Long-Baseline Neutrino Facility LBNF
LBNF Cryogenics Progress David Montanari FS Integration 21 - - PowerPoint PPT Presentation
LBNF Cryogenics Progress David Montanari FS Integration 21 - - PowerPoint PPT Presentation
LBNF Long-Baseline Neutrino Facility LBNF Cryogenics Progress David Montanari FS Integration 21 February 2018 Thanks to Mark Adamowski (Fermilab). Jean-Baptiste Mayolini (CERN). Mike Delaney (Fermilab). Aurlien Diaz (CERN).
LBNF
Thanks to
02.21.18 David Montanari | LBNF Cryogenics Progress 2
- Mark Adamowski (Fermilab).
- Jean-Baptiste Mayolini (CERN).
- Mike Delaney (Fermilab).
- Aurélien Diaz (CERN).
- Roza Doubnik (Fermilab).
- Jack Fowler (Duke University).
- Kevin Haaf (Fermilab).
- Marzio Nessi (CERN).
- Adrien Parchet (CERN).
- Erik Voirin (Fermilab).
LBNF
Proximity Cryogenics in Detector’s Cavern
02.21.18 David Montanari | LBNF Cryogenics Progress 3
LBNF
Proximity Cryogenics on Mezzanine – Iso View (as Oct 2017)
35 m 12 m 7.7 m
02.21.18 4 David Montanari | LBNF Cryogenics Progress
4.8 m
Added 4.8 m to access detector feedthroughs
LBNF
Proximity Cryogenics on Mezzanine – Iso View (Current)
44.6 m 12 m
02.21.18 5 David Montanari | LBNF Cryogenics Progress
4.8 m
LBNF
Proximity Cryogenics on Mezzanine – Iso View (Current)
4 4 . 6 m 12 m
02.21.18 6 David Montanari | LBNF Cryogenics Progress
4.8 m
LBNF
Proximity Cryogenics on Mezzanine – Side View (Current)
7.7 m Envelope of I-Beam + Crane
02.21.18 7 David Montanari | LBNF Cryogenics Progress
Stay clear zone
LBNF
Proximity Cryogenics on Mezzanine – Top View
44.6 m 12 m 2.9 m
02.21.18 8 David Montanari | LBNF Cryogenics Progress
4.8 m
LBNF
Transformers Requirements
02.21.18 9 David Montanari | LBNF Cryogenics Progress
From: Theresa M Shaw tshaw@fnal.gov Subject: RE: LBNF Transformers on mezzanine? Date: February 21, 2018 at 9:37 AM To: David Montanari dmontana@fnal.gov Cc: Theresa M Shaw tshaw@fnal.gov, Steve J Chappa chappa@fnal.gov, Arnab Ghosh arnabg@fnal.gov
Hi David, Our proposed DUNE Detector AC distribution is in docdb 6922. What is proposed for placement on the mezzanine are the (4) 112.5KVA transformers each paired with a Rack (4 total) which holds the Saturable Inductor and Impedance Monitor. So, similar to ProtoDUNE x 4. Each transformer: Weight ~810 lbs 30” (w) x30” (d) X37” (h) Rack: Weight ~700 lbs (guess) 24” (w) x 30 (d) x 79” (h) Note that there are also codes for working areas or “stay clear” areas around the transformers of – “The general distances for working clearance are 3 feet in front and a
minimum width of 30 inches”. Steve Chappa is thinking about the best locations for this equipment on the mezzanine, but I wanted to get you these initial numbers.
- Terri
LBNF
Proximity Cryogenics on Mezzanine – Highlights
02.21.18 David Montanari | LBNF Cryogenics Progress 10
- Extended mezzanine platform by 9.6 m (Was 39.8 m, now 49.4).
- Added two office-type spaces.
- Increased number of controls racks (from 4 to 8).
- Added collectors for purges in feedthroughs.
- Added panel for GAr Analyzers to collect lines from purges.
- Cleanup and minor modifications to pipe routing.
- Getting requirements on transformers and racks to be places on
- mezzanine. Will be implemented soon.
LBNF
LAr Pumps
02.21.18 David Montanari | LBNF Cryogenics Progress 11
LBNF
LAr Pumps Configuration (as of Oct 2017)
02.21.18 12 David Montanari | LBNF Cryogenics Progress
Mezzanine LAr circulation pumps
LBNF
LAr Pumps Configuration (Current) – 1/2
02.21.18 13 David Montanari | LBNF Cryogenics Progress
Space for lifting device 2.0 m x 2.0 m (Alimak, etc.) Current clearance: 0.8 m
LBNF
LAr Pumps Configuration (Current) – 2/2
02.21.18 14 David Montanari | LBNF Cryogenics Progress
Current Equipment height: 4.2 m
LBNF
NP-04 – Protection for Protego + Valve Box
02.21.18 15 David Montanari | LBNF Cryogenics Progress
LBNF
LAr Pumps – Highlights
02.21.18 David Montanari | LBNF Cryogenics Progress 16
- Removed pump towers and replaced with inline pumps + valve
boxes.
- Verified size of pipes and updated model. Inlet/outlet to/from LAr
pumps are now smaller:
- 3 in SCH 10 (DN 80) process.
- 5 in SCH 10 (DN 125) vacuum jacket.
- Left 2.0 m x 2.0 m in NE corner for lifting device/stairs.
- Need to add protective structure that might be 5.0-5.5 m high.
- Working with Far Detector on Clean Room requirements and
- interfaces. Access and space are shared in this area.
- Working with Cryostat, Far Detector, Systems Engineering on
installation sequence.
- Ongoing discussion on rock septum and whether it is removed.