Expedited Delivery System for Energy Efficiency Projects What is - - PowerPoint PPT Presentation

Expedited Delivery System for Energy Efficiency Projects What is The Energy Network? The Energy Network strives to achieve an unprecedented level of energy savings across Southern California. Who Is In The Network? Developed Projects 53


slide-1
SLIDE 1

Expedited Delivery System for Energy Efficiency Projects

slide-2
SLIDE 2

What is The Energy Network?

The Energy Network strives to achieve an unprecedented level of energy savings across Southern California.

slide-3
SLIDE 3

Who Is In The Network?

slide-4
SLIDE 4

53

Enrolled Public Agencies

140

Facilities

108

Active Projects

29k

Streetlights

665

Construction Jobs

$61m

Construction Value

52 million

kWh Savings

65,000

Therm Savings

3,700

kW Savings Identified Savings

Developed Projects

slide-5
SLIDE 5

Participating Water Agencies

  • Western Riverside County Regional Wastewater Authority
  • Western Municipal Water District
  • Running Springs Water District
  • Eastern Municipal Water District
  • Yucaipa Valley Water District
  • Orange County Sanitation District
  • Cucamonga Valley Water District
  • Jurupa Community Services District
  • Inland Empire Utilities Agency
  • City of Ventura
  • City of Oxnard
  • City of Barstow
  • City of Downey
  • City of Santa Barbara
slide-6
SLIDE 6

Conditions and circumstances of water availability is driving a major energy paradigm shift – away from historic technologies

Changing Water-Energy Landscape

slide-7
SLIDE 7

What is Your Energy Bill Costing You? Water and wastewater facilities can reduce their electricity cost by as much as 40 percent Older buildings can waste 30 percent or more of the energy they consume

slide-8
SLIDE 8

The Opportunities are Many…

  • Primary clarifiers
  • Mixing
  • Aeration
  • Nitrogen removal
  • Sludge handling
  • Variable speed drives
  • UV disinfection
slide-9
SLIDE 9

…So Are the Challenges

  • In-house technical expertise
  • Staffing for project management
  • Onerous procurement process
  • Prioritizing energy efficiency projects
  • Incentive and rebate procedures
  • Persistence of savings
slide-10
SLIDE 10

…So Are the Challenges

  • Energy is the second highest cost, after labor, for

most water/wastewater utilities,

  • it is usually 10th in the ranking of utility priorities.

Many agencies lack internal staff resources and technical expertise to fully investigate deep energy retrofit opportunities.

slide-11
SLIDE 11

A full range of energy efficiency services:

  • Project management
  • Comparative energy use analysis of facilities
  • Investment grade energy audits
  • Performance specifications
  • Contractor Scope of Work development
  • Construction management support services
  • Expedited construction procurement services
  • Financial services provided by PFM
  • Ongoing energy management tools
  • Objective third party review

Your One Stop Resource

slide-12
SLIDE 12

Turnkey Project Delivery

Project Management Water Infrastructure Reliability and Energy Engineering Services Pools of Highly Qualified Mechanical, Lighting and Streetlight Contractors

Comparative Energy Analysis Audit Design Project Proposals

  • Prepare Proposal
  • Financing Analysis
  • Proposal Review and

Acceptance

  • Agency issues Purchase

Orders

Construction

slide-13
SLIDE 13

Competitive Procurement

  • n behalf of

Public Agencies Indefinite Quantity Construction Contracts ezIQC System

  • Transparent and

firm pricing

  • Contractors on

call to Perform Energy Retrofits

Simplified Procurement

Indefinite Quantity Construction Contracting

slide-14
SLIDE 14

Competitively Bid Pools of Contractors

Open, transparent, competitive Aggregate procurement Highly qualified lighting & mechanical contractors Purchase Order Your Agency

slide-15
SLIDE 15

Start Construction in Half the Time

slide-16
SLIDE 16

A Novel Approach to Operational Efficiency

Process-Based Energy Management Strategy (PBEMS)

  • Development of energy use profile
  • Identify process interactions
  • Risk mitigation
  • Regulatory compliance
  • Reduce wasted energy
  • Long-Term Planning
slide-17
SLIDE 17

Optimizing the Water-Energy Nexus

  • Reducing energy usage requires a major shift in

HOW and WHY work is performed and energy is used

  • Energy optimization is based upon a Best-Fit Curve
  • f energy use for the work to be performed
slide-18
SLIDE 18

You cannot optimize what you are not measuring If you are not measuring it, you cannot optimize it.

Measurement

slide-19
SLIDE 19

Assessment

  • What needs to be done?

Functional Analysis

  • How is it being done?

Condition Assessment

  • Can it be done better?

Technology Gap Analysis

  • Does it change risk?

Risk Analysis Know how and where energy is used and for what purpose

slide-20
SLIDE 20

Optimization

  • Change applied energy to fit the demand curve, or
  • Change the demand condition to match desired energy profile

Use exactly enough energy to perform the required work

slide-21
SLIDE 21

Phase 1: Immediate Implementation

slide-22
SLIDE 22

Phase 2: Capital Improvement Projects

slide-23
SLIDE 23

Streamlined Approach

Featured Project: Cucamonga Valley Water District

  • Project Completion Deadline:

Summer ‘15

  • Enrollment Date: Oct. ‘14
  • Est. Date of Comp: June ‘15
  • Cost of Delay: $19,000/month
slide-24
SLIDE 24

CVWD: By the Numbers

Energy Savings

1,743,538 kWh / 173 kW

Annual Cost Savings

$210,828

Measure Costs

$961,050

Utility Incentives

$165,368

Integrated Approach w/ Investor Owned Utilities

0% Interest OBF (SCE) Loan for $795,682

slide-25
SLIDE 25

Deep Retrofits

Featured Project: Orange County Sanitation District Phased approach includes:

  • Process measures
  • Equipment retrofits
  • Interior/exterior lighting
  • Collection System
slide-26
SLIDE 26

OCSD: By the Numbers

Energy Savings

6,214,338 kWh / 1,169 kW

Annual Cost Savings

$679,755

Measure Costs

$2,091,370

Utility Incentives

$626,376

Integrated Approach w/ Investor Owned Utilities

+

slide-27
SLIDE 27

Holistic Approach

Featured Project: Yucaipa Valley Water District

  • Evaluated measures

at all agency facilities

  • Process measures at

treatment plant

  • Distribution system
  • ptimization
  • Whole building

lighting & mechanical measures

slide-28
SLIDE 28

YVWD: By the Numbers

Energy Savings

1,002,053 kWh / 124 kw

Annual Cost Savings

$132,351

Measure Costs

$518,816

Utility Incentives

$112,672

Integrated Approach w/ Investor Owned Utilities

+

slide-29
SLIDE 29

Celebrate Your Success

Help promoting your project to your elected

  • fficials, media and community
slide-30
SLIDE 30

Utility Coordination

The Energy Network SoCalGas Southern California Edison

slide-31
SLIDE 31
  • Partnerships
  • New Model
  • Transparency
  • Simple, Turnkey
  • Flexible and

customized solutions

  • Limited time

The Energy Network