july 16 2019 agenda 1 construction update east portal
play

July 16, 2019 Agenda 1. Construction Update East Portal/Yard - PowerPoint PPT Presentation

Quality of Life Meeting July 16, 2019 Agenda 1. Construction Update East Portal/Yard Demolition B4/B15 2. Proposed Amendments to Modified GPP Block 1121 East Portal Work Bump Building Demolition B15 MPT Excavation


  1. Quality of Life Meeting July 16, 2019

  2. Agenda 1. Construction Update • East Portal/Yard • Demolition • B4/B15 2. Proposed Amendments to Modified GPP

  3. Block 1121 – East Portal Work

  4. Bump Building Demolition

  5. B15 – MPT – Excavation and Foundation 5

  6. B4 MPT 6

  7. Quality of Life Meeting – Presentation July 16, 2019 Proposed Amendments to Modified General Project Plan - B5 Design Guidelines Drawings Modification - Arena Block Bicycle Parking Reduction - Change to Distinctive Architectural Design Element Requirement for B9, B12, &B13 - Clarification on Commercial Use on Residential Blocks - Project Parking Requirement Reduction (Block 1129) - Change to Square Footage at Parcels B12 and B15 - Reduction of the Open Space North-South Walkway Width - Ventilation Structures in Open Space

  8. ATLANTIC AVENUE WEST PORTAL LIRR DRILL TRACK B5 LIRR RAMP PACIFIC STREET LIRR INFRASTRUCTURE and substation AND SUBSTATION S I X T H A V E N U E N N

  9. ATLANTIC AVENUE EXISTING FOUNDATIONS B5 EXISTING CORE FOUNDATION SIXTH AVENUE PACIFIC STREET N N

  10. ATLANTIC AVENUE SETBACKS 50'-0" MIN. EXISTING FOUNDATIONS 63'-0" 68'-0" EXISTING CORE FOUNDATION 6TH AVENUE UPPER SHOULDER PORTION ENVELOPE BASE ENVELOPE PACIFIC STREET N N

  11. UP TO 25% OF TOTAL SURFACE AREA UP TO 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 25% OF TOTAL SURFACE AREA EXCEEDS 5'-0" PROJECTION EXCEEDS 5'-0" PROJECTION 2'-0" 7'-5" 12'-6" 6'-1/ 2" 6'-1/ 2" DESIGN GUIDELINE ENVELOPE 12'-6" B5 PROPOSED ENVELOPE 7'-5" DESIGN GUIDELINE ENVELOPE 2'-0" B5 PROPOSED ENVELOPE PROPOSED UPPER PORTION HT: 397'-0" 7'-6" PROPOSED SHOULDER HT: 270'-4" 2'-0" 2'-0" 7'-6" 2'-0" PROPOSED BASE HT: 164'-0" LIRR RAMP WITHIN OPEN SPACE 39'-0" 8'-0" 2'-0" T E E R 6 T T S H C A I F V I E C ATLANTIC AVENUE N A U P E N N N B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (NORTH-EAST) B5 PROPOSED DEVELOPMENT ENVELOPE DIAGRAM (SOUTH-WEST)

  12. Arena Block Valet Bicycle Parking B3 Site Constraints

  13. 461 4 Arena Block Bicycle Parking Location #1. 56 Spaces Location #2. 25 Spaces (existing racks) Location #3. 19 Spaces (existing racks) 2 3 1

  14. Arena Block Bicycle Parking - Location # 1 *For Illustrative Purposes Only

  15. Arena Block Bicycle Parking - Location #2 *For Illustrative Purposes Only

  16. Arena Block Bicycle Parking - Location #3 *For Illustrative Purposes Only

  17. *For Illustrative Purposes Only

  18. 2019 Atlantic Yards Project Parking Key Site 5 240 Parking 6 6 4 Spaces 4 6 1 535 550 38 6 67 Parking Spaces 693 Parking Spaces 6 Parking Key 1,000 Parking Spaces ❖ Site 5 – 240 Spaces ❖ B3 – 67 Spaces ❖ Block 1129 – 693 Spaces

  19. Walkway Width Reduction *For Illustrative Purposes Only

  20. Ventilation Structures in Open Space X X

  21. Ventilation Structures in Open Space Eastern Ventilation Structure Western Ventilation Structure *For Illustrative Purposes Only

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend