Lake Trafford Substation Construction Phase Two Phase Two to - - PowerPoint PPT Presentation

lake trafford
SMART_READER_LITE
LIVE PREVIEW

Lake Trafford Substation Construction Phase Two Phase Two to - - PowerPoint PPT Presentation

Lake Trafford Substation Construction Phase Two Phase Two to include: Ground grid Ground Grid 12,500 of 4/0 copper 515 ground rods 1,407 exothermic welds Phase Two to include: Ground grid Cabling Cabling 272


slide-1
SLIDE 1

Lake Trafford Substation Construction Phase Two

slide-2
SLIDE 2

Phase Two to include:

  • Ground grid
slide-3
SLIDE 3

Ground Grid

  • 12,500’ of 4/0 copper
  • 515 ground rods
  • 1,407 exothermic welds
slide-4
SLIDE 4

Phase Two to include:

  • Ground grid
  • Cabling
slide-5
SLIDE 5

Cabling

  • 272’ of Trenwa
  • 3,400’ of 2” conduit
  • Over 21,000’ control

cable

slide-6
SLIDE 6

Phase Two to include:

  • Ground grid
  • Cabling
  • Concrete
slide-7
SLIDE 7

Caissons and Pads

  • 43 caissons
  • 714 cu. yds. of

concrete

  • 7 pads
  • 45 cu. yds. of

concrete

slide-8
SLIDE 8

Phase Two to include:

  • Ground grid
  • Cabling
  • Concrete
  • High-side breakers and bus
slide-9
SLIDE 9

138kv Breakers and Bus

  • 4 - 138kv breakers
  • 7 - 138kv disconnects
  • 580’ of 4” Al bus
  • 14 bus-support structures
slide-10
SLIDE 10

Phase Two to include:

  • Ground grid
  • Cabling
  • Concrete
  • High-side breakers and bus
  • 138kv capacitor bank
slide-11
SLIDE 11

Capacitor Bank

slide-12
SLIDE 12

Bid Results

PowerTown Line Construction Tampa, FL $309,478.69 McLaren Construction Company West Palm Beach, FL

  • Elite Construction of Ocala

Ocala, FL

  • Aubrey Silvey

Carrollton, GA

  • Kent Power

Kent, MI

  • Service Electric Company

Chattanooga, TN

slide-13
SLIDE 13

PowerTown – LCEC Projects

  • Neutral grounding reactor (NGR) foundations – 2014
  • Carnestown circuit addition – 2013
  • North Trail below grade – 2013
  • Carnestown transformer changeout – 2011
  • Del Prado expansion – 2010
slide-14
SLIDE 14

Action Requested

We are requesting a motion to authorize the CEO to sign a contract with PowerTown Line Construction, LLC, for $309,478.69.

slide-15