July 16, 2019 Agenda 1. Construction Update East Portal/Yard - - PowerPoint PPT Presentation
July 16, 2019 Agenda 1. Construction Update East Portal/Yard - - PowerPoint PPT Presentation
Quality of Life Meeting July 16, 2019 Agenda 1. Construction Update East Portal/Yard Demolition B4/B15 2. Proposed Amendments to Modified GPP Block 1121 East Portal Work Bump Building Demolition B15 MPT Excavation
Agenda
- 1. Construction Update
- East Portal/Yard
- Demolition
- B4/B15
- 2. Proposed Amendments to Modified GPP
Block 1121 – East Portal Work
Bump Building Demolition
B15 – MPT – Excavation and Foundation
5
6
B4 MPT
Quality of Life Meeting – Presentation July 16, 2019
Proposed Amendments to Modified General Project Plan
- B5 Design Guidelines Drawings Modification
- Arena Block Bicycle Parking Reduction
- Change to Distinctive Architectural Design Element
Requirement for B9, B12, &B13
- Clarification on Commercial Use on Residential Blocks
- Project Parking Requirement Reduction (Block 1129)
- Change to Square Footage at Parcels B12 and B15
- Reduction of the Open Space North-South Walkway Width
- Ventilation Structures in Open Space
and substation
B5
WEST PORTAL LIRR DRILL TRACK LIRR RAMP LIRR INFRASTRUCTURE AND SUBSTATION
N N
ATLANTIC AVENUE PACIFIC STREET S I X T H A V E N U E
B5
EXISTING FOUNDATIONS EXISTING CORE FOUNDATION
N N
PACIFIC STREET ATLANTIC AVENUE SIXTH AVENUE
ATLANTIC AVENUE 6TH AVENUE BASE ENVELOPE SHOULDER ENVELOPE UPPER PORTION PACIFIC STREET
63'-0" 68'-0" 50'-0" MIN.
N N
SETBACKS
EXISTING FOUNDATIONS EXISTING CORE FOUNDATION
P A C I F I C S T R E E T 6 T H A V E N U E
7'-5" 6'-1/ 2" 12'-6" 7'-6" 2'-0" 2'-0" 2'-0" 2'-0"
DESIGN GUIDELINE ENVELOPE B5 PROPOSED ENVELOPE
N
PROPOSED BASE HT: 164'-0" PROPOSED SHOULDER HT: 270'-4" PROPOSED UPPER PORTION HT: 397'-0"
ATLANTIC AVENUE
12'-6" 7'-5" 6'-1/ 2" 2'-0" 7'-6" 2'-0" 8'-0" 39'-0"
DESIGN GUIDELINE ENVELOPE B5 PROPOSED ENVELOPE
N
UP TO 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 5'-0" PROJECTION
B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (NORTH-EAST) B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (SOUTH-WEST)
UP TO 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 5'-0" PROJECTION LIRR RAMP WITHIN OPEN SPACE
N
Arena Block Valet Bicycle Parking B3 Site Constraints
4 461
Arena Block Bicycle Parking
1 2 3 Location #1. 56 Spaces Location #2. 25 Spaces (existing racks) Location #3. 19 Spaces (existing racks)
Arena Block Bicycle Parking - Location # 1
*For Illustrative Purposes Only
Arena Block Bicycle Parking - Location #2
*For Illustrative Purposes Only
Arena Block Bicycle Parking - Location #3
*For Illustrative Purposes Only
*For Illustrative Purposes Only
Site 5 6 6 4 4 6 1 535 550 38 6 6
240 Parking Spaces 67 Parking Spaces 693 Parking Spaces
2019 Atlantic Yards Project Parking Key
Parking Key 1,000 Parking Spaces ❖ Site 5 – 240 Spaces ❖ B3 – 67 Spaces ❖ Block 1129 – 693 Spaces
Walkway Width Reduction
*For Illustrative Purposes Only
Ventilation Structures in Open Space
X X
Ventilation Structures in Open Space
Eastern Ventilation Structure Western Ventilation Structure
*For Illustrative Purposes Only