lak vrooman road b id bridge replacement r l t
play

LAK-Vrooman Road B id Bridge Replacement R l t ODOT Project ID - PowerPoint PPT Presentation

LAK-Vrooman Road B id Bridge Replacement R l t ODOT Project ID 5669 Sponsored by the Lake County Engineer Sponsored by the Lake County Engineer Vrooman Road over the Grand River Bridge Replacement P bli M Public Meeting ti January 27,


  1. LAK-Vrooman Road B id Bridge Replacement R l t ODOT Project ID 5669 Sponsored by the Lake County Engineer Sponsored by the Lake County Engineer Vrooman Road over the Grand River Bridge Replacement P bli M Public Meeting ti January 27, 2009 y ,

  2. Welcome! Thank you for your attendance. Thank you for your attendance. Please take your time viewing this ease a e you e e g s presentation and visiting the various information stations located various information stations located throughout the Community Center. The Project Team members are h here to answer questions you may t ti have regarding the project. g g p j

  3. Goals of Today’s Meeting • Disseminate information • Answer your questions • Answer your questions • Solicit your input y p

  4. Presentation Outline • Project History • Purpose and Need Purpose and Need • Project Limits • Traffic T ffi • 2004 Bridge Replacement Study g p y • What about Alternative C? • Current Project Status • Current Project Status • What’s next?

  5. Project History The Lake County Engineer’s Office in conjunction with ODOT and the j Project Stakeholders have initiated preliminary engineering and p y g g environmental studies to identify the “Preferred” replacement alternative p for the structurally deficient and functionally obsolete Vrooman Road functionally obsolete Vrooman Road Bridge over the Grand River

  6. Project History • Current steel bridge erected in 1952 on masonry foundations from the f d ti f th previous bridge built in 1879 • Bridge replacement study initiated Bridge replacement study initiated and completed in early 1960’s, delayed because of lack of funding delayed because of lack of funding • Complete replacement plans finalized C f in mid 1990’s, but delayed because of environmental issues

  7. Project History • A new bridge replacement study was commissioned in 2004 because the commissioned in 2004 because the existing bridge has continued to deteriorate deteriorate • 2004 replacement study ended in 2005 with submission of the Planning 2005 with submission of the Planning Study

  8. Project History • The revised Planning Study was approved by ODOT in 2008 approved by ODOT in 2008 • Current Effort (2008) C t Eff t (2008) – Build on and supplement Planning Study completed in 2005 St d l t d i 2005 – Perform additional Environmental Studies and Investigations Studies and Investigations – Complete Preliminary Engineering studies and report studies and report – Identify “Preferred Alternative”

  9. Purpose and Need The purpose of this project is to replace the structurally-deficient and p y functionally obsolete bridge that regularly closes during flood events g y g with a facility that meets current design standards and improves g p existing geometrics correcting existing roadway deficiencies, while existing roadway deficiencies, while providing a safe, efficient route.

  10. Project Limits • Southern terminus is generally I-90 – Intersection of Vrooman Road and I-90 ramps p • Northern terminus is generally SR 84 • Northern terminus is generally SR-84 – Intersection of Madison Avenue and SR-84 for Alternative A – Intersection of Lane Road and SR-84 for Alternative B

  11. Project Limits • Overall project can be divided into two discrete segments: – “Southern Reach” Southern Reach – “Valley Crossing” • Current environmental study effort is C t i t l t d ff t i looking at both the “Southern Reach” and “Valley Crossing” • Current engineering study effort is • Current engineering study effort is focused on the “Valley Crossing”

  12. Project Limits • “Southern Reach” (Both Alternatives) – Segment length approximately 4,400 Segment length approximately 4 400 feet – From I-90 ramps, north to just south of F I 90 th t j t th f last curve on southern escarpment – From Osborne property at intersection of Vrooman Road and I-90 ramps, to Ash-Sanford and Siders properties on Vrooman Road

  13. Project Limits • “Valley Crossing” (Alternative A) – Segment length approximately 2,900 Segment length approximately 2 900 feet – From just south of last curve on F j t th f l t southern escarpment, north to the SR- 84 84 and Madison Avenue intersection d M di A i t ti – From Ash-Sanford and Siders properties on Vrooman Road to Northeast Auto Service on SR-84

  14. Project Limits • “Valley Crossing” (Alternative B) – Segment length approximately 3,200 Segment length approximately 3 200 feet – From just south of last curve on F j t th f l t southern escarpment, north to the SR- 84 84 and Lane Road intersection d L R d i t ti – From Ash-Sanford and Siders properties on Vrooman Road to Perry Cemetery on SR-84

  15. Traffic • This area of Lake County is considered a part of the Lake County Urbanized Area • Vrooman Road is classified as an Urban Collector/Arterial by NOACA Urban Collector/Arterial by NOACA and ODOT • Both NOACA and ODOT project modest growth for the area based on modest growth for the area based on current land use

  16. Vrooman Road Vrooman Road Traffic

  17. Vrooman Road Lake County Urbanized Area Traffic

  18. Traffic • Charged with using ODOT Office of Technical Services (OTS) Certified Technical Services (OTS) Certified Traffic – Present Day ADT Approximately 5200 Present Day ADT Approximately 5200 VPD – Opening Year (2012) ADT Opening Year (2012) ADT approximately 5,200 VPD per ODOT OTS, 5,700 VPD per Planning Study model d l – Design Year (2032) ADT approximately 5 900 VPD per ODOT OTS 6 600 VPD 5,900 VPD per ODOT OTS, 6,600 VPD per Planning Study model

  19. Traffic • Current NOACA Traffic Model for project used in planning study has different traffic volume projections p j – Assumes that 75% of SR-528 Truck traffic may use Vrooman Road traffic may use Vrooman Road – This represents approximately 480 trucks in Opening Year (2012) trucks in Opening Year (2012) – This represents approximately 710 t trucks in Design Year (2032) k i D i Y (2032)

  20. Traffic • NOACA Traffic Model considers current traffic composition and volume, and existing land use , g • Both current traffic projections indicate that no more than two lanes of roadway are required to support the projected traffic volumes the projected traffic volumes

  21. 2004 Bridge Replacement Study Study Focus • Public Involvement Public Involvement – Stakeholder Committee Meetings – Public Meetings Public Meetings • Preliminary Environmental Screening P li i E i t l S i and Evaluation

  22. 2004 Bridge Replacement Study Study Focus • Develop Conceptual Alternatives Develop Conceptual Alternatives • Complete Planning Study C l t Pl i St d – Goal was to identify “Preferred Alternative” through environmental and engineering studies combined with Public and Stakeholder Committee Public and Stakeholder Committee Meetings

  23. 2004 Bridge Replacement Study Conceptual Alternatives • Ten Preliminary Conceptual Alt Alternatives were originally identified ti i i ll id tifi d in a February, 2004 Stakeholder Committee Meeting Committee Meeting • Five Conceptual Alternatives were recommended for further consideration through June, 2004 id ti th h J 2004 Stakeholder Committee Meetings

  24. 2004 Bridge Replacement Study Conceptual Alternatives • The five Conceptual Alternatives were presented to the General Public t d t th G l P bli in a Public Meeting held on July 7, 2004 2004 • Stakeholder Committee meetings St k h ld C itt ti were held in July, 2004 and February 2005 to review the study and public 2005 to review the study and public input

  25. 2004 Bridge Replacement Study Conceptual Alternatives • Alt A – High-Level bridge to Madison Avenue • Alt B – High Level bridge to Lane Road Road • Alt C – Low Level crossing on existing alignment existing alignment • Alt D – Replace bridge in current location • Alt E – “No-Build”

  26. 2004 Bridge Replacement Study Preferred Alternative • Alternative B was identified as the • Alternative B was identified as the “Preferred Alternative” in a February, 2005 Stakeholder Committee Meeting • This conclusion was documented in Thi l i d t d i the December 2005 Planning Study

  27. 2004 Bridge Replacement Study Planning Study Revisions • Subsequent ODOT review indicated th t that additional environmental and dditi l i t l d engineering studies were necessary to show relative impacts of both to show relative impacts of both Alternative A and Alternative B • Revisions were made to the Planning St d i Study in January, 2007 and May, J 2007 d M 2008

  28. 2004 Bridge Replacement Study Alternative A (Madison Avenue) (Madison Avenue) • Satisfies Purpose and Satisfies Purpose and Need • 1800’ long, high-level valley crossing to valley crossing to Madison Avenue / SR – 84 intersection • Improved intersection geometry • Improved horizontal and Improved horizontal and vertical geometry • Two lanes plus shoulders shoulders

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend