Integrated service logistics to overcome every offshore challenge. - - PowerPoint PPT Presentation

integrated service logistics to overcome every offshore
SMART_READER_LITE
LIVE PREVIEW

Integrated service logistics to overcome every offshore challenge. - - PowerPoint PPT Presentation

Integrated service logistics to overcome every offshore challenge. For maximum yield, overcome a sea of challenges. The new generation of offshore wind farms is located far from shore, which means: Increased travel time for spare parts and


slide-1
SLIDE 1

Integrated service logistics to overcome every offshore challenge.

slide-2
SLIDE 2

For maximum yield,

  • vercome a sea of challenges.

The new generation of offshore wind farms is located far from shore, which means:

Unstable weather conditions Significant wave heights Increased travel time for spare parts and technicians Plants and wind turbines continue to increase in size

slide-3
SLIDE 3

Integrated service logistics are the solution.

SOV Floating warehouse and hub with walk-to-work turbine access Jack-Up Vessel For heavy component exchange CTV Flexible transport for diverse service tasks Helicopter Fast service response in difficult weather conditions

slide-4
SLIDE 4

Increases weather window for operations Service Operation Vessels (SOVs) are able to stay on-site for up to four weeks, for significantly diminished transport and transfer time. Innovative features make them the most effective way to service far-from-shore wind power plants.

60 people can live on board

60

SOV

90%

420 m2

by

420 m2 warehouse

for spare parts

slide-5
SLIDE 5

Jack-Up Vessels are self-elevating platforms used for complex heavy-lift tasks such as main bearing, gearbox, and blade exchanges – giving you peace of mind, whatever your asset size. Lifting height above deck is 96 m Can lift up to 400 tons Heavy-lift operations can begin 2 weeks from contract confirmation

Jack-Up Vessel

96 m

80

slide-6
SLIDE 6

Helicopters are used with other vessels for fast and wave-independent transfers directly to the top of the turbine, and enable a range of useful service tasks, including the transfer of technicians or spare parts and tools.

Helicopters

6x faster

than a CTV

12x faster

than an SOV Can operate in 88 km/h winds Versatile service ability

slide-7
SLIDE 7

Used for a variety of service tasks including transfer and transport, Crew Transfer Vessels (CTVs) are multipurpose, high-speed vessels designed for wind parks closer to shore. Backbone of

  • ffshore service

Continually updated tech Versatile service ability

CTVs

slide-8
SLIDE 8

For further information on these logistics solutions, please don’t hesitate to ask any of the Siemens Gamesa booth assistants. Visit the Siemens Gamesa Renewable Energy site to learn more about the diverse range of reliable wind energy services that will optimize your assets.

siemens.com/wind-service