LOWER KINNAUR (SATLUJ BASIN) ZONE ON 2.8.2012. INJECTION POINTS - PowerPoint PPT Presentation

TRANSMISSION PLAN FOR LOWER KINNAUR (SATLUJ BASIN) ZONE ON 2.8.2012. INJECTION POINTS OF HPSEBL / HPPTCL-TOTAL SMALL.xls Sr.N Interfacing S/S Injection (MW) LINK 1 66/22 kV Nogli 45 66_22kvNogli.xls 2 22 kV Nirth 7 22KV_Nirth.xls 3


  1. TRANSMISSION PLAN FOR LOWER KINNAUR (SATLUJ BASIN) ZONE ON 2.8.2012.

  2. INJECTION POINTS OF HPSEBL / HPPTCL-TOTAL SMALL.xls Sr.N Interfacing S/S Injection (MW) LINK 1 66/22 kV Nogli 45 66_22kvNogli.xls 2 22 kV Nirth 7 22KV_Nirth.xls 3 22 kV Chaba Power House 3 66-22 kv CHABA.xls 4 66/22 kV Gumma Sub station 2.6 66-22 kv Guma.xls 5 66/22 kV Ani 34.3 22-66kV Ani.xls 6 66/22 kV Nirmand (Bagipul) 50 66_22kv_Nirmand.xls 7 220/66/22 kV Kotla 30.6 22-66-220KV Kotla.xls 8 66 kV Ghanvi-II Switchyard 78 66V Ghanvi-II.xls 9 22 kV Jhakri Control Point 14 22 kv Jhakri.xls 10 66/22 kV Nathpa 28 66-22KV_NATHPA.xls 11 66/220 kV Wangtoo_Bhaba Khad 67 Bhaba Khad.xls 12 33/132 kV Kangoo 14 33 kv Kangoo.xls 13 66 kV P.S of IPPs at Kut 67.5 66kv_kut.xls 14 22 KV Pangna 9.3 22KV_PANGNA.xls 15 22 kV Sunni 2 22KV_SUNI.xls 16 66 kV Ghanvi-I 22.5 478

  3. 66 KV POST-2015 SCENARIO 220 KV 400 KV IPP’S 66 KV P.S. BARAKHAMBA-25 MW AT HOMTE 68 MW- 66V Ghanvi-II.xls 19 MW- 66kv_kut.xls 67 MW- Bhaba IPP’S 33/66 KV Khad.xls P.S. AT NANTI KUT-24 MW 2X34 MW 45 MW- 66kv_Urni.xls 45 MW 66 MW GHANVI-II-10 MW-66V 122 MW FROM URNI BHABA- Ghanvi-II.xls 120 MW 23 MW GHANVI-I-22.5 MW 2X39 MW 66 KV FROM 96 MW NATHPA 8 MW KASHANG 295 MW- 2X61 MW 31.9 MW- 66- 2x153 MW 220kv_Kashang.x 50 MW- 66_22kv_Nirmand.xls 22KV_NATHPA.xls ls 66/220/400 KV WANGTOO- 22/66/220 KV 22 MW KOTLA- KARCHAM 5 MW WANGTOO- 30.5 MW- 22-66- 1565 MW 1000 MW 220KV Kotla.xls 95 MW 147 MW TO ABDULLAPUR TO KUNIHAR

  4. POST 2015 SCENARIO 66 KV 132 KV 400 KV 30.6 MW- 22-66-220KV Kotla.xls 22/66/220 KV KOTLA- 5 MW 22/66 KV NOGLI 43 MW- 66_22kvNogli.xls 34.3 MW- 22-66kV Ani.xls 1 MW 37 MW 8 MW 22/66 KV ANI 22/66 KV KUMARSAIN 22 MW 7 MW- 66- 22/66 KV GUMA 22KV_KUmarsain.xls 43 MW 22/66 KV 35 MW 10 MW ANDHRA 22/66 KV SAMOLI 2X17 MW 60 MW 5 MW 66/132 KV JUTOG To SUNDA TO KUNIHAR

  5. PRE 2015 SCENARIO 66 KV 220 KV 1 CKT. OF 220 KASHANG-BHABA LINE CHARGED AT 22 KV AND 400 KV TERMINATED AT NATHPA S/S 5 MW- 66kv_kut.xls 24 MW- 66V Ghanvi-II.xls 67 MW- Bhaba IPP’S 66 KV P.S. Khad.xls AT HOMTE 9 MW- 66kv_kut.xls IPP’S 33/66 KV P.S. AT NANTI KUT-24 MW 70 MW 2X12 MW BHABA-120 MW 22/66 /220KV 34 MW GHANVI-II-10 MW-66V BHOKTOO-8 MW Ghanvi-II.xls 2X17 MW GHANVI-I-22.5 MW 5 MW FROM 66 KV KASHANG-65 2X44 MW 117 MW NATHPA MW 22/66/220 KV KOTLA- 17 MW 23 MW- 66- 33 MW 22KV_NATHPA.xls KARCHAM 14 MW- 22-66-220KV Kotla.xls WANGTOO- 117 MW 1000 MW 203 MW TO ABDULLAPUR TO KUNIHAR

  6. PRE 2015 SCENARIO 66 KV 132 KV 1 CKT. OF 220 KASHANG-BHABA LINE CHARGED AT 22 KV AND 400 KV TERMINATED AT NATHPA S/S 14 MW- 22-66-220KV Kotla.xls 22/66/220 KV KOTLA- 14 MW 22/66 KV NOGLI 12.4 MW- 66_22kvNogli.xls 14 MW- 22-66kV Ani.xls 23 MW 25 MW 22/66 KV ANI 22/66 KV KUMARSAIN 22 MW 22/66 KV GUMA 36 MW 22 MW 23 MW 10 MW 22/66 KV 22/66 KV SAMOLI ANDHRA 2X11 MW 5 MW 66/132 KV JUTOG TO KUNIHAR

  7. TO KOTLA 22 KV 66 KV TO KUMARSAIN

  8. 22KV_PANGNA.xls 22KV_SUNI.xls

  9. 22-66kV Ani.xls LOCAL 66 KV GUMMA- KUMARSAIN LINE

  10. 66-22 kv CHABA.xls 66-22 kv Guma.xls

  11. Works_Kotla.xls 22 KV 33 KV 9 MW 66 KV 33 KV 66 KV FROM NATHPA 66 KV 22 KV 22 KV

  12. Works_Nirmand.xls 66_22kv_Nirmand.xls TO KOTLA

  13. 66-22KV_NATHPA.xls 22 V 66 V TO KOTLA (JEORI) 22 V IPP HPSEBL

  14. 22 KV 66 KV D/C 22 KV BHABA-120 MW TO KOTLA VIA GANVI 66 KV 220 KV D/C TO JHAKRI FROM KASHANG VIA BHOKTOO 66 KV D/C 220 KV D/C 400 KV D/C 22 KV TO KUNIHAR VIA KOTLA TO ABDULLAPUR (ISTS) 400 KV D/C 66 KV

  15. Works_Wangtoo.xls Bhaba Khad.xls 66 KV IPP HPPTCL ISTS 66 KV 66 KV 400 KV FROM SHONGTONG KARCHAM FROM KASHANG 220 KV 220 KV TO KUNIHAR 66 KV FROM URNI TO N-R 400 KV TO ABDULLAPUR

  16. EVACU VACUAT ATION ARRAN ARRANGEMENT FO FOR R PARVAT ARVATI VALLE VALLEY P Y PRO ROJE JECT CTS T TILL 2016 LL 2016 LINE) (CO COD D OF 132 K F 132 KV V BARS BARSAI AINI-CH CHARO AROR R LI ALT ALT-I: : AU AUG. . OF F CO CONDS DS. . BE BETWE WEEN BARS BARSAI AINI AN AND D MALAN ALANA-I 2X18 MW 33 KV BARSAINI BRAMGANGA-5 MW 33 /132 KV MALANA-I- 105 MW 39 MW- 33KV Barsaini.xls 33 KV BARSAINI 33 KV JARI 2X69 MW 22 MW- 33 KV Kullu.xls 13 MW 10 MW- 33_KV Jari.xls 33 /132 KV BAJAURA 87 MW 89 MW LARJI-126 MW 42 MW 33/132 KV PANDOH- 6.5 MW- 33_132KV Pandoh.xls 47 MW 132/220 KV KANGOO 33/132 KV BIJNI 16 MW

  17. EVACU VACUAT ATION ARRAN ARRANGEMENT FO FOR P R PARVAT ARVATI VALLE VALLEY Y PRO ROJE JECT CTS TILL 2016 LL 2016 LINE) (CO COD D OF 1 F 132 32 KV V BA BARS RSAIN AINI-CH CHAR AROR R LIN ALT ALT-2: 2: E EVACU VACUAT ATION OF F POWE WER O R OF F BALARG BALARGA A HEP T THRO ROUGH 33 K 33 KV V LI LINE OF F BRAM BRAMGAN ANGA A HEP 2X14 MW 33 KV BARSAINI BRAMGANGA-9+5 MW 33 /132 KV MALANA-I- 105 MW 30 MW- 33KV Barsaini.xls 33 KV BARSAINI 33 KV JARI 2X69 MW 22 MW- 33 KV Kullu.xls 13 MW 10 MW- 33_KV Jari.xls 33 /132 KV BAJAURA 87 MW 89 MW LARJI-126 MW 42 MW 33/132 KV PANDOH-6.5 MW 47 MW 132/220 KV KANGOO 33/132 KV BIJNI 16 MW

  18. ALT: SYSTEM STRENGTHENING OF 33 KV 33 KV LINES 132 KV 220 KV 27 MW-33KV_GAJ.xls TO ISTS 35 MW- 33 kv_shahpur.xls 20. MW-33KV_Sidhpur.xls 33 KV 20 MW 33 KV 130 MW GAJ 0 MW 33 KV SHAHPUR 41 MW SIDHPUR 0MW 33/132/220 KV 34 MW- 33KV_Baner.xls JASSORE 26 MW 10 MW 6 MW 33 KV 33/132 KV 33/132 KV BANER CHAMBI KANGRA 0 MW 2X63 MW 0 MW 33/132 KV DEHAN 25 MW- 33KV_Baijnath.xls 48 MW 0 MW 50 MW 33 KV 52 MW- 33-132KV_Dehan.xls BAIJNATH 96 MW 12+9 MW 49 MW 67 MW 66+25=91 MW-33- DHAULASIDH 132KV_Bassi.xls 132 KV -66 MW 33/132 KV BASSI DEHRA 132 KV AMB 78 MW 2 MW 2X40 MW 18 MW 132 KV UHL-III-100 132/220 KV MW MATTANSIDH 2X86 MW TO ISTS 2X114 MW

  19. ALT: SYSTEM STRENGTHENING OF 33 KV 33 KV LINES 132 KV 220 KV 27 MW-33KV_GAJ.xls TO ISTS 35 MW- 33 kv_shahpur.xls 33 KV GAJ 20. MW-33KV_Sidhpur.xls 20 MW 33 KV 130 MW 0 MW 33 KV SHAHPUR 41 MW SIDHPUR 0MW 33/132/220 KV 34 MW- 33KV_Baner.xls JASSORE 26 MW 10 MW 6 MW 33 KV 33/132 KV 33/132 KV BANER CHAMBI KANGRA 0 MW 2X63 MW 0 MW 33/132 KV DEHAN 25 MW- 33KV_Baijnath.xls 48 MW 0 MW 50 MW 33 KV 52 MW- 33-132KV_Dehan.xls BAIJNATH 96 MW 12+9 MW 49 MW 67 MW 66+25=91 MW-33- DHAULASIDH 132KV_Bassi.xls 132 KV -66 MW 33/132 KV BASSI DEHRA 132 KV AMB 85 MW 2 MW 72 MW 18 MW 132 KV 132/220 KV UHL-III-100 MATTANSIDH MW 2X83 MW TO ISTS 2X114 MW

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.