High Performance Computing Cluster 1 1 HPCC Hardware 20 Compute - PowerPoint PPT Presentation

High Performance Computing Cluster 1 1 HPCC Hardware 20 Compute nodes, 560 cores with room to expand All Nodes: Xeon Broadwell CPUs (2.6 GHz) 28 cores per node Infiniband EDR (Infinite Bandwidth) (Enhanced Data


  1. High Performance Computing Cluster 1 1

  2. HPCC Hardware 20 Compute nodes, 560 cores with room to expand – All Nodes: • Xeon Broadwell CPUs (2.6 GHz) • 28 cores per node • Infiniband EDR – (Infinite Bandwidth) (Enhanced Data Rate) (100 Gb/s) – Login Node: 1 • 64 GB DDR4 2400 MHz RAM – (DDR = Double Data Rate) • 4TB local hard drive array – Compute Nodes: 17 • 96 GB DDR4 2400 MHz RAM • 120 GB SATAII SSD (Solid State Drive) – Application Compute Nodes: 3 • 96 GB DDR4 2400 MHz RAM • 4 TB local hard drive + SSD as above – File Server: • 128GB DDR4 2400MHz RAM • 6TB drive array for OS • 55 TB data drive array (accessible to all nodes) • Infiniband EDR 2 2

  3. HPCC Software • OS: – Linux RedHat v7 • Compilers: – GNU Compiler • Program compilers and libraries – Intel Parallel Studio XE 2016 • Latest Intel toolkit for high performance applications • NetCDF, HDF5 – Network Common Data Form • Programming interface to scientific data files – HDF5 • Hierarchical Data Format – used to store image data • WRF-ARW v3.8.1 – Weather model (Atmospheric simulation system) • Scheduler: – TORQUE – Adaptive Computing • Provides control over batch jobs and distributed computing resources • Utopus Applications to be installed – R2 Renewable Generation Forecast Models – Energy Demand Forecast Model – Weather Insights for Environment (WISE) – Transactive Energy Management 3 3

  4. HPCC Analytics • Vermont Weather Analytics Center – Weather Visualization – WISE (Weather InSights Environment) – Demand Forecasting – Renewable Forecasting • OSIsoft Plant Information (PI) – Integrate asset data with maintenance applications – Predictive analysis on Telecom systems • Utilize idle processing time for other opportunities 4 4

  5. Utopus Transition Plan: VELCO Effort Start Date GOAL S Ke y T ask Planne d T ime line Effort End Date  e b 24 th – Ma rc h 10 th : VE L CO Ope ra tio na l • Se r a tiona l Runs): F Infr a str uc tur e ve r Cle a nup (no pla nne d impa c t to Ope r Infra struc ture : De e p T hunde r Re mo ve a ny so urc e fro m DT se rve r, te st / va lida te DT a nd do wnstre a m mo de ls. T r a nsition + De ma nd F o re c a sting + Pre pa re fo r mo ve Re ne wa b le F o re c a sting + file • Se r Shutdown: 13 th Ma r ve r c h : Bring do wn De e p T hunde r se rve r a fte r 0z run; upda te s to VE L CO se rve r • Se r Move : 13 th Ma rc h ve r : 14 th Ma rc h - 19 th Ma rc h: n/ w • VE L CO se r ve r br ing up a t the ne w da ta c e nte r se tup; fire wa ll se tup; IP a ddre ss se tup; Re c o nfig ure the se rve rs • F ir st Run of DT : 20 th Ma r c h* • Se r Re build: 1 st Ma r c h – 8 th Ma rc h: Ne w L Ye llo w Zo ne Infra struc ture : ve r ic e nse s ne e de d fo r a ll s/ w. Opus Opus Infra struc ture + Opus pla tfo rm re b uild Applic a tio ns (SE DA + PL M) • Ye llow Zone Build: 12 th Ma rc h – 20th th Ma r c h : n/ w se tup; fire wa ll se tup; IP a ddre ss se tup  e b – 13 th Ma rc h: Mo ve to te mpo ra ry We e kly tra c k me e ting s; • 2 We e k T a c k me e ting s: 27 th F We e kly T r a c k r a nsition – No tr disc ussio ns a nd R&D spa c e ; Se tup n/ w, da ta c e nte r a c c e ss. Se tup pho ne s a nd c o nfe re nc e line s; Me e ting T r a nsition Se tup e ma il ids a nd la pto ps. Co mple te UI jo ining fo rma litie s • Post T a nsition: 14 th Ma r r c h : We e kly tra c k me e ting s o n sc he dule • We e kly PM Me e ting : As pla nne d; T a run to jo in the te a m to he lp ma na g e the Uto pus ta sks a nd suppo rt L lo yd.  S/ W de ve lo pme nt pla ns fo r • Impa c t on S/ W de ve lopme nt a nd de live r y: 6 st Ma r c h - 10 th Apr il : Alig n a nd T r a c k s/ w e a c h o f the fo ur tra c ks se g me nt a ll IP a nd s/ w pe r UI sta nda rd (re mo ving IBM he a de rs, ma na g ing De live r y lic e nse d s/ w, se tting up a c c e ss to s/ w). Se tup ne w de v-o ps e nviro nme nt with ne w o pe ra ting syste m, ne w s/ w, UI he a de rs e tc . All s/ w de ve lo pme nt pla ns will mo ve b y 5 we e ks.  Se tting up VE L CO h/ w fo r • Sta rt e ffo rt fro m 21 th Ma r c h . Se e de ta ils o n the T ra c k 4 time line VE L CO De e p T hunde r + Infr a str uc tur e do wnstre a m a na lytic s buildout * Utopus and IBM Deep Thunder team will make every effort to complete the task sooner 5 5

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.