INTRODUCTION submitted by applicant 76 7672 72 Pro rogr gress - - PowerPoint PPT Presentation

Project No. 1 Presentation INTRODUCTION submitted by applicant 76 7672 72 Pro rogr gress ess Wa Way De Delt lta, a, BC BC MOT OTI Fi File le No No.: .: SF SFPR 7 Area Ar ea: 3.24 24 ha ha | 8.01 01 ac ac PID ID: 029


slide-1
SLIDE 1

INTRODUCTION

76 7672 72 Pro rogr gress ess Wa Way De Delt lta, a, BC BC MOT OTI Fi File le No No.: .: SF SFPR 7 Ar Area ea: 3.24 24 ha ha | 8.01 01 ac ac PID ID: 029 029-323 323-045 045 Cu Curr rrent ent Zo Zoni ning ng: I2 | A1

Project No. 1 Presentation submitted by applicant

slide-2
SLIDE 2

APPLICATION PROPOSAL

Proposed Future Land Use

Pro Propo posa sal

Amend Amend Reg Regional ional Growth Growth Strategy Strategy (RGS (RGS) from agricultural to industrial, and amend Future Land Use Plan – change land use designation of subject area from ‘A’ Agricultural to ‘I’ Industrial. Rezo Rezone ne the southern portion of the site from A1 (Agricultural) to I2 (Heavy Industrial) Of Official icial Comm mmunity unity Pl Plan n Am Amen endment dment to amend use designation from Agricultural to Industrial. Expand Expand th the Sanitary Sanitary Sewer Sewer Catchment Catchment Area Area to encompass the subject site

slide-3
SLIDE 3

ENVIRONMENTAL CONDITIONS

Ditches along the northern, eastern, and southeastern frontages of the site. An environmental assessment has been completed by Phoenix Environmental Consultants. The eastern and southeastern ditches require a 15.0m setback from top of bank under Riparian Area Regulation detailed assessment.

Ri Ripa pari rian an Ar Area ea Soil Soil Co Cond ndit itions ions

A Stage 1 and Stage 2 Preliminary Site Investigation has been completed by Hemmera Envirochem Inc. in March 2015 – site is not contaminated.

slide-4
SLIDE 4

SITE SERVICING

Subject site is not located within a sanitary catchment area. Incremental increase in flow can be accommodated within Delta’s existing sanitary sewer system. Amendment of the sewer catchment area to encompass the site is required for development

  • f this property.

Existing water, sanitary and storm services are available along Progress Way and are adequate to service the subject site.

slide-5
SLIDE 5

APPLICATION SUMMARY

Rezoning the property will resolve the issue of split zoned parcel Conforms with ALC decision Expansion of the sewer catchment area to allow connection

  • f

proposed industrial site to the municipal sanitary sewer system Proposed industrial use would be compatible with surrounding land uses adjacent to Progress Way Majority of the property is already zoned industrial Registering a drainage Statutory Right-of-Way along Eastern Perimeter Ditch