INTRODUCTION - PURPOSE Develop Conceptual Plan to Relieve Traffic Congestion Improve Effectiveness of Freight Movement STUDY BOUNDARIES STUDY OVERVIEW MAJOR TASKS Data Collection Capacity Analysis Develop Conceptual Alternatives EXISTING


slide-1
SLIDE 1
slide-2
SLIDE 2

INTRODUCTION - PURPOSE

Develop Conceptual Plan to Relieve Traffic Congestion Improve Effectiveness of Freight Movement

slide-3
SLIDE 3

STUDY BOUNDARIES

slide-4
SLIDE 4

STUDY OVERVIEW

MAJOR TASKS Data Collection Capacity Analysis Develop Conceptual Alternatives

slide-5
SLIDE 5

EXISTING CONDITIONS

NW 12TH STREET

Urban Minor Arterial Industrial/Commercial Access to HEFT and to SR 836 / Dolphin Expressway Posted Speed 40 mph

slide-6
SLIDE 6

EXISTING CONDITIONS

NW 25TH STREET

County Road Urban Collector Urban Minor Arterial Industrial/Commercial Access to SR 826 / Palmetto Expressway Posted Speed 40 mph east of NW 79th Ave. 35 mph west of NW 79th Ave.

slide-7
SLIDE 7

EXISTING CONDITIONS

NW 36TH STREET / 41st STREET

County Road ‐ Urban Other Principal Arterial Commercial / Office – North Side Industrial / Commercial / Office / Residential – South Side Interchanges at SR 821 HEFT & SR 826 / Palmetto Expressway Posted Speed 40 mph

slide-8
SLIDE 8

EXISTING CONDITIONS

NW 117TH AVENUE

County Local Road parallel to SR821 /HEFT Adjacent to Canal on an Industrial / Commercial / Office zone Connected to NW 25th St. via Un‐signalized intersection | Dead end at NW 41st St. Posted Speed 40 mph

slide-9
SLIDE 9

EXISTING CONDITIONS

Deficient Level of Service

slide-10
SLIDE 10

EXISTING CONDITIONS

EXISTING OPERATIONAL CONDITIONS (OC)

High congestion – NW 36th Street Corridor Intersections next to SR826 / Palmetto – Worst OC Intersections next to SR 821 / HEFT – Better OC NW 25th Street Corridor Acceptable level of service Excess Capacity ‐ West of NW 87th Ave.

slide-11
SLIDE 11

PROJECT NEEDS

Severe Congestion due to Freight Movement

Need to reduce traffic congestion at: NW 25th Street / SR 826 Interchange NW 36th / 41st Street Corridor Local Roads NW 114th Avenue NW 115th Avenue

slide-12
SLIDE 12

STUDY ALTERNATIVES

6 Conceptual Alternatives Alternatives included other planned improvements:

New signal for NW 115th Avenue at NW 41st Street (MDC) 41st Street Interchange Modification at HEFT (Turnpike)

slide-13
SLIDE 13

STUDY ALTERNATIVES

Analysis Criteria

Capacity Improvements NW 117th Ave. Widening HEFT Off‐Ramp Relocation Bridge Construction Right‐of‐Way Impact Toll Facility Relocation Air Quality Noise Construction Community Cohesion Visual & Aesthetics

slide-14
SLIDE 14

STUDY ALTERNATIVES

No cost No right of way impacts Increased Congestion Decreased Air Quality No Direct HEFT Connection

slide-15
SLIDE 15

STUDY ALTERNATIVES

slide-16
SLIDE 16

STUDY ALTERNATIVES

slide-17
SLIDE 17

STUDY ALTERNATIVES

Medium Cost Connecting NW 25th Street to HEFT Improved Capacity on Roadway Network Maintains Community Cohesion Delay Savings Benefit Relocation of Toll Facility Impact on HEFT Right‐of‐Way Additional Weaving on HEFT North Bound Off‐Ramp Connecting NW 25th Street to HEFT Improved Capacity on Roadway Network No Impact on HEFT North Bound Off‐Ramp Delay Savings Benefit High Cost High Construction Impacts on NW 117th Avenue High visual and aesthetics impact

slide-18
SLIDE 18

STUDY ALTERNATIVES

  • Note: Annualized items for 20‐year period and 4% return rate

COST ESTIMATE AND BENEFIT‐COST ANALYSIS

slide-19
SLIDE 19

PREFERRED ALTERNATIVE

Alternative 5A (At‐grade) has been selected

as “Preferred Alternative”

Delay Savings Lower Cost Higher Benefit‐cost Ratio

slide-20
SLIDE 20

RECOMMENDATIONS

The Alternative 5A (At‐grade) is recommended to be included in the Florida Turnpike Enterprise Design Concept Report for HEFT/NW 41st Street Interchange or in a separate PD&E study. A more detailed capacity analysis is recommended to be included in the Design Concept Report and/or PD&E process. Additional intersection capacity improvements along NW 41st Street

slide-21
SLIDE 21

ADDITIONAL RECOMMENDATIONS

Signal Timing/Phasing Improvements

2 3 4 5 6 7