Lets power New Yorks future together Julia Bovey Director, - - PowerPoint PPT Presentation

let s power new york s future together
SMART_READER_LITE
LIVE PREVIEW

Lets power New Yorks future together Julia Bovey Director, - - PowerPoint PPT Presentation

Lets power New Yorks future together Julia Bovey Director, External Affairs | Equinor Wind US Equinor introduction: Bringing European experience to the US Japan Ja No North We West United Un d Stat ates Eu Europe Ea East Coast


slide-1
SLIDE 1

Let’s power New York’s future together

Julia Bovey

Director, External Affairs | Equinor Wind US

slide-2
SLIDE 2

Open 2 |

Sh Sheringham Sh Shoal Hy Hywi wind d de demo

2009- 2012- 2017 2017 2020-

Du Dudgeo eon Do Dogger er Ba Bank Hy Hywi wind d Sc Scotland Fl Floating la large scale le No North We West Eu Europe In operation In operation In operation In operation Consented

2. 2.3 MW MW 31 317 MW 40 402 MW 30 30 MW 3 3 x 1.2 GW

2019

Ar Arkona

38 385 MW

In operation

2024-

Em Empire Wind Un United d Stat ates Ea East Coast Provisional Award

816 816MW

Ja Japan US US West Coas ast

Equinor introduction: Bringing European experience to the US

slide-3
SLIDE 3

Open

Equinor Wind in the US: leading position in US offshore wind

3 |

New York New Jersey New England

slide-4
SLIDE 4

Open

Empire Wind: Key facts

  • Provisional award capacity: 816 MW
  • Foundations: Gravity-Based (Concrete)

manufactured in the Capital Region

  • Operations and Maintenance (O&M) base in

New York City

  • Proposed onshore substation: Gowanus
  • Next generation turbines
  • Water depth: 65 – 100 ft
  • Construction period: 2022-23
  • Electricity Delivered to New York: 2024+

4 |

slide-5
SLIDE 5

Open

  • Creating thousands of jobs during construction and operations
  • Creating a manufacturing hub for concrete foundations at

Port of Coeymans

  • More than $60 million in port upgrades
  • Operations and maintenance base in New York
  • Establishing a community benefits fund of $4.5 million
  • Supplying renewable power from the New York Bight to the

heart of New York City

  • Supporting New York State in cost-effectively delivering its

long-term decarbonization goals

  • Reduced CO2 emissions of 1.6 million tons per year

5 |

Empire Wind: Providing great benefits to New York

slide-6
SLIDE 6

Open

Empire Wind: Gravity-Based Structure (GBS) Foundation Fabrication

Tow out ~120nm, 30hr, @4knots Tow to Site ~20nm, 6hr, @5knots Staging & Final Mechanical Completion EU TP Manufacturing and transport to US, 2wks transport @10knots

6 |

Port of Coeymans (Ravena, NY)

  • 1. Fabrication at Port of Coeymans
  • 2. Assembly with Transition Piece
  • 3. Staging and Delivery to Site
slide-7
SLIDE 7

Open 7 |

Empire Wind: Operations and Maintenance (O&M) base in Brooklyn

  • Proposed O&M base at South Brooklyn

Marine Terminal

  • Direct labor: approx. 50-70 full-time jobs
  • Indirect labor: additional staffing working

from the base:

  • Turbine suppliers
  • Vessel workers
  • Other contractors – e.g. Installation

and construction contractors, equipment contractors, vessel captains, etc.

Dudgeon O&M – East coast UK

slide-8
SLIDE 8

Open 8 |

Empire Wind: Responsible siting and permitting

New York State

  • Environmental and

Fishing Mitigation Plans

  • Article VII Process

BOEM

  • Site Assessment Plans

(SAP)

  • Construction and

Operation Plan (COP)

  • Environmental and

Technical Review

Stakeholder Engagement

slide-9
SLIDE 9

Open 9 |

Contact: Julia Bovey Director, External Affairs jbov@equinor.com www.empirewind.com Twitter: @EquinorWindUS