UPPER MERION AREA SCHOOL DISTRICT FEASIBILITY STUDY AND DISTRICT MASTER PLANNING FACILITY ASSESSMENT PRESENTATION September 4, 2014 AGENDA 1. Master Planning Process 1 2. District Facility Conditions 2 3. Discussion 3 UPPER MERION AREA
- 1. Master Planning Process
- 2. District Facility Conditions
- 3. Discussion
1 2 3
AGENDA
UPPER MERION AREA SCHOOL DISTRICT 2
DISTRICT FACILITIES MUST SUPPORT LEARNING
The District must provide facilities that:
1. 1. Suppo pport ac achievement t an and ac d accomplishment t for r al all s stu tude dents th thro rough gh:
1. 1. Personal nalizat ation 2. 2. Enga ngage gement 3. 3. Connecti tion
- n
4. 4. Rigor, r relevanc ance a and relat ations nshi hips ps
2. 2. Suppo pport s stu tude dent t learn arners, adu adult l lear arners an and o d our r commu mmunity 3. 3. Max aximi mize s syste tems to to impr mprove security, ai air r qu qual ality, c comf mfort, l ligh ghti ting an and d energy rgy efficie ciency cy 4. 4. Built f t for r susta tainability ty f fro rom m an an edu ducation an and d infra rastructu ture pe pers rspective
UPPER MERION AREA SCHOOL DISTRICT 3
MASTER PLANNING PROCESS
UPPER MERION AREA SCHOOL DISTRICT 4
MASTER PLANNING PROCESS
Month Activity
2014 2014 Jun une/ e/Jul uly Conduct Facilit cility A y Assessments Jul uly/Aug ugus ust Develo lop A Analy lysis is Sep eptem ember er Presentatio ion of Facilit cility A y Assessment Octobe ber Presentati ation o
- f Capac
acity ty v
- vs. E
Enrollme ment t Projecti tions No Novem ember Opti ptions W Works rkshop Decem ember er Developme ment of Opti ptions an and d Costs ts 2015 2015 Januar ary Pre resenta tation o
- f Opti
ptions Feb eb Presentation
- n of
- f Option
- n Re
Revision
- ns
Marc rch Presentati ation o
- f Final
al M Master P Plan an
5 UPPER MERION AREA SCHOOL DISTRICT
DISTRICT FACILITY CONDITIONS
UPPER MERION AREA SCHOOL DISTRICT 6
CANDLEBROOK ELEMENTARY UPPER MERION HIGH UPPER MERION MIDDLE CALEY ELEMENTARY BRIDGEPORT ELEMENTARY ROBERTS ELEMENTARY UPPER MERION ADMINISTRATION
UPPER MERION SCHOOL DISTRICT
BUS & MAINTENANCE FACILITY
GULPH SCHOOL BOAT HOUSE BELMONT SCHOOL
7
UPPER MERION AREA SCHOOL DISTRICT
FACILITY ASSESSMENT
The Facility Assessments:
1. 1. Include de only t those renovati ations necessar ary t to upgrade ade a all b buildi ding g systems ms 2. 2. Include de nec eces essary Co Code a e and ADA up upgrades es 3. 3. Include de re renovations to to impr mprove security ty, ai air r qu qual ality ty, c comf mfort, t, l ligh ghting an and d energy e y effici ciency cy 4. 4. Do n not include de educat ational al r reconfigu gurati ation 5. 5. Do n not include de add additi tions to to ac accommodate e enro rollme ment gro growth
UPPER MERION AREA SCHOOL DISTRICT 8
9
BRIDGEPORT ELEMENTARY SCHOOL
Facility Assessment
Built ilt 1999 1999
UPPER MERION AREA SCHOOL DISTRICT
10 UPPER MERION AREA SCHOOL DISTRICT
SCHRADERGROUP architecture, LLC
programming I planning I architecture
11 UPPER MERION AREA SCHOOL DISTRICT 11
12
INDICATES BUILDING SUPPORT SPACE CURRENTLY BEING USED AS EDUCATIONAL SPACE
UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 13
INDICATES BUILDING SUPPORT SPACE CURRENTLY BEING USED AS EDUCATIONAL SPACE
BRIDGEPORT ELEMENTARY SCHOOL
Hi High ghlights
1. 1. HVAC syste tem c m contr trols s should d be be upgr pgraded in th the near f ar futu ture re 2. 2. Lighti ting u g upgrade ades 3. 3. Provide e sec ecur urity up upgrades es 4. 4. Possib ible le ro roof re repl placeme ment in th the near ar fut utur ure 5. 5. Possible gas gas serv rvice to to th the f fac acility in l lieu o
- f pro
propane
14 UPPER MERION AREA SCHOOL DISTRICT
15 UPPER MERION AREA SCHOOL DISTRICT
BRIDGEPORT ELEMENTARY SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 2, 2,160, 160,77 775 Soft Co Costs sts @ @ 20% $ $ 432, 432,155 155 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ $ 2, 2,592, 592,93 930
16 UPPER MERION AREA SCHOOL DISTRICT
17
CALEY ELEMENTARY SCHOOL
Facility Assessment
Built 1966 1966
UPPER MERION AREA SCHOOL DISTRICT
18 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 19
UPPER MERION AREA SCHOOL DISTRICT 20
CALEY ELEMENTARY SCHOOL
Hi High ghlights
1. 1. Exten ensive e site up e upgrades es r req equi uired 2. 2. Enviro ronmental re reme mediati tion re requ quired 3. 3. HV eq equi uipmen ent i is 48 ye 48 years ol
- ld a
and ob
- bsol
- lete (
(far e exceeds A ASH SHRA RAE E ser ervice l e life o e of 25 years ars) 4. 4. Lighti ting u g upgrade ades 5. 5. Electrical serv rvice an and di d distributi tion is obs bsolete an and i d in po poor c r condi diti tion 6. 6. IT i T infrastruc uctur ure need eeds to be up e upgraded ed 7. 7. No fire re pro prote tection s system pro provided 8. 8. Exte teri rior windo dow an and d exte teri rior s syste tems o
- bs
bsolete te 9. 9. Remo move an and d re repl place e existi ting ro roof system 10.
- 10. Gen
ener eral f finishes es obsole lete i inclu ludin ing c casework 11.
- 11. Numerous A
ADA acce cessib ibil ilit ity y and complia liance ce i issues 12.
- 12. Sec
ecur urity up upgrades req equi uired 13.
- 13. Food s
ser ervice eq e equi uipmen ent o
- bsolet
ete
21 UPPER MERION AREA SCHOOL DISTRICT
22 UPPER MERION AREA SCHOOL DISTRICT
CALEY ELEMENTARY SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $11, $11,985 985,49 494 Soft Co Costs sts @ @ 20% $ $ 2, 2,397, 397,09 099 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $14, $14,382 382,59 593
23 UPPER MERION AREA SCHOOL DISTRICT
24
CANDLEBROOK ELEMENTARY SCHOOL
Facility Assessment
Built 1999 1999
UPPER MERION AREA SCHOOL DISTRICT
25 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 26
UPPER MERION AREA SCHOOL DISTRICT 27
INDICATES BUILDING SUPPORT SPACE CURRENTLY BEING USED AS EDUCATIONAL SPACE
CANDLEBROOK ELEMENTARY SCHOOL
Hi High ghlights
1. 1. Ch Chiller er eq equi uipmen ent up upgrade e for en ener ergy ef efficiency 2. 2. HVAC C control up upgrade r e req equi uired ed thr hrougho hout 3. 3. Li Ligh ghting f fixtu ture u upgr pgrades 4. 4. Asphalt s t shingle roofing s g syste tem m ne nearing ng en end of us usef eful ul l life 5. 5. Sec ecur ure v e ves estibul ule up e upgrades es 6. 6. Various us f finish up upgrades es r req equi uired ed thr hrougho hout 7. 7. Minor s r site te u upgr pgrades ( (re reta taining wal all re repa pair an and tre d trees)
28 UPPER MERION AREA SCHOOL DISTRICT
29 UPPER MERION AREA SCHOOL DISTRICT
CANDLEBROOK ELEMENTARY SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ 2, $ 2,699, 699,81 815 Soft Co Costs sts @ @ 20% $ $ 539, 539,963 963 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 3, $ 3,239, 239,77 778
30 UPPER MERION AREA SCHOOL DISTRICT
31
ROBERTS ELEMENTARY SCHOOL
Facility Assessment
Built ilt 2000 2000
UPPER MERION AREA SCHOOL DISTRICT
32 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 33
UPPER MERION AREA SCHOOL DISTRICT 34
INDICATES BUILDING SUPPORT SPACE CURRENTLY BEING USED AS EDUCATIONAL SPACE
- 35
UPPER MERION AREA SCHOOL DISTRICT
ROBERTS ELEMENTARY SCHOOL
Hi High ghlights
1. 1. Ch Chiller er eq equi uipmen ent up upgrade e for en ener ergy ef efficiency 2. 2. HVAC C control up upgrade r e req equi uired ed throug ughout ut 3. 3. Li Ligh ghting f fixtu ture u upgr pgrades 4. 4. Aspha halt shi hing ngle r roofing ng system ne nearing ng e end nd of useful l life 5. 5. Sec ecur ure v e ves estibul ule up e upgrades es 6. 6. Various us f finish up upgrades es r req equi uired ed throug ughout ut 7. 7. Minor s r site te u upgr pgrades ( (pav pavement an and c d concrete re repa pair)
36 UPPER MERION AREA SCHOOL DISTRICT
ROBERTS ELEMENTARY SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 2, 2,156, 156,60 601 Soft Co Costs sts @ @ 20% $ $ 431, 431,320 320 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 2, 2,587, 587,92 921
37 UPPER MERION AREA SCHOOL DISTRICT
38
UPPER MERION AREA MIDDLE SCHOOL
Facility Assessment
Built ilt 2006 2006
UPPER MERION AREA SCHOOL DISTRICT
39 UPPER MERION AREA SCHOOL DISTRICT
40 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 41
UPPER MERION AREA SCHOOL DISTRICT 42
UPPER MERION AREA SCHOOL DISTRICT 43
UPPER MERION AREA SCHOOL DISTRICT 44
UPPER MERION AREA SCHOOL DISTRICT 45
UPPER MERION AREA MIDDLE SCHOOL
Hi High ghlights
1. 1. Dome mestic wate ater h heate aters are are re reac aching th the end d of th their r useful l life 2. 2. Upgr pgrade HVAC c contro trols at s at some me ti time me in th the futu ture re 3. 3. District ict-wi wide IT infras astr tructure s system u m upgrad ades 4. 4. Pro rovide man manufactu turer app approved c coat ating s system to to th the ro roof in th the near ar fut utur ure 5. 5. Lo Locke ker ro room u m upgra pgrades ( (chlorine corr rrosion) 6. 6. Repl place o
- ld
d gy gym m bl bleacher s syste tem 7. 7. Nata atatorium pi pipi ping is ori rigi ginal an and s d should d be be upgr pgraded
46 UPPER MERION AREA SCHOOL DISTRICT
47 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA MIDDLE SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 4, 4,900, 900,00 007 Soft Co Costs sts @ @ 20% $ $ 980, 980,001 001 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 5, 5,880, 880,00 008
48 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA HIGH SCHOOL
Facility Assessment
Built ilt 1960, 1960, Additions/Renovations 1994 1994
49 UPPER MERION AREA SCHOOL DISTRICT
50 UPPER MERION AREA SCHOOL DISTRICT
51 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 52
UPPER MERION AREA SCHOOL DISTRICT 53
UPPER MERION AREA HIGH SCHOOL
Hi High ghlights
1. 1. Exte tensive s site te work rk re requ quired ( (pav paving an and d sto torm rmwater) 2. 2. HVAC eq C equi uipmen ent has r rea eached ed the en e end o
- f its ser
erviceable e lif life 3. 3. Li Ligh ghting re repl placeme ment i in vari arious pl places 4. 4. Fire re al alarm s m syste tem i m is obs bsolete 5. 5. IT infras astr tructu ture, clocks, P PA, systems ms o
- bsolete
te 6. 6. Electrical syste tem upgra pgrades re requ quired as as w well as as eme merg rgency po power r sy syst stem 7. 7. Remo move an and re d repl place ro roof system 8. 8. Vari arious windo dow an and do d door s r systems re requ quire re repl placeme ment f for e r energy rgy efficie ciency ( cy (speci cifica ically s lly stair irways ys e etc.) 9. 9. Enviro ronmental re reme mediati tion re requ quired 10.
- 10. Gen
ener eral inter erior finish up upgrades es r req equi uired ed 11.
- 11. Ath
thleti tic an and pe d perf rformance are areas al all re requ quire updat pdating an and u d upgr pgrading 12.
- 12. Pool ti
tile an and d de deck re repa pair re requ quired 13.
- 13. ADA acce
ccessib ibil ilit ity a y and c complia liance ce issues ues 14.
- 14. Upda
pdate te food d serv rvice e equ quipm pment
54 UPPER MERION AREA SCHOOL DISTRICT
55 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA HIGH SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ 37, 37,613, 613,738 38 Soft Co Costs sts @ @ 20% $ $ 7, 7,522, 522,748 48 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 45, 45,136, 136,486 86
56 UPPER MERION AREA SCHOOL DISTRICT
57
ADMINISTRATIVE FACILITY
Facility Assessment
Built 1960 1960, Re Renov
- vation
- ns 2
2004
UPPER MERION AREA SCHOOL DISTRICT
58 UPPER MERION AREA SCHOOL DISTRICT
59 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 60
UPPER MERION AREA SCHOOL DISTRICT 61
ADMINISTRATIVE FACILITY
Hi High ghlights
1. 1. ADA an and s d sto torm rmwate ter u upgr pgrades re requ quired o
- n site
te 2. 2. Minor H r HVAC upda pdati ting to to occur at at some me po point 3. 3. Re Remov
- ve a
and r replace roof
- of system on
- n H.S.
- S. B
Boi
- iler Room
Room 4. 4. Lower er lev evel el r req equi uires es A ADA up upgrades es, el elec ectrical s ser ervice up upgrades 5. 5. H.S. Boiler er R Room up upgrades es r req equi uired ed 6. 6. H.S.
- S. B
Boi
- iler Room
Room fire alarm s system t to
- con
- nnect t
to
- Administrative
Facili cility
62 UPPER MERION AREA SCHOOL DISTRICT
63 UPPER MERION AREA SCHOOL DISTRICT
ADMINISTRATIVE FACILITY
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 949, 949,048 048 Soft Co Costs sts @ @ 20% $ $ 189, 189,810 810 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 1, 1,138, 138,85 858
64 UPPER MERION AREA SCHOOL DISTRICT
BELMONT SCHOOL
Facility Assessment
Bu Built ilt 1958 1958
65 UPPER MERION AREA SCHOOL DISTRICT
66 UPPER MERION AREA SCHOOL DISTRICT
67 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 68
BELMONT SCHOOL
Hi High ghlights
1. 1. Vari arious site te i impr mprovements an and u d upgr pgrades re requ quired 2. 2. HVAC eq C equi uipmen ent has r rea eached ed the en e end o
- f its us
usef eful ul life.
- e. Rec
ecommen end replac acement o t of syste tems ms. 3. 3. ADA upgr pgrades re requ quired th thro roughout. 4. 4. Water er s saving d dev evices es req equi uired ed 5. 5. Fac acility do does n not t currently h hav ave a a fire re pro prote tection s system 6. 6. Remo move an and re d repl place ro roof sy syst stem 7. 7. Electr trical al infras astr tructu ture u upgrade ades i includi ding c g clock a and P PA systems ms recomme mmende ded t d through ghout 8. 8. Windo dow an and do d door re r repl placeme ment re recommended for r energy rgy efficiency 9. 9. Oth ther r mi minor e r exte teri rior u upgr pgrades re recommended 10.
- 10. Upgrade f
fini nishe hes thr hrougho hout 11.
- 11. Enviro
ronmental re reme mediati tion re requ quired
69 UPPER MERION AREA SCHOOL DISTRICT
70 UPPER MERION AREA SCHOOL DISTRICT
BELMONT SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 6, 6,568, 568,05 057 Soft Co Costs sts @ @ 20% $ $ 1, 1,313, 313,61 611 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 7, 7,881, 881,66 668
71 UPPER MERION AREA SCHOOL DISTRICT
THE GULPH SCHOOL
Facility Assessment
Built ilt 1953, 1953, Additions 1973 1973
72 UPPER MERION AREA SCHOOL DISTRICT
73 UPPER MERION AREA SCHOOL DISTRICT
74 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 75
UPPER MERION AREA SCHOOL DISTRICT 76
THE GULPH SCHOOL
Hi High ghlights
1. 1. Vari arious site te i impr mprovements an and u d upgr pgrades re requ quired 2. 2. HVAC eq C equi uipmen ent has r rea eached ed the en e end o
- f its us
usef eful ul life.
- e. Rec
ecommen end replac acement o t of syste tems ms. 3. 3. ADA upgr pgrades re requ quired th thro roughout. 4. 4. Water er s saving d dev evices es req equi uired ed 5. 5. Fac acility do does n not t currently h hav ave a a fire re pro prote tection s system 6. 6. Remo move an and re d repl place ro roof system 7. 7. Electr trical al infras astr tructu ture u upgrade ades i includi ding c g clock a and P PA and fire al alar arm s syste tems re recomme mended th thro rough ghout 8. 8. Windo dow an and do d door re r repl placeme ment re recommended for r energy rgy efficiency 9. 9. Oth ther r mi minor e r exte teri rior u upgr pgrades re recommended 10.
- 10. Upgrade f
fini nishe hes thr hrougho hout 11.
- 11. Enviro
ronmental re reme mediati tion re requ quired
77 UPPER MERION AREA SCHOOL DISTRICT
78 UPPER MERION AREA SCHOOL DISTRICT
THE GULPH SCHOOL
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 6, 6,565, 565,32 324 Soft Co Costs sts @ @ 20% $ $ 1, 1,313, 313,06 065 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 7, 7,878, 878,38 389
79 UPPER MERION AREA SCHOOL DISTRICT
BUS GARAGE & MAINTENANCE
Facility Assessment
Built ilt 1968 1968
80 UPPER MERION AREA SCHOOL DISTRICT
81 UPPER MERION AREA SCHOOL DISTRICT
82 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 83
BUS GARAGE & MAINTENANCE
Hi High ghlights
1. 1. Vari arious s site te impr mprovements ts an and d upgr pgrades re requ quired ( (concrete, site te lig lightin ing, U USTs) 2. 2. Septi ptic s system re requ quiring mo month thly mai mainte
- tenance. C
Conside der c connection to
- city s
sewe wer 3. 3. Minor A r ADA upgr pgrades re requ quired 4. 4. Fac acility do does n not t currently h hav ave a a fire re pro prote tection s system 5. 5. Rep eplace a e and up upgrade m e mainten enance e eq equi uipmen ent 6. 6. Consider s security ty s syste tem u m upgrade ades 7. 7. Pro rovide a a fire re al alar arm syste tem
84 UPPER MERION AREA SCHOOL DISTRICT
85 UPPER MERION AREA SCHOOL DISTRICT
BUS GARAGE AND MAINTENANCE
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ 552, 552,861 861 Soft Co Costs sts @ @ 20% $ $ 110, 110,572 572 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 663, 663,433 433
86 UPPER MERION AREA SCHOOL DISTRICT
BOAT HOUSE
Facility Assessment
Built ilt 1987 1987
87 UPPER MERION AREA SCHOOL DISTRICT
88 UPPER MERION AREA SCHOOL DISTRICT
89 UPPER MERION AREA SCHOOL DISTRICT
UPPER MERION AREA SCHOOL DISTRICT 90
BOAT HOUSE
Hi High ghlights
1. 1. Woode den bo boat do at dock k is fifte teen y years ars o
- ld.
- d. Consider re
repl placement 2. 2. Genera ral A ADA upgra pgrades re requ quired 3. 3. Up Upgrade ex e exter erior finishes 4. 4. Upgr pgrade i inte teri rior f finishes 5. 5. Remo move an and d re repl place e existi ting ro roof
91 UPPER MERION AREA SCHOOL DISTRICT
92 UPPER MERION AREA SCHOOL DISTRICT
BOAT HOUSE
Co Concept ptual al R Renovat atio ion C Costs
Co Constructi tion Co Cost st $ $ 689, 689,959 959 Soft Co Costs sts @ @ 20% $ $ 137, 137,992 992 GRAN AND T TOTAL AL P PROJECT C T COSTS TS $ 827, 827,951 951
93 UPPER MERION AREA SCHOOL DISTRICT
SUMMARY ESTIMATED COSTS
UPPER MERION AREA SCHOOL DISTRICT
BUILDING Est. Soft Costs TOTAL COSTS
- Const. Costs
(@ 20 %) Bridgeport Elementary School $ 2,160,775 $ 432,155 $ 2,592,930 Caley Elementary School $ 11,985,494 $ 2,397,099 $ 14,382,593 Candlebrook Elementary School $ 2,699,815 $ 539,963 $ 3,239,778 Roberts Elementary School $ 2,156,601 $ 431,320 $ 2,587,921 Upper Merion Area Middle School $ 4,900,007 $ 980,001 $ 5,880,008 Upper Merion Area High School $ 37,613,738 $ 7,552,748 $ 45,136,486 Upper Merion Area Admin Building $ 949,048 $ 189,810 $ 1,138,858 Belmont School $ 6,568,057 $ 1,313,611 $ 7,881,668 Gulph School $ 6,565,324 $ 1,313,065 $ 7,878,389 Bus Garage & Maintenance $ 552,861 $ 110,572 $ 663,433 The Boat House $ 689,959 $ 137,992 $ 827,951 TOTALS $ 76,841,679 $ 15,368,336 $ 92,210,015
94