great shelford parish council big issues jan 2018 highways
play

Great Shelford Parish Council Big Issues Jan 2018 Highways 1. - PDF document

Great Shelford Parish Council Big Issues Jan 2018 Highways 1. Update on forthcoming works 2. Local Highways Initiatives 3. Refreshing Existing White Lines 4. APMs 5. Other Works in hand 6. Items on the PC Radar 7. Open discussion Page 1 of


  1. Great Shelford Parish Council Big Issues Jan 2018 Highways 1. Update on forthcoming works 2. Local Highways Initiatives 3. Refreshing Existing White Lines 4. APMs 5. Other Works in hand 6. Items on the PC Radar 7. Open discussion Page 1 of 16

  2. Page 2 of 16

  3. Restrictions Westfield and Stonehill Roads Page 3 of 16

  4. Restrictions on High Green Page 4 of 16

  5. Restrictions on Tunwells Lane Page 5 of 16

  6. Restrictions Buristead Road Page 6 of 16

  7. Restrictions Ashen Green and High Strret Page 7 of 16

  8. Restrictions Woollards Lane East Page 8 of 16

  9. Restrictions Woollards Lane West Page 9 of 16

  10. Restrictions Church Street Page 10 of 16

  11. Restrictions on Hinton Way Page 11 of 16

  12. Great Shelford 20 mph Limit Page 12 of 16

  13. LHI (Local Highway Initiatives) Scheme run by CCC annually, villages bid for monies to fund highways issues upto £15,000. LHI 2016 – we were granted funding for the new crossing in Woollards Lane.(£10k) LHI 2017 – we were granted funding for two flashing lights on Church Street for the school (£4.5k) LHI 2018 – we have applied for funding to undertake a survey of Granhams Corner to improve safety. Page 13 of 16

  14. Refreshing white lines When the works on the crossing in Woollards is being undertaken we are hoping to have a number of white lines refreshed in the village. Cambridge Rd No 166 54mtrs Cambridge Rd Care Home 36mtrs Cambridge Rd No 169 25mtrs Cambridge Rd No 75 20mtrs High Green Old PO area 200mtrs Cambridge Rd / Granhams junction hump 15mtrs Tunwells / High St Junction 50mtrs Cambridge Rd No 88 150mtrs Cambridge Rd / Granhams Junction 40mtrs High Street Crossing 80mtrs Tunwells Lane / after High St junction 100mtrs Cambridge Rd No 194 30mtrs Cambridge Rd / Granhams Bridge 80mtrs Ashen Green 80mtrs High Green No parking garage side 30mtrs High Green / Granhams junction 80mtrs Cambridge Rd No 188 25mtrs Cambridge Rd No 216 12mtrs Cambridge Rd opposite Westfield 40mtrs Cambridge Rd No 183 40mtrs Cambridge Rd No 108 57mtrs Cambridge Rd No 143 5mtrs Cambridge Rd No 82 20mtrs Cambridge Rd No 104 40mtrs Cambridge Rd Scotsdales 100mtrs Cambridge Rd No 202 71mtrs Page 14 of 16

  15. APM’s (Access Protection Markings) When the works on the crossing in Woollards we are hoping add a number of APM’s APM High Street Square and Compass 8mtrs APM High Street Butchers (No43) 8mtrs APMs Maris Green (about 5 properties) Outside 1,7,8/9,10,28,29.30,31 -- 56mtrs APM 64 High Street Outside to protect dropped kerb 8mtrs APM 3 Hinton Way Outside to protect dropped kerb 8mtrs APM 47 Hinton Way Outside to protect dropped kerb 8mtrs APM 49 Hinton Way Outside to protect dropped kerb 8mtrs APM 5 and 5A Woollards - Peter Duncan request 26.08.17 Outside to protect dropped kerb 10 mtrs Page 15 of 16

  16. Other Works in hand.  Refreshing the parking bays in the McColls car-park  Refreshing the “disabled bay” in the Memorial Hall car-park  30mph roundel at Shelford Bottom  We now have 2 SID ( S peed I ndicator D evices) and have identified (and agreed with Balfour Beatty and CCC) another 6 locations. This gives a total of 12 locations which we will rotate the SID’s around, they normally stay in a location for 4 weeks. The units are “portable” and are battery powered so dependent on traffic flows they may not always indicate on the 4 th week.  No Through Road sign on Spinney Drive  Widening the pavement in Woollards Lane near No 39  Wooden bollard to discourage vehicles mounting the pavement near Church St Barns entrance in Church Street  High Green : Relining the layby opposite the Old Post Office as it’s confusing  High Green : installing bollards from the bus-stop to the Mini garage entrance to prevent parking on the pavement  High Green: installing bus stop indicator boards (expected March 2018) Page 16 of 16

  17. Items on the PC radar  Parking in the village o We will be creating additional parking in the High Street and Maris Green as part of the works in Feb o As the Playscape plans develop we will be re-evaluating the Memorial Hall car-park, we intend to knock down the boiler house which will provide an additional 4/5 spaces. o The dynamics of parking will change if the Co-op moves and the Lloyds Closure takes place o The PC continues to pressurise SCDC to de-criminalise parking so we could have wardens, if progress is too slow we do have the option of “charging” for parking on McColls and the Memorial Hall.  Future TROs (traffic regulation orders) o If we wish to add / remove any parking restrictions or undertake any other highway related issues we generally have to ask the CC to raise a TRO. Because of the advertising and consultation requirements the cost can be high, hence we try to bulk requests together, our list at present is: TROs Future Cherry Trees DYL's at entrance to prevent parking which restricts width for emergency vehicles Poplar Close DYL's at the end of the road to prevent parking and enable vehicles to turn round High Green Removal/rejigging of parking outside the Old Post Office Hinton Way Monitor parking on eastern side, if a problem DYLs  Others o Monitor the general poor repair of the A1301 o Consider safe crossing point in Cambridge Road o Pressurise the CC on potholes in minor roads and footpaths o Consider issues raised in the Neighbourhood Plan o Identify white lines in need of refreshing Page 17 of 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.