Implications for timing system of possible CUC Cryo-Mezzanine move David Cussans Upstream DAQ regular meeting 14/Jan/20 Current Plan Cross-check and hot-swap redundancy by Two antenna (on at top of each shaft) Two GPS


slide-1
SLIDE 1

Implications for timing system

  • f possible CUC → Cryo-Mezzanine move

David Cussans Upstream DAQ regular meeting 14/Jan/20

slide-2
SLIDE 2

Current Plan

  • Cross-check and hot-swap redundancy by

 Two antenna (on at top of each shaft)  Two GPS receivers in CUC  Normally one antenna-→ one GPS receiver

  • Cross check between two systems

 Option of third, free-running, Rb/Cs clock to act as “tie

breaker” if two systems start to diverge.

  • All four modules SP, DP, MoO served from CUC

Presenter Name | Presentation Title 2

slide-3
SLIDE 3

What is the Issue?

  • Moving DAQ out of one central location breaks current scheme
  • Proposal being considered: one “DAQ hut” for each module
  • Number of different solutions. Three considered

1)Install current scheme in one of the four DAQ huts and run fibres to other 3 * Not nice - lots of fibre… 2)Keep GPS receivers in CUC in a small rack 3)Put GPS receivers on surface * Advantages

  • remove need for analogue transmission of GPS signals (reduces

cost)

  • puts more electronics on surface where it is more easily accessible.

* Disadvantages

  • Need more microTCA crates ( 2 per SP detector)
  • Need more fibres down shaft (but we should have many)

Presenter Name | Presentation Title 3

slide-4
SLIDE 4

GPS on surface

Presenter Name | Presentation Title 4

10 MHz IRIG-B IEEE1588... GPS Receiver... DAQ &... Master... MCH AMC Timing... Direct... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... uTCA Crate... Setup/Control/Monitoring ( 1 GBit/s ) Experiment... Crates in DAQ Hut 1000Base-BX... 1000Base-BX 1:2 Passive... 1:8... To timing endpoints... Master... MCH AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... AMC Timing... Timing... IEEE1588... GPS Receiver... 10 MHz IRIG-B Fibre to hot-swap system Direct attach cable... link to Yates GPS Interface 1000Base-BX... link to Ross links... GPS Interface DAQ "Hut" on SP Cr... Surface Ross Yates Ethernet...
slide-5
SLIDE 5

Presenter Name | Presentation Title 5

slide-6
SLIDE 6

Content

  • Topic 1

more text

  • Sub-topic 1.1
  • Sub-sub 1.1.1
  • Sub-sub-sub topic 1.1.1.1
  • Sub-topic 1.2
  • Topic 2
  • Topic 3

Presenter Name | Presentation Title 6