SLIDE 1
12/4/19
- T. Yang | ProtoDUNE-SP
2
- First draft of ProtoDUNE-SP performance paper is
almost ready.
- 74 pages and 59 figures.
Status of ProtoDUNE-SP Performance Paper Flavio, Tingjun, Tom - - PowerPoint PPT Presentation
Status of ProtoDUNE-SP Performance Paper Flavio, Tingjun, Tom ProtoDUNE DRA Meeting Dec 4, 2019 First draft of ProtoDUNE-SP performance paper is almost ready. 74 pages and 59 figures. 2 12/4/19 T. Yang | ProtoDUNE-SP Plan to
12/4/19
2
almost ready.
12/4/19
3
12/4/19
4
A 0.5 GeV/c positron candidate. A 6 GeV/c positron candidate.
12/4/19
5
A 1 GeV/c pion candidate. A 6 GeV/c pion candidate.
12/4/19
6
A 1 GeV/c stopping proton candidate. A 2 GeV/c pion charge exchange candidate. A 6 GeV/c kaon candidate.
12/4/19
7