3/23/2020 Plans for 2020 H ighlights Transportation Surtax Project Joint CAC & TAC, 16 December p l a n h i l l s b o r o u g h . o r g 1 TRANSitFORMATION HART AT WORK FOR YOU Powered by All for Transportation Surtax


  1. 3/23/2020 Plans for 2020 H ighlights Transportation Surtax Project Joint CAC & TAC, 16 December p l a n h i l l s b o r o u g h . o r g 1 TRANSitFORMATION HART AT WORK FOR YOU Powered by All for Transportation Surtax October 21, 2019 2 1

  2. 3/23/2020 Enhancing Bus Service Highlights 45% Enhancing Bus Service • Restore Service • 41 – Sligh Avenue INSERT MAP from MIKE • 46 – Palmetto Beach • 4 – South Tampa • 44 – University Circulator • Improve Weekend Frequency • 42/45 – University {30} • NEW 31 – So. County {60} • 15 – Columbus {30} • 32 – MLK {30} 9 – 30 th Street {30} • • Improve Weekday Frequency • 42/45 – University {30} • 30 – Kennedy {15} • 32 – MLK {15} 12 – 22 nd Street {30} • 3 3 Expanding Public Transit Options Highlights 35% Expanding Public Transit Options (Fixed-Guideway) • Corridor Assessments • Future Streetcar Extensions • CSX Evaluation • InVision Tampa Streetcar • Project Partner • The City of Tampa • Project Development • Marion Transitway Corridor Assessment 4 4 2

  3. 3/23/2020 Remaining Funds Highlights 20% Remaining Funds • Planning: TDP Vision • Service: Fill State and County Funded Service Gaps • Reserve allocation • Bus Stops and Transit Centers • Real Estate • Maintenance and Technology • Administration • Fund Existing Services 5 5 HART At Work For You 2020 Impact Highlights of Planned Investments Frequency Improvement & Service Expansion $32m  86+ route miles of restored service  5 weekday and 6 weekend routes improved Customer Amenity Improvements $5.9m  transit centers, shelters and bus stops Payment Modernization $6.6m  Introduction of a regional electronic payment system Rolling Stock $46m  10 pilot Battery Electric Buses, 56 CNG  53 non-revenue vehicles 6 6 3

  4. 3/23/2020 City o f T a mpa Surta x fo r T ra nspo rta tio n I mpro ve me nts 2020 Proje c t Plan 7 AF T 2020 Pro je c t Pla n: Buc ke ts & Pro je c t T ype s Mainte nanc e Bike / Pe d Pr oje c t T ype s Pr oje c t T ype s: Conge stion Safe ty & Vulne r ability Ne twor k     Citywide Pr ogr ams     Corridor Proje c ts   Conge stion & Inte rse c tion Proje c ts   Ne ighbor hood Impr ove me nts   Walk/ Bike Pr oje c ts    Br idge & Se awall Pr oje c ts  T ransit Proje c ts Transportation Surtax – City of Tampa Proposed 2020 Project Plan 8 8 4

  5. 3/23/2020 Pro g ra ms & Pro je c t T ype s 9 2020 Pr ojec t Pl an: B y the Number s 10 5

  6. 3/23/2020 2020 Surtax Project Plan IOC Meeting ‐ October 21, 2019 11 11 SURTAX CATEGORIES AND PROJECT TYPES Mainte nanc e Conge stion Safe ty Bike / Pe d Re maining & Vulne r ability Ne twor k F unds Pr oje c t T ype s Pr oje c t T ype s:    Mainte nanc e & Asse t Pr e se r vation      Corridor Comple te Stre e ts   Countywide T r ails      E xpande d Safe ty L ighting      Inte rse c tion Ope rations & Safe ty Impr ove me nts     Safe Route s to Sc hool     Smar t T r affic Ne twor k  Corridor Comple te Stre e ts with Ve hic ular Capac ity 12 12 6

  7. 3/23/2020 SURTAX ALLOCATION DISTRIBUTION 13 13 C ITY OF T EMPLE T ERRACE 2020 S URTAX P ROJECT P LAN R EVISION 14 7

  8. 3/23/2020 PROJECT NAME: PROJECT SURTAX CATEGORY(S): SOUTH OF TEMPLE TERRACE GOLF AND ☒ Maintenance and Vulnerability COUNTRY CLUB MILL AND OVERLAY AND FULL DEPTH ☐ Congestion Reduction RECLAMATION PAVEMENT ☒ Safety Improvements IMPROVEMENTS ☐ Network Improvements PROJECT TYPE: PROJECT DESCRIPTION: ROADWAY IMPROVEMENTS/ MAINTENANCE 12,430 LF of Mill and Overlay (M/O) south of the Temple Terrace Golf and PROJECT COST ESTIMATE: $905,000.00 Country Club per the Temple Terrace 2012 Pavement Management Plan PROJECT GOALS: To remediate current conditions of the existing pavement and create a safe roadway for the citizens of the City of Temple Terrace. 15 PROJECT SURTAX CATEGORY(S): PROJECT NAME: WEST AND EAST RIVER ☒ Maintenance and Vulnerability DRIVE FULL DEPTH RESTORATION (FDR) ☐ Congestion Reduction PAVEMENT IMPROVEMENTS ☒ Safety Improvements ☐ Network Improvements PROJECT TYPE: ROADWAY IMPROVEMENTS/ PROJECT DESCRIPTION: MAINTENANCE 8,930 LF of Full Depth Restoration PROJECT COST ESTIMATE: (FDR) along East and West River Drive, $745,000.00 Falmouth Street and Lamont Place per the Temple Terrace 2012 Pavement Management Plan PROJECT GOALS: To remediate current conditions of the existing pavement and create a safe roadway for the citizens of the City of Temple Terrace. 16 8

  9. 3/23/2020 PROJECT SURTAX CATEGORY(S): PROJECT NAME: PAVEMENT ☒ Maintenance and Vulnerability IMPROVEMENTS BETWEEN ☐ Congestion Reduction E WHITEWAY DRIVE AND DRUID HILLS ROAD ☒ Safety Improvements ☐ Network Improvements PROJECT TYPE: ROADWAY PROJECT DESCRIPTION: IMPROVEMENTS/ 12,100 LF of Full Depth Restoration and MAINTENANCE 2,700 LF of Mill and Overlay between E PROJECT COST ESTIMATE: Whiteway Drive and Druid Hills Road $1,200,000.00 from N 56th Street to N Riverhills Drive per the Temple Terrace 2012 Pavement Management Plan PROJECT GOALS: To remediate current conditions of the existing pavement and create a safe roadway for the citizens of the City of Temple Terrace. 17 Hillsborough County Transportation Surtax Projects Plan 2020 October 21, 2019 18 9

  10. 3/23/2020 Neighborhood Streets ESTIMATED LENGTH CONSTRUCTION STREET NAME (miles) COST E LAURA STREET 0.31 $93,000 E RENFRO STREET 0.75 $225,000 E WARREN STREET 0.75 $225,000 E OHIO STREET 0.66 $198,000 NIAGARA STREET 0.05 $15,000 TOTAL 2.52 $756,000 19 Neighborhood Streets ESTIMATED LENGTH CONSTRUCTION (miles) COST STREET NAME WHITEHALL ST 0.28 $84,000 NOSLEDA ST 0.26 $78,000 ACACIA DR 0.06 $18,386 W LOWRY AVE 0.49 $147,000 WAVER ST 0.24 $72,000 VIOLET ST 0.22 $66,000 N PLANT AVE 0.11 $33,000 N MAGNOLIA ST 0.11 $33,000 N MOBLEY ST 0.11 $33,000 FIG ST 0.12 $36,000 LEMON ST 0.18 $54,000 PLUM ST 0.16 $48,000 N EDWARDS ST 0.22 $66,000 MAYS ST 0.21 $63,000 N RITTER ST 0.16 $48,000 VIOLET ST 0.22 $66,000 PINECREST ST 0.05 $15,552 CASSELL ST 0.06 $16,708 TOTAL 3.26 $977,646 20 10

  11. 3/23/2020 Neighborhood Streets ESTIMATED LENGTH CONSTRUCTION (miles) COST STREET NAME MILTON PL 0.04 $11,860 CUMMINGS PL 0.09 $27,399 NOHLCREST PL 0.10 $30,925 ALCOTT AVE 0.35 $105,000 KILMER DR 0.75 $225,000 KILMER PL 0.17 $51,000 SANDBURG LOOP 0.20 $59,189 SILVER MEADOW WAY 0.55 $165,000 SILVER GLEN CT 0.03 $8,991 TOTAL 2.28 $684,363 21 Q uest i ons & Di scussi on For m or e i nf or m at i on, pl ease vi si t : pl anhi l l sbor ough. or g/ i ndependent - over si ght - com m i t t ee/ p l a n h i l l s b o r o u g h . o r g 22 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.