IN INVES ESTMENT TMENT OP OPPO PORTUN TUNITIES ITIES IN IN - - PowerPoint PPT Presentation

in inves estment tment op oppo portun tunities ities in
SMART_READER_LITE
LIVE PREVIEW

IN INVES ESTMENT TMENT OP OPPO PORTUN TUNITIES ITIES IN IN - - PowerPoint PPT Presentation

IN INVES ESTMENT TMENT OP OPPO PORTUN TUNITIES ITIES IN IN THE HE EN ENER ERGY Y SEC ECTOR OR IN IN THE E UNITE ITED D NIA REP EPUBLIC IC OF T TAN ANZA ZANIA PROF. . DR. S. MUHON ONGO GO (MP) MIN INISTER ISTER OF ENER


slide-1
SLIDE 1

PROF. . DR. S. MUHON ONGO GO (MP) MIN INISTER ISTER OF ENER ERGY AN AND MINER INERALS ALS UNIT ITED ED REPU PUBLIC IC OF TAN ANZAN ANIA IA WAS ASHI HING NGTON ON DC, C, USA SA MONDAY, , 09 JU JUNE E 2014

IN INVES ESTMENT TMENT OP OPPO PORTUN TUNITIES ITIES IN IN THE HE EN ENER ERGY Y SEC ECTOR OR IN IN THE E UNITE ITED D REP EPUBLIC IC OF T TAN ANZA ZANIA NIA

slide-2
SLIDE 2

POLIC ICY, , LEGAL AL AN AND REGULA ULATORY FRAM AMEW EWOR ORKS KS OF THE HE POWER ER SUB-SE SECT CTOR

♦TANESCO Act,1964

♦ Petroleum (Exploration and Production) Act,1980 ♦EWURA Act, 2001 ♦National Energy Policy, 2003 ♦Occupational Safety and Health Act, 2003 ♦ Environmental Management Act, 2004 ♦Income Tax Act, 2004 ♦REA Act, 2005 ♦Electricity Act, 2008

♦ Petroleum Act, 2008

♦Public-Private Partnership Act, 2010 ♦ Natural Gas Policy, 2013 ♦Natural Gas Act (under preparation)

Identification footer with date 2

slide-3
SLIDE 3

CURRENT POWER SITUATION

3

Gener erat atio ion:

The installed capacity in the main grid is 1,583

  • MW. Hydro (35%), Natural Gas (33%) Oil (32%)

Off-grid stations total capacity is 76.4 MW

Highest grid system demand is 898.72 MW recorded in November 2013.

Transm nsmission ission Syst stem em :

Transmission network comprises of:

  • 2,732 km of 220 kV lines
  • 1,555.8 km of 132 kV lines
  • 578.7 km of 66 kV lines

Total= 4,866.5 km by the end of November 2013.

Distri tribut butio ion n Syst stem em :

Comprises of:

  • 17,021 km of 33 kV lines
  • 5,375 km of 11 kV lines
  • 34,513 km of LV
  • 11,124 distribution transformers
slide-4
SLIDE 4

ENERGY RESOURCES POTENTIAL

4

ENERGY SOURCE POTENTIAL DEVELOPED TO POWER

Coal: Kiwira, Mchuchuma, Ngaka, Rukwa and around Lake Nyasa

5-7 billion tons None

Natural Gas

46.5 tcf 501 MW

Geothermal: 58 sites including: Songwe (mbeya), Luhoi (Rufiji), Manyara, Lake Natron and Kisaki.

>3,000 MW None Hydro 4.7 GW 562 MW

slide-5
SLIDE 5

ENERGY RESOURCES POTENTIAL…..

5

ENERGY SOURCE POTENTIAL DEVELOPED TO POWER

Wind: Makambako, Singida, Litembe(Mtwara), Mkumbara (Tanga), Gomvu (Dar), Karatu (Manyara) and Mafia Average wind speed 5 - 8m/s

None

Solar

Average daily solar isolation

  • f 4.6/kWh/m2

About 6 MW

BIO-ENERGIES

UNLIMITED

35 MW from bagasse and woody residue

slide-6
SLIDE 6

Mkuranga 2007 (0.2 TCF) Kiliwani 2008 (0.07 TCF) Songo Songo 1974 (2.5 TCF) Mnazi Bay 1982 (5 TCF) Ntorya 2012 ( 0.178 TCF)

DISCOVERIES

TOTAL GIIP (December 2013): 46.5TCF

Deep Sea (2010-12) : 38.5 TCF

Total GIIP onshore = 8 TCF

6/9/2014

slide-7
SLIDE 7

COALFIELDS OF TANZANIA

slide-8
SLIDE 8

UR URANIU NIUM M DE DEPOS OSIT ITS ♦ MK

MKUJU JU PR PROJECT OJECT: : 13 137.3 .3 Mi Mill llion

  • n Lbs

bs

Namtumbo - 35.9 MILLION LBS Tunduru - 101.4 MILLION LBS

♦ MA MANY NYONI ONI PROJ OJECT ECT: : 19 Million Lbs (57 M tonnes)

es)

Prosp

  • specting

ecting Licenses nses (Regi egions) ns): Arusha usha, , Do Dodoma,

  • ma, Iring

nga, , Lindi ndi, , Ruv uvuma uma, , Mbe beya, , Morogor goro, , Mtwara ara, , Rukwa, , Shin inyanga anga, , Sing ngid ida and Tanga ga

  • 4. Namibia: 4,496 tons, 8.4% world’s production
  • 5. Ni

Niger er: : 4,198 tons, ns, 7.8% 11.

  • 1. Malawi:

wi: 670 t tons, ns, 1. 1.2%

  • 12. South

th Afric ica: a: 583 t tons, ns, 1. 1.1%

slide-9
SLIDE 9

REN ENEW EWABLE BLE EN ENER ERGIE GIES S

RENEWABLE ENERGY SOURCES WORLDWIDE AT THE END OF 2008 (SOURCE: REN21)

Available renewable energy The volume of the cubes represent the amount of available geothermal, hydropower, wind and solar energy in TW, although only a small portion is recoverable. The small red cube shows the proportional global energy consumption

slide-10
SLIDE 10

GEOTHERMAL POTENTIAL IN TANZANIA

slide-11
SLIDE 11

TRANSMISSION PROJECTS

Transmission Projects Distance (km) Year

400kV Singida – Arusha - Namanga 414 2016 220kV Kiwira – Mbeya 100 2016 400kV Kasama (Zambia) - Mbeya – Iringa 540 2018 400kV Shinyanga – Mwanza 140 2018 220kV Geita – Nyakanazi – Rusumo 228 2018 220 kV Kihansi -Ruhudji – Mufindi 250 2025 400kV Ngaka – Makambako 200 2017 220kV Somanga – Lindi - Mtwara 358 2017 400kV Mtwara – Songea 656 2021 400kV Nyakanazi– Kigoma – Sumbawanga 808 2015 400kV Mchuchuma – Mufindi 200 2018 220kV Rumakali – Makambako 200 2020

11

slide-12
SLIDE 12

FUTURE GRID MAP BY 2035

slide-13
SLIDE 13

REF EFORM ORM OF OF TANE NESCO SCO

♦ DI

DIFFERENC ERENCE E BETWEEN WEEN REFOR ORM M AND D OWNERS NERSHI HIP

♦ REFORMED

ORMED TANESC ESCO – KEY Y PLAYERS YERS 1.

  • 1. PUB

UBLIC LIC SECT CTOR OR

  • 2. PR

PRIVATE TE SECT CTOR

  • 3. PRIVATE

TE-PUBLIC PUBLIC PARTNERSHIP ERSHIP (PPP PP Act 2010) 0) ♦ DI DIAL ALOGU OGUE E ON THE HE REFOR ORM M BY STAK AKEH EHOLDERS: OLDERS: ROADM DMAP, , March ch 2014 ♦ GOVERNMENT’S APPROVAL: June 2014

slide-14
SLIDE 14

IMPROVEMENTS ON REVENUE COLLECTIONS

NE NEW REVEN ENUE UE COLL LLECTI ECTION ON MECHA HANISMS NISMS ♦Install tallation ation of Pre repa paid id met eters ♦ Purchasing sing of El Electricity ctricity throug rough mobi bile ph phones and nd ATM M (B (Banks) nks) ♦ Aut Automatic matic Met eter r Readi ding g (AMR) R) ♦ Electr tronic

  • nic Pa

Paym yments ents & A Appl pplications cations for for Ne New w Clients nts

Identification footer with date 14

slide-15
SLIDE 15

LOSS REDUCTION AND ENERGY EFFICIENCY PROGRAMME

Existing Projects:

  • Power factor Correction Program
  • Public awareness Campaign via Media and

Exhibition Projects to take off by January 2015:

  • Time Of Use Pricing
  • Distribution of Compact Fluorescent Lamp to D1

and T1 customers - (CFL)Program

Identification footer with date 15

slide-16
SLIDE 16

RECENT IMPROVEMENTS…

  • LOSS REDUCTION

Identification footer with date 16

decrease: 19% Above Target (BRN): 11%

slide-17
SLIDE 17

SCHEMATIC DIAGRAM SHOWING THE NATURAL GAS PROCESING PLANTS IN MTWARA AND SONGOSONGO AND THE UNDERCONSTRUCTION PIPELINE TO DAR ES SALAAM

slide-18
SLIDE 18

UTILIZATION OF THE NATURAL GAS

 Power generation: 3,000 MW  LNG (Onshor

shore) e)

 Smelting plants  Cement industries  Other industries  Household (Homes)  Motor vehicles (CNG)

G)

 Fertilizer production  Methanol plants  Plastics industries  Other Petrochemical Industries

slide-19
SLIDE 19

LIQUEFIED NATURAL GAS (LNG)

TAKE KES S UP ABOUT OUT 1/600TH H THE HE VOLUME ME OF NATURAL RAL GAS S IN THE E GASE SEOUS OUS STATE E

19

Natural Gas is condensed into a liquid at close to atmospheric pressure (maximum transport pressure set at around 25 kPa (4 psi) by cooling it to approximately −162 °C 1 TRAIN: 1 MILLION TONS PER ANNUM – 150 mcft/day – 25 yrs = 4.8 tcf

slide-20
SLIDE 20

DE DEEP EP SE SEA DR DRIL ILLING LING IN INVE VESTME STMENT NTS

slide-21
SLIDE 21

CONTACTS

 PA: En

  • Eng. Yahya Sama

mamb mba

yah

yahya.samam ya.samamba@mem.go.tz ba@mem.go.tz

y.samamb

samamba@y @yahoo.c hoo.com

  • m

 Pr

Prof

  • f Dr So

r Sosp speter er M.

  • M. Mu

Muhong

  • ngo

FGSA SAf, , FAAS, S, FASSA SAf, , FGIG IGE, E, FASI, I, FTWAS, , HonFCA CAGS, , HonFGSA SA, , HonFGS, , CGeol

  • l,

, EurGeol eol. (Offic icier ier,O ,Ordr dre des Palm lmes es Académ démiques ues)

s.muhong

muhongo@bol.co.tz

  • @bol.co.tz

sospe

speter er.muhon .muhongo@mem. go@mem.go. go.tz tz

21