Quality of Life Meeting July 16, 2019 Agenda 1. Construction Update East Portal/Yard Demolition B4/B15 2. Proposed Amendments to Modified GPP Block 1121 East Portal Work Bump Building Demolition B15 MPT Excavation


slide-1
SLIDE 1

Quality of Life Meeting July 16, 2019

slide-2
SLIDE 2

Agenda

  • 1. Construction Update
  • East Portal/Yard
  • Demolition
  • B4/B15
  • 2. Proposed Amendments to Modified GPP
slide-3
SLIDE 3

Block 1121 – East Portal Work

slide-4
SLIDE 4

Bump Building Demolition

slide-5
SLIDE 5

B15 – MPT – Excavation and Foundation

5

slide-6
SLIDE 6

6

B4 MPT

slide-7
SLIDE 7

Quality of Life Meeting – Presentation July 16, 2019

Proposed Amendments to Modified General Project Plan

  • B5 Design Guidelines Drawings Modification
  • Arena Block Bicycle Parking Reduction
  • Change to Distinctive Architectural Design Element

Requirement for B9, B12, &B13

  • Clarification on Commercial Use on Residential Blocks
  • Project Parking Requirement Reduction (Block 1129)
  • Change to Square Footage at Parcels B12 and B15
  • Reduction of the Open Space North-South Walkway Width
  • Ventilation Structures in Open Space
slide-8
SLIDE 8

and substation

B5

WEST PORTAL LIRR DRILL TRACK LIRR RAMP LIRR INFRASTRUCTURE AND SUBSTATION

N N

ATLANTIC AVENUE PACIFIC STREET S I X T H A V E N U E

slide-9
SLIDE 9

B5

EXISTING FOUNDATIONS EXISTING CORE FOUNDATION

N N

PACIFIC STREET ATLANTIC AVENUE SIXTH AVENUE

slide-10
SLIDE 10

ATLANTIC AVENUE 6TH AVENUE BASE ENVELOPE SHOULDER ENVELOPE UPPER PORTION PACIFIC STREET

63'-0" 68'-0" 50'-0" MIN.

N N

SETBACKS

EXISTING FOUNDATIONS EXISTING CORE FOUNDATION

slide-11
SLIDE 11

P A C I F I C S T R E E T 6 T H A V E N U E

7'-5" 6'-1/ 2" 12'-6" 7'-6" 2'-0" 2'-0" 2'-0" 2'-0"

DESIGN GUIDELINE ENVELOPE B5 PROPOSED ENVELOPE

N

PROPOSED BASE HT: 164'-0" PROPOSED SHOULDER HT: 270'-4" PROPOSED UPPER PORTION HT: 397'-0"

ATLANTIC AVENUE

12'-6" 7'-5" 6'-1/ 2" 2'-0" 7'-6" 2'-0" 8'-0" 39'-0"

DESIGN GUIDELINE ENVELOPE B5 PROPOSED ENVELOPE

N

UP TO 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 5'-0" PROJECTION

B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (NORTH-EAST) B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (SOUTH-WEST)

UP TO 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 5'-0" PROJECTION LIRR RAMP WITHIN OPEN SPACE

N

slide-12
SLIDE 12

Arena Block Valet Bicycle Parking B3 Site Constraints

slide-13
SLIDE 13

4 461

Arena Block Bicycle Parking

1 2 3 Location #1. 56 Spaces Location #2. 25 Spaces (existing racks) Location #3. 19 Spaces (existing racks)

slide-14
SLIDE 14

Arena Block Bicycle Parking - Location # 1

*For Illustrative Purposes Only

slide-15
SLIDE 15

Arena Block Bicycle Parking - Location #2

*For Illustrative Purposes Only

slide-16
SLIDE 16

Arena Block Bicycle Parking - Location #3

*For Illustrative Purposes Only

slide-17
SLIDE 17

*For Illustrative Purposes Only

slide-18
SLIDE 18

Site 5 6 6 4 4 6 1 535 550 38 6 6

240 Parking Spaces 67 Parking Spaces 693 Parking Spaces

2019 Atlantic Yards Project Parking Key

Parking Key 1,000 Parking Spaces ❖ Site 5 – 240 Spaces ❖ B3 – 67 Spaces ❖ Block 1129 – 693 Spaces

slide-19
SLIDE 19

Walkway Width Reduction

*For Illustrative Purposes Only

slide-20
SLIDE 20

Ventilation Structures in Open Space

X X

slide-21
SLIDE 21

Ventilation Structures in Open Space

Eastern Ventilation Structure Western Ventilation Structure

*For Illustrative Purposes Only