CRP 693 W Cashmere Bridge Replacement Project 1 2 Existing Condition of West Cashmere Bridge Multi-Design Bridge with Warren Truss Main Spans Total Length 503 feet Posted for No Trucks 3 Existing Condition Needed Repairs


slide-1
SLIDE 1

1

CRP 693 W Cashmere Bridge Replacement Project

slide-2
SLIDE 2

2

slide-3
SLIDE 3

Existing Condition of West Cashmere Bridge

Multi-Design Bridge with Warren Truss Main Spans

Total Length 503 feet Posted for “No Trucks”

3

slide-4
SLIDE 4

Existing Condition

Needed Repairs

  • Concrete structural

repairs & patching

  • Riprap

Replacement

  • Steel strengthening
  • Steel cleaning and

painting

  • Rail repairs

4

slide-5
SLIDE 5
  • Span over US 2/97 and ramp down into a roundabout (RAB)
  • Remove slip ramp and southern leg of intersection
  • Frontage roads use RAB to access US 2 intersection
  • Proposed structure carries all current regulated truck traffic
  • Improves function at 4 intersections along US 2/97

5

Highway US 2/97

PROPOSED Intersection & Approach Configuration

slide-6
SLIDE 6

North End Overview

  • Restore existing north end bridge

entrance to native vegetation.

  • Stormwater runoff will be treated

and remain onsite through use of infiltration ponds.

  • Five way intersection roundabout

for optimal traffic flow and space configuration.

  • Relocate signal pole to provide

larger turn radius for trucks heading westbound on US Hwy 2.

  • Landscape design elements for

aesthetic appeal.

6 Hay Canyon Rd

slide-7
SLIDE 7

7

South End Overview

Plan View & Existing VS. Proposed Bridge Elevation

  • Proposed bridge raised higher than the existing bridge to adhere

to BNSF and WSDOT regulations.

  • Stormwater runoff will be treated and remain onsite through use
  • f an infiltration pond and drywells.

Landscape restoration Shoulder rock Driveway match Stormwater facility Driveway match

slide-8
SLIDE 8

New Structure Length 952 feet Total Main Bridge Span 732 feet Bridge Ramps Down to a Roundabout Bridge Maintains the Only Overhead Crossing of the RR in and around Cashmere

8

slide-9
SLIDE 9

9

slide-10
SLIDE 10

Cross Section: Two 12-foot driving lanes; Two 5-foot shoulders; One 6-foot sidewalk

10

slide-11
SLIDE 11

Traffic Control Plan 1

1 1

Detour During Bridge Closure

slide-12
SLIDE 12

Traffic Control Plan 2

1 2

Detour During US2 Closure (Night-time Only)

slide-13
SLIDE 13

13

slide-14
SLIDE 14

14