Harper College Outdoor Amphitheater Project Committee of the Whole Feb. 18, 2015 H ARPER L AKE D EVELOPMENT Z ONE N N Future Building New Access Pedestrian Mall Addition/Renovation Existing Access S ITE I MPLEMENTATION P ROJECTS N


  1. Harper College Outdoor Amphitheater Project Committee of the Whole Feb. 18, 2015

  2. H ARPER L AKE D EVELOPMENT Z ONE N N Future Building New Access Pedestrian Mall Addition/Renovation Existing Access

  3. S ITE I MPLEMENTATION P ROJECTS N Phase 1 Outdoor NEW Phase 2 Amphitheater Gathering Space Node

  4. O UTDOOR A MPHITHEATER : R ECOMMENDED D ESIGN C ONCEPT STAGE AND CANOPY RAMPS (2) GREAT LAWN MAIN WALK LIGHT POLE D BLDG. D ACCESS N BLDG. E ACCESS

  5. S ITE I MPLEMENTATION P ROJECT S CHEDULE – 2014-2016 Date (approx.) Task Item: 1. Sept. ’14-April ’15 1. Engineering & Design Period 2. May ‘15-Apr.’16 2. Construction Period 3. Spring ‘16 Graduation 3. Outdoor Amphitheater Complete

  6. O UTDOOR A MPHITHEATER - R ECOMMENDED C ONCEPT

  7. D ESIGN P ARAMETERS Site Design • Large, flexible lawn area • Paving layout linked to buildings and new E-W circulation spine • Stage located near Lake Harper • Accessible • Building D Amenities: -Lower pre-function patio - Stair/ramp/patio combo at D north door Stage Design • Organic stage shape • Canopy functions as sun shade and backdrop • Seating flexibility; no permanent seating • Arc layout for seating orientation to stage • Dual ramp access to stage

  8. S TAGE : R ECOMMENDED C ONCEPT

  9. A MPHITHEATER L ANDFORM AND S IGHTLINES Considerations • Sightlines • Accessibility • Shade

  10. S UN /S HADE Stage Canopy Tent and/or Shade Tree Zones Graduation, 11 a.m. N Indoor Monitors for Remote Viewing (Bldg A,D,E)

  11. B UILDING D A CCESS : R ECOMMENDED D ESIGN C ONCEPT

  12. Thank You!

  13. Back Pocket Slides

  14. C AMPUS S ITE F URNISHINGS P ALETTE Current Furnishings Palette NEW Pedestrian Light Poles with Changeable Banners

  15. P LANT P ALETTE

  16. C ONTEXT : C ONSTRUCTION Turnaround and Walks Remain As Is …Until Future Project Implementation Period Ending 2017 Bldg A, Construction thru 2017

  17. B UILDING D A CCESS : R ECOMMENDED D ESIGN C ONCEPT STAIRS RAMP DOOR AND CANOPY UPPER D PATIO ATRIUM N LOWER PATIO (PRE-FUNCTION SPACE)

  18. B RIDGE C ONCEPT

  19. C ONTEXT : C ONCEPT P EDESTRIAN M ALL Art Garden Outdoor Amphitheater Student Center Courtyard

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.