Ivan Larsen, Sales Manager Clean Shore Power S er Sol oluti tions Proven Technology developed by FAYARD and Danfoss A Safe proven containerized solution, resulting in Comprehensive Reduction of Emission to Air , Increased Energy Efficiency and
Clean Shore Power S er Sol
- luti
tions
Proven Technology developed by FAYARD and Danfoss
A Safe proven containerized solution, resulting in Comprehensive Reduction of Emission to Air, Increased Energy Efficiency and No Noise from power generation
Back ckgroun und f d for r Clea ean Shore re Power a at FAYARD
More than 100 years in the repair service High demand from Owners requires efficient and safe solutions Clean Shore Power is a natuaral spin off from our innovative: More than 120 vessels per year serviced Stabile and reliable power supply 24/7 Correct voltage & frequency at all times Correct monitoring of consumed KWH. SAFETY - at all times.
Shore connect point
Shore power established > Engines are stopped
No noise! No ship emmision!
Quay All cable connections are made by using standard plugs for easy, fast & failsafe connecting
Typical FAYARD shore connection
Cost st effecti tive shore powe wer solution f for Ter erminal available today
Schematic illustration of actual case in Sweden
Existing 11 Kv. Transformer station Self contained 500 volt, 50 hz. To 450 volt, 60 hz. Power Converter Self contained 11 / 0,5 Kv. Transformer station 3x11000 volt 3x500 volt
Safe area Hasardous area Oil pier Sea
Stand alone EX ZONE 1 El / Hydraulic Cable handling crane
Vessel
Vessels shore connection point 3x450 volt Site Office Shore connection monitoring Network 3x450 volt EX Zone 1 Remote control Control functions
Flexibility for vessel: Vessel power and/or Shore grid power availablity
Operati tion
- n s
sequence ces com comply w with vesse ssel a and shore g grid safety r requireme ments
Start Vessel arrive at the quay side Mooring completed Banksman
- perates the
cable handling crane Vessels crew take over shore cables and the remote control Shore cables are plugged to vessels connecting point When the safety control loops are
- k power can be
switched on Switch power on using the remote control and Syncronize Connect to vessels grid and take over load from the DG’s End Shut down the DG’s Start Start the DG’s Syncronize with vessels grid and connect Take over load from the shore power End Turn of shore power using the remote control Disconnect the shore power cables Banksman
- perates the cable
handling crane Move the shore cables back to the quay side Slack the mooring and take it away Vessel ready for departure
Arrival Departure Safety
Monitoring Alarming Emergency Shutdown Emergency release
Benefit for vessel: Switching to clean shore power without ”black-out”
Clean Shore Power S er Sol
- luti
tions
Proven Technology developed by FAYARD and Danfoss