local concerns meeting
play

Local Concerns Meeting S IDEWALK Mar arch 27, , 2018 C ONNECTIVITY - PowerPoint PPT Presentation

L ITTLETON 41362 Local Concerns Meeting S IDEWALK Mar arch 27, , 2018 C ONNECTIVITY P ROJECT NHDOT Transportation Alternatives Program L ITTLETON 41362 Presentation Overview S IDEWALK C ONNECTIVITY P ROJECT Purpose and Need Project


  1. L ITTLETON 41362 Local Concerns Meeting S IDEWALK Mar arch 27, , 2018 C ONNECTIVITY P ROJECT NHDOT Transportation Alternatives Program

  2. L ITTLETON 41362 Presentation Overview S IDEWALK C ONNECTIVITY P ROJECT ▪ Purpose and Need ▪ Project Area/Potential Issues Addressed ▪ Project Development ▪ Preliminary Schedule ▪ Public Input NHDOT Transportation Alternatives Program

  3. L ITTLETON 41362 Purpose and Need S IDEWALK C ONNECTIVITY P ROJECT “ This project is necessary to allow people that do not have a vehicle or cannot drive, the ability to access medical appointments or basic necessities such as grocery stores safely on foot or bicycle and to also allow safe access to Littleton's tourist destinations with a variety of transportation modes from a connection to the Ammonoosuc Rail Trail. ” “The goal is to make Littleton a safe pedestrian friendly town for residents, tourists, the elderly and disabled by improving traffic flow and the condition of sidewalks to bring them into compliance with ADA standards. ” Source: 2016 Transportation Alternatives Program (TAP) Application for Funding NHDOT Transportation Alternatives Program

  4. L ITTLETON 41362 Project Description S IDEWALK C ONNECTIVITY P ROJECT “ This proposed project includes five foot wide sidewalks along town and state roadways as follows: 1890 LF along Cottage Street, 400 LF along Mill Street, 1110 LF along South Street, 310 LF along Meadow Street, 400 LF connection to Suspension Bridge, 770 LF along Mt. Eustis Road and 710 LF along Bronson Street. ” “The project will connect with 5 bridges that cross the Ammonoosuc River in a 1 mile stretch. Route 302/Cottage Street Bridge, Covered Bridge (2004), Suspension Bridge (1939), Bridge Street Multi-modal (2016 under construction), and Littleton Industrial Park (1998). ” Source: 2016 Transportation Alternatives Program (TAP) Application for Funding NHDOT Transportation Alternatives Program

  5. L ITTLETON 41362 Project Area S IDEWALK C ONNECTIVITY P ROJECT

  6. L ITTLETON 41362 Cottage Street S IDEWALK C ONNECTIVITY P ROJECT

  7. L ITTLETON 41362 Cottage Street S IDEWALK C ONNECTIVITY P ROJECT

  8. L ITTLETON 41362 Cottage Street S IDEWALK C ONNECTIVITY P ROJECT

  9. L ITTLETON 41362 Cottage Street S IDEWALK C ONNECTIVITY P ROJECT

  10. L ITTLETON 41362 Mt. Eustis Road S IDEWALK C ONNECTIVITY P ROJECT

  11. L ITTLETON 41362 Mt. Eustis Road S IDEWALK C ONNECTIVITY P ROJECT

  12. L ITTLETON 41362 Mt. Eustis Road S IDEWALK C ONNECTIVITY P ROJECT

  13. L ITTLETON 41362 Bronson Street S IDEWALK C ONNECTIVITY P ROJECT

  14. L ITTLETON 41362 Bronson Street S IDEWALK C ONNECTIVITY P ROJECT

  15. L ITTLETON 41362 Bronson Street S IDEWALK C ONNECTIVITY P ROJECT

  16. L ITTLETON 41362 Bronson Street S IDEWALK C ONNECTIVITY P ROJECT

  17. L ITTLETON 41362 South Street/Riverside Park S IDEWALK C ONNECTIVITY P ROJECT

  18. L ITTLETON 41362 South Street/Riverside Park S IDEWALK C ONNECTIVITY P ROJECT

  19. L ITTLETON 41362 South Street/Riverside Park S IDEWALK C ONNECTIVITY P ROJECT

  20. L ITTLETON 41362 South Street/Riverside Park S IDEWALK C ONNECTIVITY P ROJECT

  21. L ITTLETON 41362 Mill Street S IDEWALK C ONNECTIVITY P ROJECT

  22. L ITTLETON 41362 Segment 5 S IDEWALK Can Candia Road / Proctor Road to o Lak Lake Sh Shore Roa oad C ONNECTIVITY P ROJECT

  23. L ITTLETON 41362 Segment 5 S IDEWALK Can Candia Road / Proctor Road to o Lak Lake Sh Shore Roa oad C ONNECTIVITY P ROJECT

  24. L ITTLETON 41362 Segment 5 S IDEWALK Can Candia Road / Proctor Road to o Lak Lake Sh Shore Roa oad C ONNECTIVITY P ROJECT

  25. L ITTLETON 41362 Meadow Street S IDEWALK C ONNECTIVITY P ROJECT

  26. L ITTLETON 41362 Segment 5 S IDEWALK Can Candia Road / Proctor Road to o Lak Lake Sh Shore Roa oad C ONNECTIVITY P ROJECT

  27. L ITTLETON 41362 Project Development S IDEWALK C ONNECTIVITY P ROJECT Engineering Study ▪ Loc Local l Con Concerns Mee eetin ing ▪ Alt lternativ ive/Conceptual Des Desig ign ▪ Surv Survey ▪ Proposed Acti ction Mee eeting ▪ Engineering St En Study Doc Document ▪ Dr Draft En Environmental Doc Document Preliminary Design Final Design Construction NHDOT Transportation Alternatives Program

  28. L ITTLETON 41362 Preliminary Schedule S IDEWALK C ONNECTIVITY P ROJECT Local Concerns Meeting ……………………………………………….. March 27, 2018 Proposed Action Meeting ………………………………………………. May 2018 Engineering Study Complete ………………………………………...... July 2018 Preliminary Design Complete …………………………………............ November 2018 Final Design Complete ………………………………………………..... March 2019 Project Advertisement ………………………………………………...... April 2019 Construction ………………………………………………………………. Summer 2019 NHDOT Transportation Alternatives Program

  29. L ITTLETON 41362 Questions and Discussion S IDEWALK C ONNECTIVITY P ROJECT Contacts Jas Jason Be Beaudet, P.E .E . Andrew Dorse sett CMA Engin CM gineers, In Inc. Town of of Lit Little leton (6 (603) 627-0708 (6 (603) 444-3996 jbea eaudet@cmaengin ineers.com adorsett@townofli littleton.org NHDOT Transportation Alternatives Program

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend