitie s up to 3 MW Cla ss I (a ll) o r Cla ss I I I (Munic ipa l & Sta te )
c o ntra c tua l a rra ng e me nt fo r re c e ipt o f po we r fro m VNM fa c ility
xc e ss kWh o f Ho st) x (SS o r L RS + % T & D ra te s o f Custo me r Ho st)
a c ilitie s Co nne c te d to Mic ro g rid
RS + % T &D ra te s
Ho st a c c o unt
re la te d a c c o unts 69
Virtual Net Metering Program Features and Implementation (continued)
he ma ximum, a g g re g a te d a nnua l c o mpe nsa tio n to a ll c usto me rs und e r the VNM pro g ra m is $2 millio n fo r UI a nd $8 millio n fo r E ve rso urc e
ve rso urc e : $3.2 M) pe r c la ssific a tio n (i.e ., a g ric ultura l, munic ipa l a nd sta te se c to rs)
a c c e pta nc e (se e Applic a tio n Pro c e ss)
ne t e ne rg y b illing c o ntinue s a nd a ll e xc e ss kWh pro d uc e d is c o mpe nsa te d und e r the a pplic a b le po we r purc ha se ra te fo r the re ma ind e r o f the ye a r
wo -sta g e q ue uing pro c e ss
a pplic a tio n
a ssig nme nt o f a nnua l c a p a nd pla c e s VNM Custo me r Ho st into se c o nd - sta g e q ue ue
c usto me r VNM c re d it c a ps
70
lo ng -te rm e le c tric purc ha se a g re e me nt
DC
ne rg y (kWh) o nly
SO-NE CT Zo ne Re a l-T ime L MP
ve rso urc e : Ra te 980
: Po we r purc ha se d a t SG2 ra te (e ne rg y c o mpo ne nt o f L MP o nly)
71
RE C.ZRE C@ e ve rso urc e .c o m
q ue stio ns will b e a ddre sse d.
to a ll we b ina r pa rtic ipa nts.
e y Do c ume nts:
e rms a nd Co nditio ns (E ve rso urc e )
e rms a nd Co nditio ns (UI )
(E ve rso urc e )
RE C/ ZRE C Pro g ra m
72