Local Planning Panel 22 July 2020 327-329 George Street, Sydney D/2019/1277 Mr Giovanni Cirillo, Planning Lab Ledorli Holdings Pty Ltd Architect/Designer/Consultants proposal demolition of existing building and construction of 15 storey


slide-1
SLIDE 1

Local Planning Panel 22 July 2020

327-329 George Street, Sydney D/2019/1277 Mr Giovanni Cirillo, Planning Lab Ledorli Holdings Pty Ltd Architect/Designer/Consultants

slide-2
SLIDE 2

proposal recommendation

approve subject to conditions demolition of existing building and construction of 15 storey building comprising ground floor retail premises with office premises above, basement and loading dock accessed from Wynyard Lane Zone: B8 - the development is permissible with consent

slide-3
SLIDE 3

notification information

  • exhibition period 5 December 2019 to 16 January 2020
  • 177 owners and occupiers notified
  • 1 submission received
slide-4
SLIDE 4

submissions

  • waiver of a competitive design process
  • Clause 4.6 variation request inadequate
  • construction traffic management
  • impacts to adjoining properties
slide-5
SLIDE 5

subject site submitters

submissions

slide-6
SLIDE 6

site

slide-7
SLIDE 7

George Street

slide-8
SLIDE 8

George Street looking south

slide-9
SLIDE 9

George Street looking south

slide-10
SLIDE 10

George Street looking south

slide-11
SLIDE 11

George Street looking north from Martin Place

slide-12
SLIDE 12

George Street - street level

slide-13
SLIDE 13

333 George Street and subject site - George Street

slide-14
SLIDE 14

333 George Street adjacent to site

slide-15
SLIDE 15

Wynyard Lane looking north

slide-16
SLIDE 16

Wynyard Lane looking north

slide-17
SLIDE 17

site viewed from Wynyard Lane

slide-18
SLIDE 18

Wynyard Lane looking south

slide-19
SLIDE 19

Wynyard Lane looking south

slide-20
SLIDE 20

proposal

George Street Wynyard Lane

slide-21
SLIDE 21

basement levels

slide-22
SLIDE 22

ground level floor plan

slide-23
SLIDE 23

level 1 floor plan

slide-24
SLIDE 24

level 2 floor plan

slide-25
SLIDE 25

Levels 3 -12 typical floor plan

slide-26
SLIDE 26

Levels 3 -12 typical floor plan

slide-27
SLIDE 27

Level 14 floor plan

slide-28
SLIDE 28

Level 15 roof /plant level

slide-29
SLIDE 29

George Street (east) elevation

slide-30
SLIDE 30

Wynyard Lane (west) elevation

slide-31
SLIDE 31

south elevation

slide-32
SLIDE 32

north elevation

slide-33
SLIDE 33

section (west-east)

slide-34
SLIDE 34

section - George Street

slide-35
SLIDE 35

section - George Street – level 14

slide-36
SLIDE 36

George Street elevation - detail

slide-37
SLIDE 37

compliance with key LEP standards

control proposed compliance

height 130m 56.68m yes floor space ratio 12.73:1 10.97:1 yes

slide-38
SLIDE 38

38

compliance with DCP controls

control proposed compliance

awning height 3.2 - 4.2m 4.9m no bicycle spaces 19 staff 11 visitor 20 staff 12 visitor yes service vehicle spaces 1 1 yes

slide-39
SLIDE 39

39

compliance with DCP controls

control proposed compliance

floor to floor height 4.5m basement 4.5m ground & first floor 3.5m upper 4.1m 4.5m 3.5m no yes yes street wall height 20 - 45m 48m no setback above street wall height 8m weighted average 4.5m no

slide-40
SLIDE 40

40

compliance with DCP controls

control proposed compliance

lane wall frontage height 20 - 45m 48m no setback above lane wall height 3m no set back no

slide-41
SLIDE 41

Design Advisory Panel

DAP reviewed the application on 20 February 2020 The panel generally supported the proposal but raised the following concerns:

  • relationship with 333 George Street, awning height should match
  • George Street fenestration, facade materiality
  • quality of ground floor space
  • request to waive competitive design process supported if design issues

resolved Issues have been addressed in amended plans

slide-42
SLIDE 42

background

  • D/2018/922 - approved on 15 April 2019 for a 17 storey mixed use

building, including retail premises, hotel, cafe and bar on adjacent premises at 323-325 George Street. Construction has not commenced.

  • D/2012/696 - approved on 6 December 2012 for a 19 storey

commercial building, including retail premises, basement parking and signage on adjacent premises at 333 George Street. Construction of the building completed in 2017.

slide-43
SLIDE 43

issues

  • non compliance with street wall height and setbacks
  • relationship with curved corner of 333 George Street / party wall
  • clause 4.6 request to vary clause 6.16 SLEP 2012 ‘Erection of tall

building buildings in Central Sydney’

  • site specific DCP and competitive design process
slide-44
SLIDE 44

street wall height and setbacks

  • non-compliant street and

lane wall height

  • non-compliant front and

rear setbacks above street wall height

  • no significant impacts to

public domain, solar access, wind effects or pedestrian amenity

slide-45
SLIDE 45

street wall height and setbacks

  • proposal achieves contextual fit

to George Street and Wynyard Lane

  • street and lane frontage heights

and upper setbacks consistent with existing/approved adjoining development

slide-46
SLIDE 46

relationship with 333 George Street

  • shared common wall with

333 George Street

  • condition to require

amended drawings to reflect existing conditions

  • setback maintained to

expose curved corner

slide-47
SLIDE 47

relationship with 333 George Street

slide-48
SLIDE 48

clause 6.16 SLEP 2012

  • buildings over 55m to have a free standing tower form with all faces

visible from public domain

  • building has a height of 56.68m
  • does not have a freestanding tower
  • Clause 4.6 variation request supported
  • minor exceedance of 55m (nb: complies with 130m height limit)
  • proposal compatible with the existing development to the south and

the approved development to the north

slide-49
SLIDE 49

site specific DCP & competitive design process

  • minor exceedance of 55m height trigger
  • proposal positively addresses matters for consideration
slide-50
SLIDE 50

recommendation

  • approve subject to conditions