Field Cage Design for protoDUNE - Ra hul Sha rma FC Design Status - - PowerPoint PPT Presentation

field cage design for protodune
SMART_READER_LITE
LIVE PREVIEW

Field Cage Design for protoDUNE - Ra hul Sha rma FC Design Status - - PowerPoint PPT Presentation

Field Cage Design for protoDUNE - Ra hul Sha rma FC Design Status T o p Pa ne ls: De sig n c ho ic e is 2 I -b e a m de sig n with b ra c ing b e twe e n I b e a ms. o I nte g ra tio n with APA a nd CPA in wo rks Da n We nma n


slide-1
SLIDE 1

Field Cage Design for protoDUNE

  • Ra hul Sha rma
slide-2
SLIDE 2

FC Design Status

  • T
  • p Pa ne ls:
  • De sig n c ho ic e is 2 I
  • b e a m de sig n with b ra c ing b e twe e n I

b e a ms.

  • I

nte g ra tio n with APA a nd CPA in wo rks – Da n We nma n is de sig ning APA b ra c ke t a nd b a se d o n his input mino r de sig n c ha ng e s ma y ha ppe n (re mo ving o f b utc h pla te fo r a c c e ss). CPA b ra c ke t de sig n a lmo st finishe d

  • E

nd Wa ll Pa ne ls:

  • De ta ile d de sig n 90% c o mple te e xists fo r 2 c o nc e pt. Ne e ds to b e fina lize d

a fte r disc ussio n with the g ro up.

6/ 8/ 2016 pro to DUNE F C De sig n 2

slide-3
SLIDE 3

FC Top Panel

6/ 8/ 2016 pro to DUNE F C De sig n 3

slide-4
SLIDE 4

FC Top Panel

6/ 8/ 2016 pro to DUNE F C De sig n 4

slide-5
SLIDE 5

FC Top Panel (Splice Joint Pin Design)

6/ 8/ 2016 pro to DUNE F C De sig n 5

slide-6
SLIDE 6

Splice Joint Top View

6/ 8/ 2016 pro to DUNE F C De sig n 6

slide-7
SLIDE 7

FC Top Panel (Splice Joint)

6/ 8/ 2016 pro to DUNE F C De sig n 7

slide-8
SLIDE 8

Top Panel Cross Bracing

6/ 8/ 2016 pro to DUNE F C De sig n 8

slide-9
SLIDE 9

G10 Pin Testing

6/ 8/ 2016 pro to DUNE F C De sig n 9

slide-10
SLIDE 10

Stress Analysis

6/ 8/ 2016 pro to DUNE F C De sig n 10

slide-11
SLIDE 11

FC Top Panel +CPA Hinge

6/ 8/ 2016 pro to DUNE F C De sig n 11