FM 1187 IMPROVEMENTS CSJ: 1330-01-068 Chisolm Trail Parkway to McCart Avenue/BF 1187C September 5, 2019 FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 WELCOME FM 1187 7 IMPR PROVEM VEMENT ENTS Chish sholm


  1. FM 1187 IMPROVEMENTS CSJ: 1330-01-068 Chisolm Trail Parkway to McCart Avenue/BF 1187C September 5, 2019 FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019

  2. WELCOME FM 1187 7 IMPR PROVEM VEMENT ENTS Chish sholm lm Trai ail Pa Parkw rkway y to to McC cCar art Avenue enue/B /BF F 1187C 7C FORTH WORTH DISTRICT PUBLIC MEETING SEPT PT. . 5, 2019 19 6 P.M M - 8 P.M. M. FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 2

  3. Meeting Purpose Present, discuss and receive public comments on the proposed reconstruction and widening of approximately 3 miles of FM 1187 from Chisholm Trail Parkway to McCart Avenue/BF 1187C. The proposed improvements would reconstruct and widen FM 1187 from an existing two-lane roadway with center turn-lane to a four-lane roadway with a curbed center median. Two proposed alternatives can be viewed on detailed roll plots. FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 3

  4. Project Purpose • Improve safety Projected Average Daily Traffic Volumes 30,000 25,000 • Increase capacity and accommodate 27,150 150 Vehicles per day 24,350 350 20,000 increasing travel demand – now and in the 15,000 16,600 600 future 10,000 5,000 0 2021 2041 2051 • Improve connectivity in the region Data from TP&P Traffic Analysis for project area, 8/3/2017 • Add shared-use lanes and sidewalks FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 4

  5. Improving Connectivity & Regional Mobility Construction of this project and a separate project from McCart Avenue to 35W would provide a complete connection between two major freeways. The segment between Chisholm Trail Parkway and 35W would be a four lane, divided roadway with select grade separated intersections. Separate project from McCart Chisholm Trail Parkway Avenue to 35W to McCart Avenue/BF 1187C FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 5

  6. Existing FM 1187 STEP 1: Need for the study is identified and study begins STEP 2: TxDOT develops and evaluates many potential alignment options based on engineering factors and known environmental constraints STEP 3: TxDOT presents to the public the project need, possible roadway options, and 5 draft freeway alignment options to the public in Spring 2018,, STEP 4: More than 4,000 people and key stakeholders provide input  One lane in each direction and a turn lane STEP 5: TxDOT analyzed input and continued evaluation tasks  Roadway is 54’ wide STEP 6: TxDOT refined alignment options  Current ROW width is 90’ wide STEP 7: TxDOT is presented revised alignment options today for your input  No shared-use lanes and sidewalks  Center turn lane FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 6

  7. Proposed Typical Section – FM 1187  2 lanes in each direction  Generally 168’ ROW width that includes areas for lanes to be added in the future that are not a part of this project  Shared-use lanes and sidewalks  Curbed center median FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 7

  8. Proposed Typical Section – Future Intersections STEP 1: Need for the study is identified and study begins STEP 2: TxDOT develops and evaluates many potential alignment options based on engineering factors and known environmental constraints STEP 3: TxDOT presents to the public the project need, 3 possible roadway options, and 5 draft freeway alignment options to the public in Spring 2018 STEP 4: More than 4,000 people and key stakeholders provide input  At Hulen Street and FM 1902, TxDOT is proposing to construct roadway that would accommodate a future intersection with overpass. STEP 5: TxDOT analyzed input and continued evaluation tasks STEP 6: TxDOT refined alignment options  ROW widths at those locations are 300’  Shared-use lanes and sidewalks STEP 7: TxDOT is presented revised alignment options today for your input  Curbed center median FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 8

  9. Key Factors Being Evaluated Input highlights over 4,000 responses from all over the county 2,300 from mckinney No impacts to Section 4(f) and/or Parks and Wildlife Code, Chapter 26 Resources have been identified. Environmental documentation will be presented in Fall 2020 at a Public Hearing. FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 9

  10. Estimat imated ed Projec ect t Sched edule Public Hearing – presentation of preferred alternative & environmental documentation Fall 2020* STEP 1: Need for the study is identified and study begins Anticipated approval of environmental documentation and schematic design completion STEP 2: TxDOT develops and evaluates many potential alignment options based on engineering factors and known environmental Spring 2021* constraints STEP 3: TxDOT presents to the public the project need, 3 possible roadway options, and 5 draft freeway alignment options to the Right of way preservation/acquisition public in Spring 2018 Fall 2022* Utilities coordination Winter 2024* STEP 4: More than 4,000 people and key stakeholders provide input STEP 5: TxDOT analyzed input and continued evaluation tasks Construction begin 2024* STEP 6: TxDOT refined alignment options Construction End STEP 7: TxDOT is presented revised alignment options today for your input 2027* *All dates/years provided are estimates and subject to change. FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 10

  11. Thank You! PLEASE SUBMIT A COMMENT FORM BY FRIDAY, , SEPT. . 20 PLEASE FILL OUT A COMMENT FORM. FOR MORE INFORMATION CONTACT: CONTACT THE FOLLOWING FOR MORE INFORMATION: JIM LANG, P.E. TONY SCHMITT, P.E. TXDOT PROJECT MANAGER CONSULTANT PROJECT MANAGER JAMES.LANG@TXDOT.GOV TONY.SCHMITT@BURNSMCD.COM (817) 370-6760 (972) 455-3130 FM 1187: Chisholm Trail Parkway (SH121) to McCart Avenue September 5, 2019 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend