UNIVERSITY OF CALIFORNIA
Timon Heim - LBL
Los Alamos Irradiation Readiness
Instrumentation Meeting - 29 Jan 2016
1
Los Alamos Irradiation Readiness Instrumentation Meeting - 29 Jan - - PowerPoint PPT Presentation
Los Alamos Irradiation Readiness Instrumentation Meeting - 29 Jan 2016 Timon Heim - LBL UNIVERSITY OF 1 CALIFORNIA Plan Irradiate 6 FE65_P2 chips to 150, 350 and 500 Mrad 4 chips in the beam at the same time Chips powered and
UNIVERSITY OF CALIFORNIA
Timon Heim - LBL
Instrumentation Meeting - 29 Jan 2016
1
Timon Heim 2 Instrumentation Meeting
beam at the same time
up to 500 Mrad
Timon Heim 3 Instrumentation Meeting
Slot 2 Ch Power Supply SCC
Irrad Board:
40 MHz Osc Level Shifter Iref generation
CLK DATA CLK CNFG CLK BX Iref VDDA VDDD 1.2 V 3.3 V
6 x Lemo
1 x 4 pin Molex
2 Ch Power Supply Source Meter Computer
GPIB USB USB USB to CAT5 Cave CR
Timon Heim 4 Instrumentation Meeting
Slot 2 Ch Power Supply SCC
Irrad Board:
40 MHz Osc Level Shifter Iref generation
CLK DATA CLK CNFG CLK BX Iref VDDA VDDD 1.2 V 3.3 V
6 x Lemo
1 x 4 pin Molex
2 Ch Power Supply Source Meter Computer
GPIB USB USB USB to CAT5 Cave CR
Timon Heim 5 Instrumentation Meeting
Slot 2 Ch Power Supply SCC
Irrad Board:
40 MHz Osc Level Shifter Iref generation
CLK DATA CLK CNFG CLK BX Iref VDDA VDDD 1.2 V 3.3 V
6 x Lemo
1 x 4 pin Molex
2 Ch Power Supply Source Meter Computer
GPIB USB USB USB to CAT5 Cave CR
Timon Heim 6 Instrumentation Meeting
Slot 2 Ch Power Supply SCC
Irrad Board:
40 MHz Osc Level Shifter Iref generation
CLK DATA CLK CNFG CLK BX Iref VDDA VDDD 1.2 V 3.3 V
6 x Lemo
1 x 4 pin Molex
2 Ch Power Supply Source Meter Computer
GPIB USB USB USB to CAT5 Cave CR
Timon Heim 7 Meeting Name
FEAST
1 Ohm Load High Quality Breakout