FEASIBILITY STUDY BLIND BROOK-RYE UNION FREE SCHOOL DISTRICT Presenters CS Arch Architecture | E ngineering | Construction Management Thomas M. Ritzenthaler AIA Vice President / Principal-in-Charge Heather Fagans Chaze azen En Engin
Presenters
CS Arch Architecture | E ngineering | Construction Management
Thomas M. Ritzenthaler AIA – Vice President / Principal-in-Charge Heather Fagans
Chaze azen En Engin gineer eering, PC
George Cronk, PE – Project Manager
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
- Feasibility Study Review
- Safety & Security Upgrades
- Site Lighting
- Capital Projects
- Next Steps
Agenda
Feasibility study
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
BMP Ridge Street School
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Middle / High School
Safety & Security
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Security Vestibules
- Creation of “Man T
rap” to provide secure location to screen visitors
- S
eparate security office for the safety of security personnel
- Access control door hardware
- Visitor identification program
- Video intercom to exterior
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Security Vestibules
- BMP Ridge S
treet S chool
Existing Entry and Main Office Proposed Entry and Main Office Estimated Project Cost: $117,911
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Security Vestibules
- Middle / High S
chool
Existing Entry and Main Office Proposed Entry and Main Office Estimated Project Cost: $61,200
Site Lighting Recommendations
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Site Lighting Plan
- Initial installation cost, LED vs. HID
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Site Lighting Plan
- Initial installation cost, LED vs. HID
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
LED vs. HID Site Lighting
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis
- Initial installation cost, LE
D vs. HID
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis
- Maintenance Cost
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis
- Operational Cost
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
15 Year Life Cycle Analysis
- Cost S
ummary
Capital Projects
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Middle / High School
- Additional Classrooms at second floor
- Previously constructed for future second floor
- Relatively inaccessible for large equipment
- Additional Classrooms at existing storage
- Large enough for use as classrooms
- Need floor, ceiling, and wall finishes
- Need to add second means of emergency egress
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Middle / High School
- Additional Classrooms at second floor
ADDIT ITIO ION – SEC SECOND FLO FLOOR
(2) NE W CLAS S ROOMS (1) NE W S TAIR TOWE R AND RE NOVATE D CORRIDOR Total S
- Q. FT.: 2,750
- Approx. Total Project Cost: $982,000
AGENDA FEASIBILITY STUDY SAFETY & SECURITY SITE LIGHTING CAPITAL PROJ ECTS NEXT STEPS
Middle / High School
- Additional Classrooms at existing storage
CLAS S RO S S ROOM R RETROFI FIT
CONVE RT E XIS TING S TORAGE TO (2) CLAS S ROOMS (APPROX. 2070 S Q FT) E XCAVATE AND E XTE ND E XIS TING COURTYARD FOR E ME RGE NCY E GRE S S (APPROX. 3750 S Q FT)
- Approx. Total Project Cost: $680,000