Full Network Model (FNM) Monthly Effort Management Ankit Mishra - PowerPoint PPT Presentation

Full Network Model (FNM) Monthly Effort Management Ankit Mishra Sr. Advisor, EMS-Information Technology 6/26/2020 ISO Public ISO Public Agenda Highlight the variability in CIM Modeling effort and planning challenges Identify win -


  1. Full Network Model (FNM) Monthly Effort Management Ankit Mishra Sr. Advisor, EMS-Information Technology 6/26/2020 ISO Public ISO Public

  2. Agenda • Highlight the variability in CIM Modeling effort and planning challenges • Identify “win - win” scenarios for balancing the CIM modeling effort between CAISO and the CIM model entities ISO Public Page 2

  3. Quarterly to Monthly Model Transition • The monthly model schedule has been implemented in 2020 http://www.caiso.com/Documents/FullNetworkModelSchedule2020ISO.pdf ISO Public Page 3

  4. Monthly Model Implementation Process Weeks ISO Public Page 4

  5. Monthly Model Experience CIM Entity Model Work 400 14 350 12 300 10 250 8 200 6 150 4 100 2 50 0 0 20M3 20M4 20M6 20M7 20M8 Entities Projects Observations: - All entities are submitting CIM files whereas the total number of changes are less - There is variability in the number of CIM entities submitting the files in each model - There exist peaks and valleys in the number of changes being implemented in each model - Additional CIM entities are being on-boarded ISO Public Page 5

  6. Discussion Topics • CIM Modeling is a newer technology and CAISO and the CIM entities are at the cutting edge of this new way of modeling • The peaks and valleys in the scope projects present interesting challenges in managing the effort ISO Public Page 6

  7. Questions • Do the entities anticipate CIM model submission every model? • Do the entities feel an obligation to provide a CIM model in every model cycle? • Variability in the scope creates planning challenges: – Valley efforts represent wasted time and inefficiencies – Peak efforts represent potential delays in the model deployment – Are there possibilities to schedule CIM model submissions from entities in such a way to balance the effort and remove inefficiencies from the Western Interconnection Model upgrades? ISO Public Page 7

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.