Future Outlook for Demand Side Flexibility
Cian McLeavey-Reville Andy Wainwright Sophie Hind
Future Outlook for Demand Side Flexibility Cian McLeavey-Reville - - PowerPoint PPT Presentation
Agenda Session 3: Future Outlook for Demand Side Flexibility Cian McLeavey-Reville Andy Wainwright Sophie Hind SO Innovation Power Responsive Flexibility Forum, October 2018 The SO Innovation process enables rapid project development 3
Cian McLeavey-Reville Andy Wainwright Sophie Hind
Power Responsive Flexibility Forum, October 2018
3
4
The ‘Bad’ ▪ Costs: project and full implementation / rollout costs ▪ Risks: overspend, 3rd party, technology, resource, customer ▪ Existing activities: what has already been done? The ‘Good’ ▪ Technical merit: does the project make technical sense? ▪ Benefits: type and quantification ▪ Strategic relevance: how well does it fit our strategy?
5
Network Innovation Competition (NIC) ▪ Annual competition between all network
£20m gas) ▪ Development and demonstration only ▪ Typically multi-party, several million pounds, 3-4 years Network Innovation Allowance (NIA) ▪ Annual pot of money ▪ Research, development and demonstration ▪ Typically £300-400k, 6-18 months (no constraints) ▪ 75% of NIA spend must be external to SO ▪ Strict rules around treatment of IP Other sources of funding ▪ Can offer support to third parties seeking funding
6
▪ First ever SO innovation strategy published in 2018/19 ▪ Sets out SO innovation priorities, and how we plan to work with industry partners to deliver against them ▪ Currently refreshing strategy for publication in 2019
7
8
nationalgridso.com National Grid SO, Faraday House, Warwick Technology Park, Gallows Hill, Warwick, CV346DA
Andy Wainwright Business Lead Whole Electricity System
11
The energy landscape is changing to meet the challenges of; Decarbonisation Decentralisation Digitisation
excluding small domestic, of which almost 50 % renewables
applications processed in 2016
in the South for much of the summer 18
12
We believe that facilitating whole electricity system outcomes will ensure that industry arrangements develop in a way that maximises consumer value Providing thought leadership
Outcomes’ Working with others
project Developing new ways of working
the ESO needs to change
13
Facilitating whole electricity system outcomes will ensure that industry arrangements develop in a way that maximises consumer value. This can be achieved through a focus on six key areas.
Consumer Value
Markets Operability Innovation Technology Governance Options Development
We believe in 2030;
basis irrespective of ownership boundaries.
be open to a full range of participants, facilitating both market and asset solutions.
achieved, irrespective of the ESO or DSO performing the analysis.
14
14
The Worlds
industry structures in a decentralised, digitised , decarbonised energy landscape
system operators should be neutral facilitators of flexibility markets
who these neutral market facilitators should be
Ofgem’s work on Forward Looking Charges and Access Arrangements
The Actors
described through the eyes of a broad range of stakeholders referred to as actors
Suppliers, Aggregators and Customers
The consultation has closed with around 50 responses being
published shortly on the ENA website.
http://www.energynetworks.org/electricity/futures/open-networks-project/future- worlds/future-worlds-consultation.html
BACK COVER DESIGN Disclaimer text for back cover? Will both addresses be on the back?
nationalgrideso.com Faraday House, Warwick Technology Park, Gallows Hill, Warwick, CV346DA
17
aggregated units.
Project TERRE: Replacement Reserves Product (RR) Project MARI: Frequency Restoration Reserves with manual activation (mFRR)
Activation
Lead Party and register “Secondary BMUs”
for GB market participants to compete in
clear pricing approach
for “non-BM participants”
balancing costs of €13 million per year for GB
19
Feb 2019- Pre-registration
Aug 2019- Parallel run testing of the project TERRE platform (LIBRA) Dec 2019- Project TERRE Go-Live Dec 2021- Project MARI Go-Live
website
website
(Balancing Settlement Code)
(Grid Code)
Jan 2018
Project TERRE industry day 2. 11th December
nationalgrideso.com National Grid ESO, Faraday House, Warwick Technology Park, Gallows Hill, Warwick, CV346DA