Implications for timing system
- f possible CUC → Cryo-Mezzanine move
Implications for timing system of possible CUC Cryo-Mezzanine move - - PowerPoint PPT Presentation
Implications for timing system of possible CUC Cryo-Mezzanine move David Cussans Upstream DAQ regular meeting 14/Jan/20 Current Plan Cross-check and hot-swap redundancy by Two antenna (on at top of each shaft) Two GPS
Two antenna (on at top of each shaft) Two GPS receivers in CUC Normally one antenna-→ one GPS receiver
Option of third, free-running, Rb/Cs clock to act as “tie
Presenter Name | Presentation Title 2
1)Install current scheme in one of the four DAQ huts and run fibres to other 3 * Not nice - lots of fibre… 2)Keep GPS receivers in CUC in a small rack 3)Put GPS receivers on surface * Advantages
cost)
* Disadvantages
Presenter Name | Presentation Title 3
Presenter Name | Presentation Title 4
10 MHz IRIG-B IEEE1588... GPS Receiver... DAQ &... Master... MCH AMC Timing... Direct... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... uTCA Crate... Setup/Control/Monitoring ( 1 GBit/s ) Experiment... Crates in DAQ Hut 1000Base-BX... 1000Base-BX 1:2 Passive... 1:8... To timing endpoints... Master... MCH AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... IEEE1588... GPS Receiver... 10 MHz IRIG-B Fibre to hot-swap system Direct attach cable... link to Yates GPS Interface 1000Base-BX... link to Ross links... GPS Interface DAQ "Hut" on SP Cr... Surface Ross Yates Ethernet...Presenter Name | Presentation Title 5
Presenter Name | Presentation Title 6