intelligent modular construction intelligent modular
play

Intelligent Modular Construction Intelligent Modular Construction - PowerPoint PPT Presentation

Intelligent Modular Construction Intelligent Modular Construction Elite Ventures | UAE Elite Ventures | South America Elite Ventures | PANAMA Fujairah Free Zone Colonia 993, 7th Floor Ave. Aquilino de la Guardia, PH Torre Banco General


  1. Intelligent Modular Construction Intelligent Modular Construction Elite Ventures | UAE Elite Ventures | South America Elite Ventures | PANAMA Fujairah Free Zone Colonia 993, 7th Floor Ave. Aquilino de la Guardia, PH Torre Banco General Fujairah, UAE - P.O. Box 4895 Montevideo, Uruguay - C.P. 11100 23th Floor, Office 2301 – Panama – Republic of Panama Phone: (+ 971 9) 22 82 792 Phone: (+ 598 2) 903 34 01/ 02/ 03 Phone: (+ 507) 396 3840/41/42 Fax: (+ 971 9) 22 82 793 Fax: (+ 598 2) 903 34 93 Fax: (+ 507) 396 3843

  2. OMAN HOTEL

  3. FILE NAME DRAWING TITLE SCALE PRESENTATION EV - OMN - 000 - A - R1 INDEX - EV - OMN - 001 - A - R1 PROGRAM AREAS - EV - OMN - 002 - A - R1 3D IMAGE - EV - OMN - 003 - A - R1 3D IMAGE - - R1 MASTERPLAN EV - OMN - 100 - A 1/500 ACCOMMODATION EV - OMN - 101A - FP - R1 1.0 ACCOMMODATION BUILDING 1 1/200 EV - OMN - 101B - FP - R1 1.1 STANDARD / DELUXE 1/50 EV - OMN - 101B - UD - R1 STANDARD / DELUXE - UNIT DESCRIPTION - EV - OMN - 102A - FP - R1 2.0 ACCOMMODATION BUILDING 2 1/150 EV - OMN - 102B - FP - R1 2.1 EXECUTIVE SUITE 1/50 EV - OMN - 102B - UD - R1 EXECUTIVE SUITE - UNIT DESCRIPTION - EV - OMN - 102C - FP - R1 2.2 SUITE 1/50 EV - OMN - 102C - UD - R1 SUITE - UNIT DESCRIPTION - EV - OMN - 102D - FP - R1 2.3 ROOM FOR PEOPLE W/ SPECIAL NEEDS 1/50 EV - OMN - 102D - UD - R1 ROOM FOR SPECIAL NEEDS - UNIT DESCRIPTION - COMMON BUILDINGS - FP - R1 BUILDING A - LOBBY EV - OMN - 103 1/150 EV - OMN - 103 - UD - R1 BUILDING A - UNIT DESCRIPTION - - FP - R1 BUILDING B - RESTAURANT & KITCHEN EV - OMN - 104 1/100 EV - OMN - 104 - UD - R1 BUILDING B - UNIT DESCRIPTION - - FP - R1 BUILDING C - BAR & FTINESS EV - OMN - 105 1/100 EV - OMN - 105 - UD - R1 BUILDING C - UNIT DESCRIPTION - FP - R1 BUILDING D - BACK OF HOUSE EV - OMN - 106 1/150 EV - OMN - 106 - UD - R1 BUILDING D - UNIT DESCRIPTION

  4. Project: OMA N 120 PE OPLE H OTE L PR OG RA M - AR E A S ELITE VENTURES F P 20' ISO 40' AR E A /U NIT SLOPE D R OOF TOTAL A RE A F P 20' ISO 40' PU RPOSE QU AN TITY qty qty sqm sqm sqm qty qty 1. G UE ST R OOMS 4 696,04 2784,2 168 BU ILDING TY PE 1 - STA N DA RD G UE ST R OOMS (TWIN BEDS) per Building 11 1,5 14,74 243,3 16,5 DE LUXE G U E ST ROOM (DOUBLE BEDS) per Building 17 1,5 14,74 376,0 25,5 1 76,8 corridors per building 1 397,74 397,7 24 BU ILDING TY PE 2 - SU ITE S per Building 2 3 14,74 88,5 6 E XE CU TIVE SUITE S per Building 3 4,5 14,74 199,0 13,5 ROOMS F OR DISA BLE D per Building 3 1,5 14,74 66,3 4,5 1 43,9 corridor per building 2. PUB LIC AR E A S 1 265,37 265,4 18 BU ILDING A - LOBB Y , R E C E PTION &F A CILITIE S 1 11 14,74 162,2 11 OF F IC E 1 1 14,74 14,7 1 LUG G AG E ROOM 1 1 14,74 14,7 1 BU SINE SS C E N TR E 1 2 14,74 29,5 2 RE TAIL STORE 1 2 14,74 29,5 2 PR AY E R R OOM 1 1 14,74 14,7 1 1 414,59 414,6 14 7 BU ILDING B - KITC HE N F OR 120 PE OPLE 1 3 29,74 89,2 3 2 2 29,74 119,0 4 FREEZER & DRY STORE 1 2 14,74 29,5 2 STORA GE ME SSING F A CILITY F OR 120 PE OPLE (*) 1 12 14,74 176,9 12 1 575,01 575,0 39 BU ILDING C - F ITNE SS R OOM 1 3 14,74 44,2 3 BA R 1 7 14,74 103,2 7 1 398,09 398,1 27 BU ILDING D - BA C K OF H OU SE - OF F IC E 1 2 14,74 29,5 2 E XE CU TIVE / A C COUN T / SALE S 1 6 14,74 88,5 6 LAU N DR Y 1 2 14,74 29,5 2 HOUSE K E E PING 1 4 14,74 59,0 4 LOCK E R R OOMS (ME N & F E MA LE ) 2 3 14,74 88,5 6 PR AY E R R OOM 2 1 14,74 29,5 2 CA F E TE RIA 1 5 14,74 73,7 5 MA INTE NA N CE / E NG IN E E R ING 1 2 14,74 29,5 2 RE C E IVIN G & PUR CH ASING / G AR B AG E 1 2 14,74 29,5 2 SLOPE D RF BU ILT AR E A F P 20' ISO 40' TOTA L - 4.835 sqm 290 C 7 C

  5. ACCOMMODATION BUILDING I - Quantity 4 Description Quantity - 20 FEET FLAT PACK UNIT 42 - Additional Roof: Corrugated sloped roof board 75 mm - rock wool insulation - both sides 0,42 mm steel - sheet, 100 kg/m3 with rain gutters & pipes. Slope: 20% Exterior Verandah: tiled floor and wooden structure with Treillage Panels w/ rhombus pattern and - pointed arches. - - Ceiling: Mineral wool acoustic panel. BEDROOM UNITS 11 - Standard guest room (twin beds) 17 - Deluxe guest room (double bed) NOTE 1: Lighting & Electricity Calculations - to be done by Engineering Consultancy. NOTE 2: Fire protection (hose reels, sprinklers, fire extinguishers & smoke detectors) to be defined in accordance with Oman Fire Regulations

  6. ACCOMMODATION BUILDING I - STANDARD / DELUXE Description Quantity Description Quantity - 20 FEET FLAT PACK UNIT 1,5 - Internet Connection - Additional Roof: Corrugated sloped roof board 75 m m - rock - wool insulation - both sides 0,42 m m steel sheet, 100 kg/m 3 with - - Sm oke detector - EQUIPMENT & FURNISHING rain gutters & pipes. Slope: 20% Exterior Verandah: tiled floor and wooden structure with - Bedside table * 1 - Treillage Panels w/ rhombus pattern and pointed arches. - Bedside/desk lam p * 2 FINISHINGS - Single bed * 2 - Spring Mattress 1000 x 2000 m m * 2 - Ceiling com position: External wainscot 0,5 m m galvanized and - painted steel sheet. Insulation 90 m m rock wool. Steam blocked: - Mattress under lay * 2 PE foil. Inner wainscot 18 m m PVC. - Single bed sheets & pillow cas es * 8 - Soft pillow 2 - Wallboard: Sandwich panel 60 m m , with rock wool insulation 50 - m m . - Inner wainscot: m df panel with wood pattern foil - Single bed blankets and bedspread * 8 - Sanitary area: Ceram ic tile Flooring - - Desk 1200 x 600 m m 1 - Lam inated Wood Flooring - - Arm chair 1 JOINERY - Des k Chair 1 - Sandwich panel exterior door 800 x 2100 m m , with door clos ers - Double door lockable Wardrobe 1 1 and key card lock system . - HD TV with wallstand 1 - PVC interior door 800 x 2100 m m 1 - Luggage rack 1 - PVC double glazed Sliding window 1100 x 1200 m m , with - Mini bar fridge 1 1 TOILETS m osquito net and internal curtains. - PVC Single Panel Window with extraction fan 500 x 500 m m 1 - Vanity counter with wash bas in 1 AIR CONDITIONING - Mirror 300 x 600 m m 1 - Split AC, hot and cool air. Capacity to be defined 1 - Shower Tray 1 LIGHTING & ELECTRICITY - Soap Dispenser 1 - 240V / 50Hz Distribution board - - Toilet 1 - Fluorescent fixture Light 2 - Toilet Paper Holder 1 - Dom e Light 1 - Clothes Hook 1 - Exterior Light on top of m ain door 1 - Waste Paper Bas ket 1 - Telephone Line - - Towel Rail 1 NOTE 1: A/C, Lighting & Electricity Calculations - to be done by Engineering Consultancy. NOTE 2: Fire protection (hose reels , sprinklers, fire extinguishers & sm oke detectors) to be defined in accordance with Om an Fire Regulations * NOTE 3: For Deluxe room 1 spring m attress 1800 x 2000 m m , 1 double bed, 2 bedside table, 2 beds ide lam p, 4 double bed sheets & pillow cases, 4 double bed blankets & beds pread, 1 m attress underlay.

  7. ACCOMMODATION BUILDING II- Quantity 1 Description Quantity - 20 FEET FLAT PACK UNIT 24 - Additional Roof: Corrugated sloped roof board 75 mm - rock wool insulation - both sides 0,42 mm steel - sheet, 100 kg/m3 with rain gutters & pipes. Slope: 20% Exterior Verandah: tiled floor and wooden structure with Treillage Panels w/ rhombus pattern and - pointed arches. - - Ceiling: Mineral wool acoustic panel. BEDROOM UNITS 1 - Suite (twin beds) 1 - Suite (double bed) 1 - Executive suite (twin beds) 2 - Executive suite (double bed) 2 - Room for people with special needs (single bed) 1 - Room for people with special needs (double bed) NOTE 1: Lighting & Electricity Calculations - to be done by Engineering Consultancy. NOTE 2: Fire protection (hose reels, sprinklers, fire extinguishers & smoke detectors) to be defined in accordance with Oman Fire Regulations

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend