Infrastructure Delivery Panel Paul Lindwall Commissioner Warren - PowerPoint PPT Presentation

Infrastructure Delivery Panel Paul Lindwall Commissioner Warren Centre, University of Sydney 28 April 2015 Productivity Commission Growth in living standards 1986-87 to 2012-13, per cent 6 3 0 -3 Real GDP per capita Real net national


  1. Infrastructure Delivery Panel Paul Lindwall Commissioner Warren Centre, University of Sydney 28 April 2015 Productivity Commission

  2. Growth in living standards 1986-87 to 2012-13, per cent 6 3 0 -3 Real GDP per capita Real net national disposable income per capita -6 1986- 1988- 1990- 1992- 1994- 1996- 1998- 2000- 2002- 2004- 2006- 2008- 2010- 2012- 87 89 91 93 95 97 99 01 03 05 07 09 11 13 Source: ABS (Australian System of National Accounts, Cat. no. 5204 , Nov 2013). Productivity Commission 2

  3. Contributions to growth in average incomes – forecast labour productivity growth Percentage points contribution, annual average 4 4 Forecast labour productivity growth (Treasury) 3 3 2 2 1 1 0 0 -1 -1 1960s 1970s 1980s 1990s 2000s to 2013 Decade to 2023 Labour productivity Labour utilisation Terms of trade Net foreign income Per capita income Source: PC estimates based on ABS, Australian System of National Accounts , 2012-13 , Cat. no. 5204.0, Table 1 & Treasury calculations. Productivity Commission 3

  4. Contributions to growth in average incomes – needed for long run GNI growth Percentage points contribution, annual average 4 4 Productivity growth needed to preserve long-run GNI per capita growth 3 3 2 2 1 1 0 0 -1 -1 1960s 1970s 1980s 1990s 2000s to 2013 Decade to 2023 Labour productivity Labour utilisation Terms of trade Net foreign income Per capita income Source: PC estimates based on ABS, Australian System of National Accounts , 2012-13 , Cat. no. 5204.0, Table 1 & Treasury calculations. Productivity Commission 4

  5. Key productivity trends 60 Cumulative growth Labour productivity since 1993-94, per cent Recent rise in LP only part of the story 30 Multifactor productivity Capital productivity 0 Continued decline Capital productivity is the major drag on Australia's (measured) productivity performance -30 1993-94 1995-96 1997-98 1999-00 2001-02 2003-04 2005-06 2007-08 2009-10 2011-12 Sources: ABS (Estimates of Industry Multifactor Productivity, Cat. no. 5260.0.55.002, Dec 2013). Productivity Commission 5

  6. Rome’s Cloaca maxima and Madrid’s Ciudad Real airport Still in use after Closed after 2600 years four years Productivity Commission 6

  7. An Ancient PPP contract Dr Robert Pitt, Deputy Director British School at Athens Temple of Zeus Basileus in Lebadeia Productivity Commission 7

  8. Expenditure on engineering construction work for the public sector (per cent of GDP) Productivity Commission 8

  9. Canal, rail, road Par UK Productivity Commission 9

  10. Autonomous car Productivity Commission 10

  11. Project selection Productivity Commission 11

  12. Understanding construction costs Bidding price, quality & timeliness v Intermediate inputs Market structure (cement, bitumen, steel) Costs v Cost of debt Factors largely v Economywide labour costs outside policy v Land costs control Productivity v Tunnelling v Scale economies v Firm innovation Procurement Industrial Regulations capabilities & Labour skills relations models Productivity Commission 12

  13. Funding • Well-designed user charges should be used to the fullest extend that they can be economically justified • There is a political economy problem in some jurisdictions with cost based user charges, especially roads, but increasingly energy • However, because of an absence of well- functioning product markets, significant externalities or distributional issues, some infrastructure can only be government-funded Productivity Commission 13

  14. Financing No shortage of private finance if the price is right • Public sector financing constraints largely self-imposed • if right projects are selected and properly funded Guarantees, concessional loans and tax concessions • are costly, lack transparency and potentially distortionary Only if implemented well does private sector • involvement (including financing) deliver efficiency gains − Private sector financing does not offset all fiscal pressures Productivity Commission 14

  15. Conclusion Transparent cost-benefit analysis for project selection • Better data collection • Apply user charges • Allocate risk appropriately • Build in flexibility • Credibly reserve corridors but allow alternative use • Better procurement practices • More efficient approval processes • Displacing bad projects with good ones • Managing procurement and financing/funding better • Privatise assets more efficiently managed by private sector • Productivity Commission 15

  16. Thank You www.pc.gov.au Productivity Commission 16

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.